FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 14, 2015 FBO #5043
AWARD

Y -- Herbert Hoover Dike Rehabilitation Structure Replacements, S-271 (C10-A) Reconstruction, Palm Beach County, Florida

Notice Date
9/12/2015
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Jacksonville, P.O. Box 4970, Jacksonville, FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP-15-R-0013
 
Response Due
7/17/2015
 
Archive Date
10/12/2015
 
Point of Contact
Claurice Dingle, (904) 232-1387
 
E-Mail Address
USACE District, Jacksonville
(claurice.m.dingle@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912EP-15-C-0023
 
Award Date
9/11/2015
 
Awardee
HARRY PEPPER & ASSOCIATES, INC. (009821422) <br> 9000 REGENCY SQUARE BLVD FL 1 <br> JACKSONVILLE, FL 32211
 
Award Amount
$49,924,479.10
 
Line Number
0001-0035
 
Description
The work includes demolition and removal of the existing Herbert Hoover Dike Culvert 10A and the construction of a new outlet works S-271 at the same location of the existing Culvert 10A. The demolition and reconstruction efforts will be performed in the dry requiring the installation of an earthen cofferdam within Lake Okeechobee and a steel sheet pile (SSP) cofferdam on the landside at the L-8 canal in order to dewater the construction site. To maintain flows between Lake Okeechobee and the L-8 canal, a steel sheet pile canal will be constructed to divert flow from the L-8 canal to a three barrel bypass culvert. The bypass culvert will be constructed with 10-foot diameter HDPE pipe and will be operated during the construction of the new outlet works. The bypass culvert with have a sheet pile headwall on the landside and steel pile supported gates on the lakeside. The new outlet works structure will include cast-in-place reinforced concrete headwalls (lakeside and landside), conduit and endwalls. Combination flap/slide gates will be installed in each bay of the lakeside headwall. The outlet works will consist of four (4) barrels that vary in geometry from 10-foot square at the headwalls to 7-foot high by 13.5-foot wide rectangles through the embankment. The reconstructed embankment will feature a cutoff wall, an impervious core, a vertical chimney drain, and a horizontal drain and filter. The reconstructed embankment will match the existing crest elevation of the dike at the site. Riprap will be installed along the lakeside embankment face for erosion protection. A steel sheet pile groin structure will be installed on the lakeside to reduce sedimentation in the entrance canal. A control building will be installed on the landside work platform. Work also includes the demolition and removal of two existing residential structures at the project site and clearing an electrical corridor.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP-15-R-0013/listing.html)
 
Record
SN03883567-W 20150914/150912233544-bd944e716e557a2511048b3cd552cd09 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.