Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 02, 2015 FBO #5031
MODIFICATION

Y -- CONTRACTOR SHALL INSTALL NEW CAT 6A IT CABLE FOR WOODS HOLE LABORATORY LOCATED IN WOODS HOLE, MA - Amendment 2

Notice Date
8/31/2015
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Eastern Region Acquisition Division-KC, 601 East 12th Street, Room 1756, Kansas City, Missouri, 64106, United States
 
ZIP Code
64106
 
Solicitation Number
wWC-133F-15-RQ-0961CMM
 
Archive Date
9/18/2015
 
Point of Contact
Carey M. Marlow, Phone: (816)426-7460, NICHOLAS J. DEGUIRE, Phone: 816-426-2367
 
E-Mail Address
carey.m.marlow@noaa.gov, NICHOLAS.J.DEGUIRE@NOAA.GOV
(carey.m.marlow@noaa.gov, NICHOLAS.J.DEGUIRE@NOAA.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
AMENDMENT A0003 - CAT 6A INSTALLATION AT WOODS HOLE LABORATORY AMENDMENT A0003 THIS AMENDMENT IS HEREBY ISSUED TO POST QUESTIONS AND THE ANSWERS THAT HAVE BEEN ASKED OF THE GOVERNMENT. 1. "THE AMEDED SOW STATES CORE/DRILL THROUGH BRICK FIRE WALLS ON BOTH SIDES OF THE HALLWAY FOR EACH FLOOR TO ACCES INDIVIDUAL ROOMS." DOES THIS MEAN A SINGLE PENETRATION PER SIDE, PER FLOOR (APPROX 6 TOTAL) OR IS A PENETRATION REQUIRED FOR EACH INDIVIDUAL ROOM (FIRST FLOOR WORULD HAVE APPROX 2 DOZEN ASSUMING THE BRICK RUNS THE ENTIRE LENGHT OF THE HALLWAY ON BOTH SIDES)? ANSWER: THE CONTRACTOR CAN RUN CABLING EITHER DOWN THE HALLWAY FOR BOTH NORTH AND SOUTH OFFICES, PENETRATING THE FIRE WALL AT EACH OFFICE OR THE CONTRACTOR CAN RUN CABLING ON THE NORTH OR SOUGH SIDE OF THE FIRE WALLS, THIS WOURLD BE ACCOMPLISHED BY RUNNING CABLES INSIDE THE NORTH AND SOUTH SIDES OF THE OFFICES NEXT TO THE FIRE WALLS, CORING STILL IS REQUIRED TO ACCOMPLISH THIS. 2 Can the wire be run down the hall the drill smaller holes to branch into each office? ANSWER: YES____________________ 3. There are 2 fiber optic cables that run to the third floor. Is it your intent to move both to the new server room or just the 12 strand that is mentioned in the scope? ANSWER: 12 STRAND ONLY _____________ 4. What type of wire mold is required plastic or metal? ANSWER: PER CONTRACT DOCUMENTS. THE METAL WILL RUST OVER TIME TO THE SALT AIR CONTENT IN THE AREA, WE SUGGEST PLASTIC, BUT ITS YOUR CALL 5. For the main lines traveling from floor to floor how do you want these concealed or supported? Pipe? _____ Wire mold (5000 series)? ______ or just bundled? ______________ANSWER:IN CONDUIT MEETING REQUIRD CODES PER CONTRACT DOCUMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOC/NOAA/CASC/wWC-133F-15-RQ-0961CMM/listing.html)
 
Place of Performance
Address: WOODS HOLE LABORATORY, 166 WATER STREET, WOODS HOLE, MA 02543, WOODS HOLE, Massachusetts, 02543, United States
Zip Code: 02543
 
Record
SN03863478-W 20150902/150831235257-2b1d1fe42159d2f190609bb40ff364e5 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.