Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 09, 2015 FBO #5007
SOURCES SOUGHT

47 -- Request For Information on ETAM - FA8538-16-R-XXXX - CONTRACTOR CAPABILITY SURVEY - Request For Information

Notice Date
8/7/2015
 
Notice Type
Sources Sought
 
NAICS
332919 — Other Metal Valve and Pipe Fitting Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Material Command, PK/PZ - Robins AFB, 215 Page Rd, Robins AFB, Georgia, 31098-1611, United States
 
ZIP Code
31098-1611
 
Solicitation Number
FA8538-16-R-ETAM
 
Archive Date
9/5/2015
 
Point of Contact
Daniel E Childs, Phone: (478) 926-2764, Michael L Shelley, Phone: (478) 926-2231
 
E-Mail Address
Daniel.Childs.1@us.af.mil, michael.shelley.1@us.af.mil
(Daniel.Childs.1@us.af.mil, michael.shelley.1@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Request for Information (RFI) for the Manufacture of F-15 Engine-to-Airframe Manifold Center Section Assembly NSN 4730-01-493-8729FX CONTRACTOR��CAPABILITY��SURVEY�� REQUIREMENTS DESCRIPTION F-15 Engine-to-Airframe Manifold Center Section Assembly NSN 4730-01-493-8729FX PURPOSE/DESCRIPTION We are conducting market research to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for qualification and production of the F-15 Engine-to-Airframe Manifold Center Section Assembly, NSN 4730-01-493-8729FX. Our acquisition strategy is a three-year contract (basic plus two option years) and will continue through FY18. The projected quantities will be a maximum quantity of 126ea in the basic year, a maximum quantity of 44ea the first option year, and a maximum quantity of 45ea the second option year. The ETAM is part of the main fuel lines that delivers fuel directly to each of the engines on the F-15. The ETAM consists of the center sections assembly mating to a 36° elbow housing at one end and a straight housing at the other end. The ETAM is assembled using a seal kit to seal all unions. The Center Section Assembly will be considered the assembly up to, but not including, each ends housing (AE96675U/180001-4 and AE80312U/180001-06). It must conform to the OEM engineering requirements outlined in 68B588000, TO 6J12-19-3. Our acquisition strategy is a three-year contract (basic plus two option years) and will continue through FY18. The projected quantities will be a maximum quantity of 126ea in the basic year, a maximum quantity of 44ea the first option year, and a maximum quantity of 45ea the second option year.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/WRALC/FA8538-16-R-ETAM/listing.html)
 
Record
SN03829072-W 20150809/150807235106-fb98afd63b15dce57262e0f081ed98aa (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.