AWARD
C -- Indefinite Delivery (IDC) A-E Contract for Engineering, Design and Engineering During Construction ServicesS for Military, Civil Works and Interagency and International Services (IIS) Located within the SWD Boundaries
- Notice Date
- 7/9/2015
- Notice Type
- Award Notice
- Contracting Office
- USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
- ZIP Code
- 74128-4609
- Solicitation Number
- W912BV-14-R-0055
- Response Due
- 8/29/2014
- Archive Date
- 8/8/2015
- Point of Contact
- Diane Cianci, 918-669-7458
- E-Mail Address
-
USACE District, Tulsa
(diane.cianci@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-15-D-0007
- Award Date
- 7/9/2015
- Awardee
- MASON & HANGER + MEAD & HUNT JOINT VENTURE (079484588) <br> 1616 E 15TH ST <br> TULSA, OK 74120
- Award Amount
- $6,000,000.00
- Line Number
- 0001
- Description
- 1. CONTRACT. General: A target of three (3) Indefinite Delivery Contracts (IDC) are being procured in accordance with the Brooks Act (Public Law PL 582) and implemented in the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. The IDCs will be awarded to provide engineering, design and engineering during construction services for military, civil works and interagency and international services (IIS). This procurement is unrestricted with a planned award in October 2014. Tulsa District is issuing four synopses (target to award 3 unrestricted; 2 Small Business; 1 Economically Disadvantaged Women Owned Small Business and 1 8(a)). If there are an insufficient number of highly qualified firms for the small business set aside, then the capacity will be rolled into the unrestricted synopsis. Please respond to the 8(a) (W912BV-14-R-0080), small business (W912BV-14-R-0054), and EDWOSB synopsis (W912BV-14-R-0081) as well as the unrestricted synopsis if your firm wishes to be considered for those announcements. The contract will consist of a base of three years and one two-year option, for a total of five (5) year IDC contract, if the Contracting Officer chooses to exercise the option period. The estimated value each of the contracts, inclusive of all options, is $8,000,000 each for an estimated total of $24,000,000. A Minimum Guarantee amount of $2,000 will apply to the Base Period only. If a large business is selected for this contract, compliance with FAR 52.219-9 is required for subcontracting. A Small Business Subcontracting Plan will be required with the submittal. The subcontracting goals for Tulsa District that are applicable to large businesses are 23% for small business, 5% for women-owned business, 5% for Small Disadvantages Business, 3% Hubzone, and 3% Service-Disabled Veteran-Owned Small Business. (a) Contract Award Procedure: Before a business is proposed as a potential contractor, they must be registered in the Central Contractor Registration (CCR) database. Register via the CRR internet site at http://www.ccr.gov. The Service Contract Act will apply to this acquisition. The proposed services will be obtained by a Negotiated Firm-Fixed Price Contract. (b) Nature of Work: The services necessary for each requirement will be negotiated and awarded as individual Task Orders. The A-E shall furnish all services, materials, supplies, and supervision required to fully complete each Task Order. (c) Place of Performance: Projects are anticipated to be primarily in support of the U.S. Army Corps of Engineers Southwestern Division (SWD) Boundaries. Task Orders under the resultant IDCs may be awarded for projects only in the geographic area of SWD. (d) Contractor Manpower Reporting: The contractor will be required to report all contractor labor hours (including subconsultant labor hours) required for performance of services provided under this contract via a secure data collection site with the exception of civil works funded task orders. The contractor will be required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. 2. PROJECT INFORMATION. The following work may be expected under this contract: Project programming and planning, feasibility and concept studies, space utilization, design concepts/standards, research, analysis, engineering, design, design/build request for proposal preparation, and engineering during construction for military, civil works and international and interagency services (IIS). Engineering and design within these services also include design of new construction, both vertical and horizontal, alteration of facilities, maintenance and repair of real property, pre-design site assessment, cost estimates, value engineering, design reviews, life cycle costing, computer aided drafting, geospatial information systems (GIS), and building information modeling (BIM). Activities incidental to design include topographic and boundary surveys, to include mapping, geotechnical investigation and reports, environmental investigations, studies and reports, hazardous materials testing, abatement and monitoring, historical and cultural resource investigations, and seismic studies. It is not expected that one firm performs all services. 3. