MODIFICATION
Y -- OZAR Accessible Walkway
- Notice Date
- 8/19/2015
- Notice Type
- Modification/Amendment
- NAICS
- 238990
— All Other Specialty Trade Contractors
- Contracting Office
- NPS, MWR - Missouri MABO 11 North 4th Street St Louis MO 63102 US
- ZIP Code
- 00000
- Solicitation Number
- P15PS00891
- Response Due
- 8/19/2015
- Archive Date
- 12/1/2015
- Point of Contact
- Dyke, Terri
- Small Business Set-Aside
- HUBZone
- Description
- As of 19 August 2015, this solicitation has been canceled due to lack of funding. The complete solicitation package, including all amendments, can only be found on fedconnect.net. Go to fedconnect.net and search public opportunities using reference number P15PS00891. FBO.GOV does not house the entire solicitation package. P15PS00891 - OZAR Acccessible Walkway Base Solicitation Issued: 25 June 2015 Amendment 1: Issued 13 July 2015 Amendment 2: Issued 16 July 2015 Amendment 3: Issued 19 August 2015 The National Park Service (NPS), Department of Interior, is soliciting proposals from construction firms having the capability to perform the work as described below: a. This requirement is being set aside as a HUBZone business set-aside in accordance with FAR 19.1305. In addition to being a HUBZone concerns, offerors shall be small businesses under the acquisition NAICS in order to be considered for award. b. Award of this solicitation will result in a Firm Fixed Price contract. c. The desired completion date for this contract is 2 October 2015. d. Specifications: See Attachment 1 - Specifications, Attachment 2 - Drawings, and Contract Sections C- e. The magnitude of construction is between $100,000 and $250,000. f. NAICS: 238990, Size Standard: $15.0M g. See FAR Clause 52.236-27 concerning an organized site visit. RSVP to terri_dyke@nps.gov. h. The Government will provide tax exempt information for the purchase of construction materials associated with the execution of this contract. i. This project is intended to provide a new accessible walkway to the front entrance of the historic Alley Roller Mill building. The work includes: 1. Demolition and salvage of an existing stone walkway; 2. Construction of a new reinforced concrete walkway, together with a bridge to walkway transition pad, and a bench and wheelchair rest area, all surfaced with exposed aggregate concrete and totaling approximately 155 square yards; 3. Replacement of an existing bridge timber at the connection to the new transition pad; 4. Construction of a new 8-foot by 8-foot landing with handrails, and surfaced with flagstones; 5. Modifications to the building at the connection to the new landing; 6. Construction of transitions to existing aggregate surfaced trails totaling approximately 85 square yards; 7. Construction of storm water collection structures and piping; 8. Turf restoration, and other related work.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P15PS00891/listing.html)
- Record
- SN03846631-W 20150821/150820000429-d6b0e92074fdd17db211c0811d184783 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)