Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 05, 2015 FBO #4942
SOLICITATION NOTICE

Z -- Idaho Panhandle NF, Bonners Ferry RD, Spring Creek AOP

Notice Date
6/3/2015
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
 
ZIP Code
83815-8363
 
Solicitation Number
AG-02RC-S-15-0093
 
Point of Contact
Rita J. Loper, Phone: 2087657497, Josh Nelson, Phone: (208) 765-7257
 
E-Mail Address
rloper@fs.fed.us, jnelson@fs.fed.us
(rloper@fs.fed.us, jnelson@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Bonners Ferry Ranger District of the Idaho Panhandle National Forests (IPNF) will solicit for Spring Creek AOP. This project includes removal of an existing 18 inch culvert and replacing with a larger 72 inch diameter that is countersunk by approximately 3 feet. Constructing a stream channel through the pipe and installing grade controlling within the culvert. Work also includes reconstructing the road to maintain a minimum cover over the culvert, installing a new 18 inch ditch relief culvert near the site and resurfacing the reconstructed section of road over the two new culverts. This work includes acquiring Stream Bed material and Class 4 Riprap from two separate government source areas and hauling the material. The project location may be reached by taking HWY 95 north out of Bonners Ferry, Idaho. Travel along highway 95 north for approximately 3 miles and turn east (right) onto HWY 2 at the Three Mile Junction. Continue East for approximately 2 miles and turn North (left) onto Meadow Creek Road (County road #34). Follow Meadow Creek Road for nearly 10.8 miles from the highway intersection. After crossing the Moyie River, turn East (right) onto Deer Creek Road (Forest Service Road #2541). Follow along the Deer Creek Road after approximately 1.1 miles to the junction with Forest Service Road #2540. Turn North (left) onto Forest Service Road #2540 and continue northbound until arrived at project area. The Project Site is at 48°50'5.90'N, 116° 8'13.00'W in Section 1, T63N, R2E, Boise Meridian. Price range between $25,000 and $100,000. Estimated start July 15, 2015 with 30 days contract time. Solicitation to be issued on or around June 18, 2015.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-15-0093/listing.html)
 
Place of Performance
Address: Bonners Ferry Ranger District, Bonners Ferry, Idaho, United States
 
Record
SN03751532-W 20150605/150603234850-adcbc1f89084f794e0a091c4a8edcdd8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.