Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 28, 2015 FBO #4933
SOLICITATION NOTICE

Y -- Design-Build Phase 1-2 1st Calvary Headquarters, Renovate Bldg 28000, Ft Hood TX - Package #1

Notice Date
5/26/2015
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Fort Worth, Attn: CESWF-CT, PO Box 17300, Fort Worth, Texas, 76102-0300, United States
 
ZIP Code
76102-0300
 
Solicitation Number
W9126G-15-R-0070
 
Archive Date
6/24/2015
 
Point of Contact
Robert M. Duran, Phone: 8178861070, John H Rodgers,
 
E-Mail Address
robert.m.duran@usace.army.mil, john.h.rodgers@usace.army.mil
(robert.m.duran@usace.army.mil, john.h.rodgers@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
W9126G-15R-0070_Appendix B-Building 28000 asbuilts W9126G-15R-0070_Appendix E-Fort Hood IDG W9126G-15R-0070_1st Calvary HQ Bldg 28000 Ft Hood TX DESIGN-BUILD PHASE 1 of 2. Project: 1st Calvary Headquarters, Building 28000 located at Fort Hood, Texas. NO SITE VISIT WILL BE SCHEDULE FOR PHASE I. The Government is seeking qualified, experienced sources capable of performing the design and construction for the 1st Calvary Headquarters, Building 28000 at Fort Hood, Texas. Projects shall include the total exterior, interior and site restoration of the 1st Calvary Headquarters, Building 28000 at Fort Hood, Texas. A re-locatable package will need to be included in the project to provide temporary facilities for current operations to be conducted. Proposed location is south of building 28000. Project scope shall include, but not be limited to, the following: 1. Exterior of Building: a. Repair exterior façade of building. b. Replace windows to confirm to ATFP standards. c. Reseal all openings 2. Interior of Building: a. Repair all systems to include: HVAC, plumbing, electrical, communications, fire protection, mass notification. b. Reconfigure floor plan to meet current standards for a Division Headquarters and optimizing available space. c. Replace elevator 3. Site: a. Repair existing site conditions to include east and west parking areas. b. Repair command roadway and parking area. c. Repair force protection gates and bollards d. Remove all unused pavement e. Replace sidewalks f. Ensure site is ADA compliant 4. Re-locatable package: a. Temporary facilities must be able to accommodate 400 personnel south of building 28000. KNOWN CONDITIONS: 1. Building contains asbestos and possible lead base paint. Ensure study is complete and include in construction project 2. Ensure sufficient power is available to support all communication nets, servers, etc. for Building 28000. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform a complete renovation of 1st Calvary Headquarters, Building 28000 at Fort Hood, Texas, as specified within this RFP. All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements. The Contractor shall be the architect/engineer and constructor of record on this project. The United States Army Corps of Engineers (USACE) is committed to excellence in design and construction activity. The design and construction shall be an integrated approach that achieves the highest quality of operations and aesthetics in meeting the requirements of the building's users while, at the same time, is cost effective and establishes economical and efficient synergy among the systems and spaces applicable to the structure as a whole. The Contractor shall be responsible for the professional quality, constructability, technical accuracy, and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, structural, mechanical, electrical, civil, and other architectural and engineering features of the work shall be accomplished, reviewed, and approved by professionals licensed to practice in their respective professional field in the United States. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation shall alleviate the Contractor from performing any additional design as required to produce a complete set of construction documents. In accordance with Department of Defense Federal Acquisition Regulation Supplement, DFAR 236.204(ii) Disclosure of the magnitude of construction project, the price ranges for the Project, 1st Calvary Headquarters, Building 28000 at Fort Hood, Texas, is between $25,000,000.00 and $100,000,000.00. Estimated duration of the project is 900 calendar days from notice to proceed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/W9126G-15-R-0070/listing.html)
 
Place of Performance
Address: Fort Hood, TX, Killeen, Texas, 76544, United States
Zip Code: 76544
 
Record
SN03741674-W 20150528/150526234255-2e06d233142241b10ff545da95d87d8b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.