Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 15, 2015 FBO #4982
MODIFICATION

Y -- OZAR Accessible Walkway

Notice Date
7/13/2015
 
Notice Type
Modification/Amendment
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
NPS, MWR - Missouri MABO 11 North 4th Street St Louis MO 63102 US
 
ZIP Code
00000
 
Solicitation Number
P15PS00891
 
Response Due
7/31/2015
 
Archive Date
12/1/2015
 
Point of Contact
Dyke, Terri
 
Small Business Set-Aside
HUBZone
 
Description
a. This requirement is being set aside as a HUBZone business set-aside in accordance with FAR 19.1305. In addition to being a HUBZone concerns, offerors shall be small businesses under the acquisition NAICS in order to be considered for award. b. Award of this solicitation will result in a Firm Fixed Price contract. c. The desired completion date for this contract is 2 October 2015. d. Specifications: See Attachment 1 - Specifications, Attachment 2 - Drawings, and Contract Sections C-J. e. The magnitude of construction is between $100,000 and $250,000. f. NAICS: 238990, Size Standard: $15.0M g. See FAR Clause 52.236-27 concerning an organized site visit. RSVP to terri_dyke@nps.gov. h. The Government will provide tax exempt information for the purchase of construction materials associated with the execution of this contract. i. This project is intended to provide a new accessible walkway to the front entrance of the historic Alley Roller Mill building. The work includes: 1. Demolition and salvage of an existing stone walkway; 2. Construction of a new reinforced concrete walkway, together with a bridge to walkway transition pad, and a bench and wheelchair rest area, all surfaced with exposed aggregate concrete and totaling approximately 155 square yards; 3. Replacement of an existing bridge timber at the connection to the new transition pad; 4. Construction of a new 8-foot by 8-foot landing with handrails, and surfaced with flagstones; 5. Modifications to the building at the connection to the new landing; 6. Construction of transitions to existing aggregate surfaced trails totaling approximately 85 square yards; 7. Construction of storm water collection structures and piping; 8. Turf restoration, and other related work.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P15PS00891/listing.html)
 
Record
SN03794469-W 20150715/150713234749-e652d3026ae372cfb559e107459b0fc1 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.