MODIFICATION

Y -- CAUTION TO BIDDERS

Notice Date
5/26/2015
 
Notice Type
Modification/Amendment
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
SWPA (Tulsa)U.S. DEPT OF ENERGYSOUTHWESTERN POWER ADMINISTRATIONONE WEST THIRD STREETTulsaOK74103-3502US
 
ZIP Code
00000
 
Solicitation Number
DE-SOL-0008368
 
Archive Date
7/9/2015
 
Point of Contact
Sean L. Long
 
Small Business Set-Aside
N/A
 
Description
THE FOLLOWING ITEMS HAVE BEEN IDENTIFIED AS NEEDING CONSDIERATION IN BIDDING THIS PROJECT: 1. Several poles have rotten tops. 2. Over 100 hot crossings/road crossings that will need to be guarded. Not all are visible from the road. 3. Access to pull sights in some cases may be VERY difficult. 4. Noted dozens of mid span sleeves that may need to be cut out before pulling the new fiber in with the old. (Helicopter work.) 5. Existing Knee braces will dictate that bayonets be installed on most strs. to hang a traveler from. 6. General access is very limited. In some places there is not access. This project MAY need to be constructed with a helicopter. 7. Several river crossings. 8. Limited set up area in and around substations for pulling equipment. A KMZ FILE IS AVAILABE FOR VIEWING IF REQUESTED FROM SEAN.LONG@SWPA.GOV Pre-Bid meeting Questions 1. Can we use the existing static wire to pull in the new OPGW. Answer: Yes if the old static wire will support the pull. Question 2. I did not find the liquidated damages that would be accessed if the project does not meet the completion requirements. What are the liquidated damages for this project? Answer: There are no per say liquidated damages. However, if you do not complete the project in time and need a time extension, depending on the circumstances, I will ask for consideration for that extension in terms of what my inspector costs or if any revenue is lost in terms of not being able to generate and supply power, I may seek those loses as well. Question 3. Is the pre-bid mandatory? Anwser: NO.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0008368/listing.html)
 
Record
SN03742728-W 20150528/150526235216-333ce8d2f9798244718bf2c2208735ed (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.