Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 06, 2015 FBO #5035
MODIFICATION

Z -- Prepare and Paint Exterior of Bear Valley Visitor Center

Notice Date
9/4/2015
 
Notice Type
Modification/Amendment
 
NAICS
238320 — Painting and Wall Covering Contractors
 
Contracting Office
NPS, PWR - PORE MABO Point Reyes National Seashore 1 Bear Valley Road Point Reyes Station CA 94956-9703 US
 
ZIP Code
00000
 
Solicitation Number
P15PS02426
 
Response Due
9/9/2015
 
Archive Date
9/24/2015
 
Point of Contact
Gomez, Liset
 
Small Business Set-Aside
Total Small Business
 
Description
This is an amendment to a previously issued Request for Quotation for removal and replacement of siding elements, preparation and cleaning of exterior building, staining of siding and painting of hardware, exterior doors, and windows at the Bear Valley Visitor Center located at Point Reyes National Seashore. The amendment is issued for the purpose of providing interested parties additional information via a Question and Answer, as follows: Q1: When are quotes due? A1: Quotes are due Wednesday, September 9, 2015 at 4:30pm (Pacific Standard Time). As stated in amendment#0003. Q2: Is the visitor center opened every day? A2: Yes, the visitor center is opened every day and work will need to be coordinated with NPS. Q3: Are there any septic tanks near the building? A3: Yes, there are some septic tanks. Q4: Do you have a list of measurements? A4: Attached you will find a document that lists building area quantities (Attachment No. 08). Q5: Do you want the caulk to match the stain? A5: Yes, as stated in the Revised Painting Section 09900 (Attachment No. 02), ¿Contractor will be required to match the color of paint/stain chips; the colors selected will match as closely as possible to the building color scheme. Caulking shall be colored to match newly-stained siding." Q6: Does utility box, vents, and fire sprinkler need to be painted? A6: Yes utility box, vents, and fire sprinkler are to be painted. Q7: Is the bird screening under overhangs expected to be removed by contractor? A7: As stated in the Revised Painting Section 09900 (Attachment No. 02). Removal of the bird screening under overhangs is not expected of the contractor. Q8: Are the bathroom doors part of this requirement? A8: Restroom doors need to be prep and painted interior and exterior. Q9: Do you require prime stain to go on the building? A9: No, we are not going to prime stain for this job. Attached please find the following: Building Area Quantities (Attachment No. 08), Revised Definition of Contract Line Items (Attachment No. 04), and Questions & Answers. The Government intends to award a single, fixed price service contract. The Request for Quotation (RFQ) will include three (3) base line items. The period of performance for base and option item work is estimated to be September 14, 2015 through October 30, 2015. Award selection will be based on the responsible firm whose offer conforming to this RFQ will be most advantageous to the Government, on the basis of the lowest evaluated price meeting or exceeding the acceptability standards for non-cost factors (technical capability and past performance). The North American Standard Industrial Classifications System (NAICS) code for this requirement is 238320, with a corresponding size standard of $15.0 million. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business shall be considered nonresponsive and will be rejected. In order to be eligible for award contractor must have an active Sam.gov registration at the time of award. The Request for Quotation (RFQ) will be available on/about August 13, 2015 by electronic means only and attachments can be downloaded only from FedConnect website at http://www.fedconnect.net. Attachments are not posted to FedBizOpps but you can find a link on http://www.fbo.gov, with the message "Click here to see more information about this opportunity on Fed Connect." Interested parties are responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFQ. If you would like to schedule a site visit please contact the Contracting Officer, Liset Gomez at (415) 464-5228 or Liset_Gomez@nps.gov. The Request for Quote due date is Wednesday, September 9, 2015 at 4:30pm (Pacific Time).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/P15PS02426/listing.html)
 
Record
SN03873569-W 20150906/150904235903-e74c79b77ca3ec3eaf82a268fd383662 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.