FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 01, 2015 FBO #4999
AWARD

56 -- Building 20676 Repair HVAC in Film Library at Kirtland AFB, NM

Notice Date
7/30/2015
 
Notice Type
Award Notice
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-15-P-0048
 
Archive Date
8/29/2015
 
Point of Contact
Glenda Kohlieber, 575-652-4135
 
E-Mail Address
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-15-P-0048
 
Award Date
7/13/2015
 
Awardee
WEIL CONSTRUCTION, INC. (363752135) <br> 3344 PRINCETON DR NE <br> ALBUQUERQUE, NM 87107
 
Award Amount
$149,861.16
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. a.The contractor shall leave the existing 4 wall mounted cooling units in place and install 4 new cooling units that will meet the humidity and temperature requirements of the Library. Temperature requirements range from 55 to 57 degrees Fahrenheit. b.Contractor shall install a de-humidification system to maintain a humidity level of not greater than 30%. c.Contractor shall leave the existing condensers located outside of the facility in place and shall install new condensers to serve the 4 new cooling units. d.New Cooling units need to be tied into the existing Honeywell DDC controls. e.Contractor shall install new copper piping running from the new cooling units to the new condensers. f.Insulation shall be installed on all ductwork and piping where it is found to be damaged or lacking. g.Contractor shall install ducting where it is required to provide cooling/heating to the office areas. h.Contractor shall verify adequate power is available for the installation of the upgraded Cooling units. i.Contractor shall re-label the electrical panel to accurately identify the new cooling units. j.All disconnect switches shall be labeled to match the correct electrical panel. k.Contractor shall rebalance the system and provide the reports to USACE and DTRA. l.Operation and Maintenance manuals shall be submitted to USACE and DTRA and training completed before the project is closed out.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0048.html)
 
Record
SN03816737-W 20150801/150730235524-9307cbd09d6536f258c17f60d9b8a5cb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.