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance (first by major criterion and then by each sub-criterion). Criteria (a) through (e) are primary. Criteria (f) through (h) are secondary and will be used as 'tiebreakers' among technically qualified firms. The selection criteria in descending order of importance are: (a) Specialized Experience and Technical Competence. Breadth and depth of experience of the A-E firm in engineer/design and construction management of military, civil works and IIS facilities within the past five years will be evaluated. The criteria will include a review of projects submitted to determine relevant experience as well as designing within cost limitations, and Design Quality Management, particularly with respect of coordination between engineering disciplines and subconsultants. The AE firm shall have documented experience in providing engineering during construction services on two or more construction contracts with contract values equal to or greater than $10,000,000 each. (b) Professional Qualifications. The criteria will include a review of proposed personnel in the following disciplines: Project Management, Architecture, Mechanical, Electrical, Fire Protection, Civil, Structural, Cost Estimating, Geotechnical, Surveying, Interior Design, Building Code Officials, Safety Professionals, and Security Specialists. (c) Past Performance. Includes performance on Department of Defense (DoD) and other contracts in terms of cost control, quality of work, compliance with delivery schedules, history or working relationships with consultants, timely construction and technical support, and overall cooperativeness and responsiveness. (d) Capacity. The criteria will include a review of resources to determine if there is sufficient capacity to simultaneously provide two full designs or two design-build RFP packages or a combination of the two with construction values of approximately $20,000,000 total. (e) Knowledge of the Locality, principally the area covered by the Southwestern Division (SWD). Knowledge of subsurface conditions, including expansive soil characteristics, local climatic conditions including the conditions required for the prevention of mold and local construction methods will be evaluated. The criteria will include a review of documented project experience highlighting the unique design and construction aspects encountered within the geographic boundaries of SWD. (f) Small Business and Small Disadvantaged Business Participation. The extent of participation of Small Businesses and other Socio-Economically Disadvantaged Small Businesses or Entities will be measured as a percentage of the total anticipated contract effort regardless of whether the Small Business or other Socio-Economically Disadvantaged Small Business or Entity is a prime contractor, subcontractor, or joint venture partner. Both large and small businesses will be required to submit a Small Business Participation Plan under the unrestricted solicitation, which is an evaluation factor in the Source Selection process. Market research, based on the nature and location of the work is required to determine optimal percentage of total contract dollars planned to be performed by small businesses, however, the expected minimum participation goals are listed in the evaluation criteria below. Small business participation is the collective small business participation from any type of small business or sub-category small business. Work self-performed by a small business prime offeror will be credited as Small Business Participation. The government will evaluate the proposals to determine which offeror(s) propose the best value in terms of meeting all the Small Business Participation goals using the following criteria: (a) The extent of participation of small business prime offerors and small business subcontractors in terms of the percentage of the value of the total acquisition. Expected minimum goals are: 1. Small Business 10% of total contract dollars (aggregate of all small businesses participation including the small business socioeconomic contracting programs (i.e., 8(a), HUBZone, SDVOSB, or WOSB programs). 2. Small Disadvantaged Business (SDB) 5% of total contract dollars. 3. Women-Owned Small Business (WOSB) 5% of total contract dollars. 4. Service-Disabled Veteran-Owned Small Business (SDVOSB) 3% of total contract dollars. 5. Historically Underutilized Business Zone (HUBZone) 3% of total contract dollars. (b)The extent to which such firms, as defined in FAR Part 19, are specifically identified in proposals; (c) The extent of commitment to use such firms (existing and enforceable commitments will be considered more favorably than business relationships that are simply planned or theoretical); (d) Identification of the complexity and variety of the work specific small firms are to perform; All Offerors (both large and small businesses) are required to complete the following Small Business Participation Plan Form and submit with their proposal. This form will be the primary source of data used to evaluate the Small Business Participation factor. Offeror's market research and small business participation analysis in accordance with the evaluation criteria listed in the previous paragraphs should be reflected on this form. SMALL BUSINESS PARTICIPATION PLAN FORM (a) Check the applicable size and categories for the PRIME offeror only -- Check all applicable boxes: { } Large Prime { } Historically Black Colleges or Universities and Minority Institutions (HBCU/MI) or { } Small Business Prime; also categorized as a { } Small Disadvantaged Business (SDB) { } Woman-Owned Small Business (WOSB) { } Historically Underutilized Zone (HUB Zone) Small Business { } Veteran Owned Small Business (VOSB) { } Service Disabled Veteran Owned Small Business (SDVOSB) (b) Submit the total combined percentage of work to be performed by both large and small businesses (include the percentage of work to be performed both by Prime and Subcontractors): Example: If Prime proposes a price of $1,000,000 (including all options), and small business(es) will provide $250,000 in services/supplies as a prime or subcontractor, the % planned for small businesses is 25%; and 75% for large business equaling 100%. Total Percentage planned for Large Business(es) _______% or$ _______ Total Percentage planned for Small Business(es) _______% or $ _______ _______% Total$________ Must =100%Must = Total Value of the Contract (c) Please indicate the total percentage and/or total