MODIFICATION
F -- Shake Creek Road Decommissioning
- Notice Date
- 7/17/2015
- Notice Type
- Modification/Amendment
- NAICS
- 115310
— Support Activities for Forestry
- Contracting Office
- Department of Agriculture, Forest Service, R-1 IMAT: Clearwater; Idaho Panhandle; Kootenai; and Nez Perce NF's, 3815 Schreiber Way, Coeur d'Alene, Idaho, 83815-8363, United States
- ZIP Code
- 83815-8363
- Solicitation Number
- AG-02RC-S-15-0110
- Response Due
- 8/3/2015 2:30:00 PM
- Point of Contact
- Darren M. Zychek, Phone: 2084768224
- E-Mail Address
-
dzychek@fs.fed.us
(dzychek@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- a. Scope of Contract. The Nez Perce-Clearwater National Forests decommissions roads to reduce erosion and landslide risks; protect and restore water quality, watershed function and condition; and improve soil productivity. This contract includes road decommissioning and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. b. Description of Work. The Shake Creek Road Decommissioning project consists of decommissioning approximately 15.2 miles of road using Roadway Obliteration Method I and placing approximately 1.8 miles of road into long-term storage using Roadway Obliteration Method II. Additional decommissioning and road maintenance may be determined and would be directed by the C.O. Road decommissioning treatments include drainage structure removal, decompaction, recontouring, strong outsloping and seeding of disturbed areas. All fill material and culverts in stream channel crossings and dry swales will be removed. Stream channels will be restored to natural grade and dimensions and grade control structures installed. Native vegetation, slash and duff material available on site will be transplanted to the decompacted and recontoured or outsloped roadway. Total Small Business Set Aside. An error occurred at posting, the Base Solicitation states, "100% HubZone Set Aside." Correct set aside for AG-02RC-S-15-0110 is "100% Total Small Business."
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/281/AG-02RC-S-15-0110/listing.html)
- Place of Performance
- Address: c.Project Location. The project area is located east of Pierce, Idaho in the Orogrande Creek watershed in Clearwater County. Access to project roads is by USFS Road 250. From U.S. Highway 12, head north on State Highway 11, at Greer Junction. Travel north on State Highway 11 to Pierce, ID. Just as you are entering Pierce, turn right onto USFS Road 250 the Pierce-Superior road. Travel on USFS Road 250 for approximately 20 miles to the project location. Access to individual project roads is described on worklists and maps., Pierce, Idaho, United States
- Record
- SN03801606-W 20150719/150717235341-d3891a3a9119919966ec1137c6eef9df (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |