Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 19, 2015 FBO #4956
SOLICITATION NOTICE

Y -- Replacement of the American Canal- Upper Reach in El Paso, TX

Notice Date
6/17/2015
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Acquisition Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
IBM15------TBD
 
Point of Contact
Fabiola Palma-Trujillo, Phone: 9158324715
 
E-Mail Address
fabiola.trujillo@ibwc.gov
(fabiola.trujillo@ibwc.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
This is Only a Presolicitation Notice. A forthcoming solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a proposal to be considered by the Agency when the solicitation is posted. This is NOT a request for proposal. Please do not submit a proposal in response to this Presolicitation Notice. Replacement of the American Canal-Upper Reach in El Paso, Texas General Description of the Work - The work for this project generally consists of the demolition of reinforced concrete open channel canal, and replacement with a new open canal and a reinforced concrete closed conduit flow conveyance structure. This proposed project is part of a larger project to rebuild the deteriorated, concrete-lined American Canal, which is located in El Paso, Texas. The American Canal begins at the American Diversion Dam, near the intersection of Executive Center Boulevard and West Paisano Drive (U.S. Highway 85), and extends alongside the Rio Grande for nearly 0.5 mile, where it crosses through a culvert under West Paisano Drive. After exiting this first culvert, the canal runs along the east side of highway for roughly 0.6 mile, where it crosses through a second culvert under West Paisano Drive and exits on the west side adjacent to the Rio Grande. The canal continues downstream for another 0.5 mile, at which point it connects to the Hart's Mill Sedimentation Basin, which is the beginning of the American Canal Extension, near the old West Yandell Drive overpass and the International Diversion Dam in the Rio Grande. The canal is accessible from various access points off West Paisano Drive. The American Canal is subdivided into three segments - upper (upstream), middle, and lower (downstream) segments. Each segment is separated by a highway culvert. Reconstruction of each segment will be performed separately. The first phase of the project has been initiated. Reconstruction of the American Canal's lower segment is currently underway and is scheduled to continue into August 2016, or later if necessary. The work under this contract is for the second phase of the project and is limited to the reconstruction of the American Canal's upper segment only. This upper canal segment extends approximately 0.5 mile from where it begins at the diversion of American Dam and enters the first highway culvert under West Paisano Drive. The existing canal has a flow capacity of 1,200 cubic feet per second (cfs). The capacity of the new canal system will be increased to 1,535 cfs. Major Construction Tasks •(1) Preparation of right of way (clearing and grubbing). •(2) Construction of ramps. •(3) Demolition and disposal of existing reinforced concrete canal. •(4) Construction of new canal lining, cast-in-place reinforced concrete transitions, and rectangular-shape culvert sections for the base of the canal. •(5) Fabrication and installation of precast reinforced concrete arched, rectangular-shape sections for the top of canal. •(6) Dewatering and possible treatment of contaminated groundwater. •(7) Removal and disposal of contaminated soils and replacement with clean (non-contaminated), suitable backfill. •(8) Cleaning and removing debris from jobsite. •(9) Reestablishment of embankments and roadways. The magnitude of this project is more than $10,000,000. Performance Period -The canal and necessary structure work for conveyance of irrigation waters shall be constructed during the non-irrigation season, which typically runs from October 15 to February 28. Only work that does not impact on the system's ability to deliver irrigation water (i.e. staging, construction/restoration of berms, fences, grounds, vegetation, etc.) may continue into the irrigation season. All work required for the conveyance of irrigation waters shall be completed during the non-irrigation season, which will be approximately one hundred thirty six (136) calendar days at a minimum. All other work shall be completed within six hundred (600) calendar days.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/IBM15------TBD/listing.html)
 
Place of Performance
Address: El Paso, Texas, United States
 
Record
SN03767661-W 20150619/150617235423-55db01921158dc0b002ed91c46ed5b84 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.