Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 21, 2015 FBO #5019
DOCUMENT

Y -- Vicenza Unaccompanied Enlisted Personnel Housing (UEPH) Construction Project - Attachment

Notice Date
8/19/2015
 
Notice Type
Attachment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N33191 NAVFAC EURAFSWA PSC 817 Box 51 FPO AE Naples,
 
Solicitation Number
N3319115R0843
 
Point of Contact
Stephen Astwood 39-081-568-4104
 
E-Mail Address
stephen.astwood@eu.navy.mil
(stephen.astwood@eu.navy.mil)
 
Small Business Set-Aside
N/A
 
Description
Vicenza Unaccompanied Enlisted Personnel Housing (UEPH) Construction Project. Construct a standard design Barracks as part of the Vicenza Area Installation, Camp Ederle, Vicenza. Primary facility includes barracks. Additional work includes special foundations and special construction (radon mitigation, lightning protection and acoustical sound attenuation). Install Intrusion Detection System (IDS) and connections for Energy Monitoring and Control System (EMCS) and Building Information System. Support facilities include site improvements, landscaping, perimeter access road, storm drainage, connection to necessary utility services (electrical, water, sewer, gas, heat and cooling), paving, walks, curbs and gutters and information systems. Supporting elements within the facility include fire alarm system, automatic fire sprinkler system, video surveillance system and telephone/cable TV/high speed Internet, and centralized communication network, data ports in all administrative and support offices, and general purpose room. Heating, ventilation, and air conditioning (HVAC) will be provided by a central system. Anti-terrorism (AT) measures include resistance to progressive collapse, blast resistant exterior doors and windows, security lighting systems, protective landscaping and barrier protection, and fencing. Access for individuals with disabilities will be provided in public areas. Comprehensive interior design services are required. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) will be provided. LEED Silver is required. Demolish 4 buildings at Vicenza Installations, IT (66,032 Total SF). Air Conditioning (Estimated 200 Tons). One year of warranty must be provided. Project completion date is anticipated to be 720 calendar days from date of contract award.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/EFAMED/N3319115R0843/listing.html)
 
Document(s)
Attachment
 
File Name: N3319115R0843_Vicenza_UEPH_Synopsis.pdf (https://www.neco.navy.mil/synopsis_file/N3319115R0843_Vicenza_UEPH_Synopsis.pdf)
Link: https://www.neco.navy.mil/synopsis_file/N3319115R0843_Vicenza_UEPH_Synopsis.pdf

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Record
SN03846985-W 20150821/150820000718-ee7bf77484869d695dd1047e245cfefc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.