dollars of participation to be performed by each type of subcategory small business. The percentage of work performed by Small Businesses that qualify in multiple small business categories may be counted in each category: Example: Victory Prop Mgt (WOSB and SDVOSB) performing 2%; and Williams Group (SDB, HubZone Small Business and WOSB) performing 3%. Results equate to: SDB 3%; HubZone 3%; WOSB 5%; SDVOSB 2%; VOSB 2%;). SDVOSBs are also VOSBs automatically; however VOSBs are not automatically SDVOSBs. Small Disadvantaged Business_______% or $ _______ HUB Zone Small Business_______% or $ _______ Woman Owned Small Business_______% or $ _______ Service Disabled Veteran Owned SB_______% or $ _______ Veteran Owned Small Business_______% or $ _______ HBCU /MI_______% or $ _______ (d) List principle supplies/services to be performed by Small Businesses: Example: If a Small Business qualifies also as a WOSB and a SDVOSB, and you can add them to each category below in which they qualify. Name of CompanyType of Service/Supply Small Business (SB): _______________________________________________ _______________________________________________ _______________________________________________ Small Disadvantaged Business (SDB): _______________________________________________ _______________________________________________ _______________________________________________ Women-Owned Small Business (WOSB): _______________________________________________ _______________________________________________ _______________________________________________ Historically Underutilized Business Zone (HUB Zone): _______________________________________________ _______________________________________________ _______________________________________________ Veteran Owned Small Business (VOSB): _______________________________________________ _______________________________________________ _______________________________________________ Service Disabled Veteran Owned Small Business (SDVO): _______________________________________________ _______________________________________________ _______________________________________________ Historically Black Colleges and Universities and Minority Institutions (HBCU/MI): _______________________________________________ _______________________________________________ _______________________________________________ (e) Describe the extent of commitment to use small businesses (for example, what types of commitments if any, are in place for this specific acquisition either - small business prime, written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-prot g, etc.) ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Additional Important Note for Other than U.S. Small Businesses ONLY. IAW FAR 52.219-9, if a large business is selected for a contract it must submit acceptable subcontracting plans to be eligible for award. Those firms required to submit subcontracting plans are expected to conduct market research to determine appropriate subcontracting goals. A subcontracting plan is separate from the Small Business Participation plan and must meet the requirements of FAR 52.219-9 and DFARS 252.219-7003 (or DFARS 252.219-7004 if the offeror has a comprehensive subcontracting plan). SUBCONTRACTING PLANS SHALL REFLECT AND BE CONSISTENT WITH THE TOTAL CONTRACT DOLLAR COMMITMENTS OFFERED IN THE SMALL BUSINESS PARTICIPATION PLAN Ample opportunity will exist for subcontracting with all types of small businesses including SDB, WOSB, HZ, and SDVOSB firms. By providing subcontracting opportunities to small business, the large businesses both formally and informally mentor these businesses by helping them gain experience and increase their ability to perform at a higher level. This in turn helps the small business grow as a company and independently compete for larger projects as prime contractors or upper tier subcontractors. (g) Geographic Proximity to SWD. Location of the firm and subconsultants in the general geographic area of the Southwestern Division will be a consideration. (h) Volume of DoD Contract Awards During Previous Three (3) Years. Firm must demonstrate past performance in the accomplishment of DoD work. Additional items to be addressed are cost control, quality of work, and compliance with performance schedules. 4. SUBMITTAL REQUIREMENTS: Submittals should be sent to the U.S. Army Corps of Engineers, Attn: Ms. Diane Cianci, 1645 S. 101st East Avenue, CECT-SWT-E, Tulsa, OK 74128-4609, no later than 2:00 pm CST on 29 August, 2014. Regulations require that the selection board not consider any submittals received after this time and date. Solicitation packages are not provided. All questions must be submitted through the Bidders Inquiry System. Instructions for the Bidders Inquiry System and the deadline for submission of any inquiries will be provided via separate document entitled: Inquiries-Offerors Questions and Comments use of Bidders Inquiry. (a) Interested firms having the capabilities and qualifications to perform this work must submit one copy of SF 330 (6/2004 Edition), including Parts I and II as described herein, and one CD-ROM of the SF 330 submittal to the above address not later than 2:00 p.m. Central Standard Time on the response date listed above. The date and time are strictly enforced, and late packages will not be considered. Late proposal rules found in FAR 15.208 will be followed. Solicitation packages are not provided. The SF 330 should be complete and specifically address the requirements of this announcement. Firms shall present an organization chart and a narrative describing how the organization will function. Functions to be subcontracted shall be clearly identified by subconsultant or entity and their office location (specify the address of the office and key personnel