Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 31, 2015 FBO #4998
SOURCES SOUGHT

B -- Rapidly Deployable Biomimetic Shelter for Expedition Base Camps

Notice Date
7/29/2015
 
Notice Type
Sources Sought
 
NAICS
541712 — Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
 
Contracting Office
Department of the Army, Army Contracting Command, ACC-APG - Natick (SPS), BLDG 1 KANSAS ST, Natick, Massachusetts, 01760-5011, United States
 
ZIP Code
01760-5011
 
Solicitation Number
0010678054
 
Archive Date
8/22/2015
 
Point of Contact
Steven E. Streeter, Phone: 5082336180
 
E-Mail Address
steven.e.streeter4.civ@mail.mil
(steven.e.streeter4.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
1. Background: In remote areas and in expeditionary camps, where US Army soldiers need to settle for one or two weeks at a time, there exists a need for a rapidly deployable shelter. To meet this unique requirement, this project will explore designs that mimic the agility and swiftness exited in nature. In compliance with the Army's contingency basing focus, this project will aim to make the mission of expedition camps or tactical small unit bases more effective. 2. Requirements: The Contractor shall design and manufacture a prototype of a biomimetic/inflatable shelter that is rapidly deployable in any environment. The requirements of the project are: the shelter must be a free standing structure; air inflatable beams for rapid deployment are to be used; having usable floor space for six soldiers; the interior height of at least 74" and no more than 80" at the apex; the shelter weight is less than 150 pounds; the erect and strike time should be less than 30 minutes; the shelter is capable of withstanding the wind and snow loads. a. General Requirements. The contractor's primary focus shall be: i. Design, construction, and analysis of a prototype biomimetic/inflatable shelter that is rapidly deployable. b. Specific Requirements: The contractor shall: i. Conceptually develop several novel collapsible and rapidly deployable shelters using inflatable beams. ii. Conduct designs and analyses of structures of at least two concepts of the shelter for wind and snow loads. iii. Manufacture a prototype of the inflatable shelter. iv. Test the prototype of the shelter for deployment time and the wind and snow loads.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/c6bb9eb468d68d8de00d484776a18ce9)
 
Place of Performance
Address: The primary place of performance for this work will be at the Contractor’s Location with one anticipated day trip to Natick, MA., United States
 
Record
SN03816273-W 20150731/150730000818-c6bb9eb468d68d8de00d484776a18ce9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.