FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 21, 2015 FBO #4958
MODIFICATION

Y -- NIXA CONTROL CENTER QUESTIONS AND ANSWERS

Notice Date
6/19/2015
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
SWPA (Tulsa)U.S. DEPT OF ENERGYSOUTHWESTERN POWER ADMINISTRATIONONE WEST THIRD STREETTulsaOK74103-3502US
 
ZIP Code
00000
 
Solicitation Number
DE-SOL-0008404
 
Archive Date
7/25/2015
 
Point of Contact
Sean L. Long
 
Small Business Set-Aside
N/A
 
Description
Questions and Answers: In reviewing the finishes, the finish schedule shows the Generator, HVAC, Phone and Fire rooms just CMU and not painted CMU. I have included the gyp walls to be painted standard color. Are you sure you don?t want the CMU walls painting as well? A: Rooms 119, 120, 121, 122 and 123 are noted on the finish schedule for the masonry to be painted. Rooms 124, 125, 126 and 127 are not noted on the finish schedule to be painted. The Generator, HVAC, Phone and Fire Riser rooms are not to be painted. Is this project tax exempt? Yes. Section 09-3000 Tiling. Is tile required in the showers in Restrooms 110 and 111? If so, is it to be floors and walls? Refer to 9/A400. Floor tile is specified as 2x2 glazed ceramic mosaic tile and wall tile is 4x4 glazed wall tile. Will we be required to provide the backer board at the shower walls per this section? At the wet walls? Backer board is required at all wall tile. The specifications call for waterproofing membrane and crack isolation membrane. Is this to include waterproofing in the shower, at the floor tile and on the wet walls or just at the showers? Waterproofing membrane is required at the showers only. Will the crack isolation be required? If so, what area? No crack isolation required. 9/ A400 requires sloping the tile to the drains in the showers. ( 1/4'' per ft.) The tile listed on the finish schedule is a 12 x 24. The specification manual list a 2 x 2 mosaic and a 12 x 12. Which tile is to be used? Shower shall be 2x2 glazed ceramic mosaic tile with matte finish. Section 09-6519 and 09-6770 Resilient Flooring. Is Room 113 to receive Armstrong Standard VCT or Armstrong Static Dissipative Tile? ( A500 Finish Room Schedule Comments) Armstrong static dissipative tile. C106 detail G10 Note: ?asphalt by others? Is the asphalt not in this project? The asphalt is not to be included under this contract. There will be a communications tower construction project shortly after construction of this project which would damage the asphalt, so it will be completed by the other contractor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/DE-SOL-0008404/listing.html)
 
Record
SN03770556-W 20150621/150619235036-93e33c5c48340a5f127340bd9b3da2d8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.