that are assigned there). (b) Responding firms must submit a copy of the originally signed, or current (signed within the past 12 months), and accurate SF 330, Part II for the specific prime, other offices of the prime, and subconsultant offices proposed to perform the work even if an SF 330, Part II is already on file. SF 330, Part II shall be provided for the specific prime, other offices of the prime, and subconsultant offices proposed to perform the work. All Part IIs MUST be signed with original signature or facsimile of the original signature (signed within the past 3 years is required) and dated. A copy of a signed/dated Part II is acceptable. Although firms are encouraged to update their SF 330 Part II at least annually, older ones (up to 3 years old in accordance with FAR 36.603(d)(5)) will still be considered by the board. However, a firm may be recommended as not qualified or ranked low if missing, confusing, conflicting, obsolete or obscure information prevents a board from reasonably determining that a firm demonstrates certain required qualifications. Indicate in Block 5b of each Part II if the firm is a Large Business, Small Business, HubZone, Service Disabled Veteran-Owned Small Business, or Economically Disadvantaged Woman-Owned Small Business. To be classified as a small business, a firm's average annual receipts or sales for the preceding three fiscal years must not exceed $15 million. (c) Submit only one SF 330, Part I from the prime for the design team, completed in accordance with the SF 330 instructions and additional instructions herein. It must contain information in sufficient detail to identify the team (prime, other offices of the prime, and consultants) proposed for the contract. The A-E shall not include company literature with the SF 330. (d) In block No. 4 Part II provide the Data Universal Numbering System (DUNS) number issued by Dun and Bradstreet Information System (1/866-705-5711) for the prime A-E or Joint Venture. The DUNS number must be for the firm or joint venture performing the work (i.e. not the parent DUNS number, but a DUNS number specifically for the office performing the work. (e) In Section C of the SF 330, Part I, identify the discipline/service to be supplied by the prime, other offices of the prime, as applicable, and each subconsultant. Provide brief resumes in Section E of the on-staff or consultant employees you intend to use to perform the work. Resumes must be submitted for each employee required to meet the minimums stated above in paragraph 3b. Resumes shall not exceed one page. (f) In Section F, a maximum of ten (10) projects for the total proposed team (including the prime and subconsultants) shall be provided. Use no more than one page per project. (g) In Section G, block 26, along with the name, include the firm and office location the personnel are associated with. The names of all individuals included in the resumes in Section E shall be listed in Block G-26 along with their firm location and their roles even if example project experience in Block G-28 is not applicable. Also include Team Project Organization Chart in Part I, Section D indicating how each firm on the proposed team (prime, other offices of the prime, and each subconsultant as identified in Part I, Section C) integrates into the composite team. (h) In Section H, of the SF 330, Part I, provide a narrative to address each of the requirements, including subparagraphs, of items listed in Section 3, Selection Criteria, of this announcement. (i) In Section H, Part I, SF 330, firms must show their last 12 months DoD contract awards stated in dollars (see 3(e) above), provide an itemized summary of DoD awards to include Agency Contract Number/Task Order No. DoD awards shall be shown in an itemized summary including Agency, Contract Number/Task Order No., Project Title, and Award Amount dollars. Include a total of all listed awards. Note that award of Indefinite Delivery Contracts should not be counted as award amounts, and only actual Task Orders and any modifications thereto should be included in the amounts. When addressing team capabilities, clarify planned capability, existing capability, and prior experiences, if applicable. Include any other relevant information including a short discussion of why the firm is especially qualified based upon the specific selection criteria listed in Section 3. (i) In Section H, Part I, SF 330 Generally, describe the firm's Quality Management Plan (QMP). A project-specific detailed QMP must be prepared and approved by the Government as a condition of contract award but is not required with this submission. Indicate the estimated percentage involvement of each firm on the proposed team. Do not exceed twenty pages for Section H. Front and back side use of a single page will count as two (2) pages, and print type used in charts, graphics, figures and tables may be smaller than 11 font but must be clearly legible. Foldouts are not allowed and shall not be considered. (j) Personal visits or telephone calls to discuss this announcement will NOT be entertained. (k) Solicitation packages are not provided for A-E contracts, and no additional project information will be given to firms during the announcement period. Facsimile transmissions will not be accepted. Point of Contact: Diane Cianci (918) 669-7458, Contract Specialist, Contracting Division. This is not a request for proposal. In accordance with FAR clause 52.219-14 Limitations on Subcontracting for services, quote mark At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. quote mark
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-14-R-0055/listing.html)
- Record
- SN03790842-W 20150711/150709235224-7bfd31ce763d6c04a6ea0f9fdf14e21c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |