Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 04, 2015 FBO #5033
MODIFICATION

Y -- NV FTNP LAKE 114(1), Katherine Lake

Notice Date
9/2/2015
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6815B00021
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633500, Joe Wilson, Phone: 7209633500
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This will be advertised using full and open competition. PROJECT DESCRIPTION: Schedule A includes a full depth, full width 4R improvement of Katherine Access Road as the main roadway into the Katherine Access Marina. The 4R work includes widening the roadway template; new drainage structures; improved pullouts adjacent to the roadway; paved entrance parking area; resurfacing existing Marina area parking lots and boat launch areas as well as the entrance station. The project also includes new signage and safety improvements along the route. Option X, Davis Dam Road, work is included as an Option to the original plans. This work consists of 4R improvements on the Davis Dam Road approach with an improved roadway template, side drainage and surfacing. This section also includes some drainage improvements, signing and guardrail. SIGNIFICANT QUANTITIES: •§ •§ Schedule A - •§ Katherine Access Road Improvements •§ Total of 36,000 CY of Embankment, 2,000 CY of Slope Scaling, 7,000 Sq. Ft. of Controlled Blasting, 5,800 CY of Riprap Class 3, 200 CY of Riprap Class 4, 550 CY of Riprap Class 6, 4,700 Sq. Ft. of Mechanically Stabilized Earth Wall, 71,000 SY of Pulverizing 3 In Depth, 84,000 SY of Pulverizing 6 In Depth, 27,000 Tons of HACP Class B Grading C, 7,800 Tons of Open Graded Asphalt Friction Course, 4,700 SY of Reinforced Rigid Pavement, 124 LF of Precast Reinforced Concrete Box Culvert, 8,000 LF of Curb and Gutter, 3,100 LF of Guardrail Type 4. •§ •§ Option X - Davis Dam Road Improvements Total of 220 CY of Riprap Class 3, 2,700 Tons of HACP Class B, 490 Tons of Open Graded Friction Course. It is anticipated this project will be advertised on September 11, 2015 with construction beginning in October 2015 and extending through May 2016.. The contracting range for this project is between $15 million and $20 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6815B00021/listing.html)
 
Place of Performance
Address: Lake Mead National Recreation Area, Bullhead City, Nevada, 86429, United States
Zip Code: 86429
 
Record
SN03868218-W 20150904/150902235957-42b3519890eb340c6d539b92e441ea36 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.