Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 30, 2015 FBO #4936
SOURCES SOUGHT

67 -- Furnish and Install Projectors in Classrooms

Notice Date
5/28/2015
 
Notice Type
Sources Sought
 
NAICS
334118 — Computer Terminal and Other Computer Peripheral Equipment Manufacturing
 
Contracting Office
MICC - West Point, Directorate of Contracting, ATTN: SFCA-NR-WP, 681 Hardee Place, West Point, NY 10996-1514
 
ZIP Code
10996-1514
 
Solicitation Number
0010696729
 
Response Due
6/5/2015
 
Archive Date
7/27/2015
 
Point of Contact
Joseph R. Bloss, 845-938-2221
 
E-Mail Address
MICC - West Point
(joseph.r.bloss@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Scope of work: Upgrade 22 classrooms and 2 labs to interactive projectors, USB and HDMI. Classroom Installation: Install new interactive projector, Touch unit and control pad per Manufacturer's instructions. Projector must be positioned and calibrated correctly with the 94 quote mark Da-Lite IDEA Board that it will be projecting on. Existing cables will need to be pulled from the current projector, ran through the ceiling to the new projector and back to the wall plate located next to the podium. Existing cables include 2 VGA-A cables, Ethernet and Video/ L&R audio cable for VCR. The following connections will need to be available at the podium going back to the projector through the wall plate (will require a new wall plate): o 2 x VGA-A (will require a VGA switcher since there is only 1 VGA connection on projector) o 2 x HDMI o Video/L&R audio o Ethernet o USB Current Extron audio amplifier and speakers must be connected to the projector. Lab Installation: Install 3 new interactive projectors, Touch units and control pads per manufacturer's instructions. Projector must be positioned and calibrated correctly with the 94 quote mark Da-Lite IDEA Board that it will be projecting on. All 3 projectors must project as one single image using HDMI, mirroring the current 3 monitor configuration. Connections from the computer must connect through a wall plate going back to the projectors. Connections to each projector must include: HDMI, USB and Ethernet. Additional Requirements: All cables must be run through conduit going into the ceiling. All cables must be neatly grouped and properly ran through the ceiling. All connections to projectors must be tested and approved by customer. All functions of the interactive projectors must be tested and approved by customer. Connections must be labeled on each wall plate. All cables will be properly labeled on each end. All responsible parties that feel they can provide this requirement should forward their capabilities in writing to Joseph.r.Bloss.civ@mail.mil. Please indicate your business size (Small, Large etc...). This notice will close on Friday, June 5,2015 by 1100 EDT). Please note that this is not a solicitation but a sources sought only.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/9bcd6be3b964a393cda54ed78c8b95a8)
 
Place of Performance
Address: MICC - West Point Directorate of Contracting, ATTN: SFCA-NR-WP, 681 Hardee Place West Point NY
Zip Code: 10996-1514
 
Record
SN03745538-W 20150530/150529040022-9bcd6be3b964a393cda54ed78c8b95a8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.