61 -- NEC - UPS Battery 2 String - Solicitation - SOW

Notice Date
9/17/2015
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
335912 — Primary Battery Manufacturing
 
Contracting Office
Department of the Army, Army Contracting Command, MICC, MICC - Fort Leavenworth, 600 Thomas Avenue, Unit 3, Fort Leavenworth, Kansas, 66027-1417, United States
 
ZIP Code
66027-1417
 
Solicitation Number
W91QF4-15-R-0057
 
Point of Contact
Bryan P. Stewart, Phone: 9136841618
 
E-Mail Address
bryan.p.stewart3.mil@mail.mil
(bryan.p.stewart3.mil@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
Requirement Statement of Work Requirement Solicitation Specifications/Statement of Work for UPS Battery Replacement CHESS Reference Number: 138317 WKHR12-100C/FR Battery Specifications: • Sealed Lead Acid Battery • 3 Year Free Replacement Warranty • 10 year design life @ 77ºF/25ºC (Float) • 100% maintenance-free and non-spillable • Epoxy-sealed posts eliminate leaks • Advanced AGM technology for superior high-rate, short-term power • Flame retardant cases (rated UL94, VO 28% LOI) • All batteries meet or exceed IEEE-485 capacity requirements at shipment • Made in the U.S.A. • Voltage: 12 volts nominal • Plate Alloy: Pure lead, low calcium, high tin positive grids • Container/Cover: Flame retardant polypropylene • Float Voltage @ 77ºF (25ºC): 2.25 volts per cell (+/-.01vpc) • Vent: Self-sealing (minimizes gassing) • Tank Formed Plates: Optimize cell voltage, balance and performance • Weight: 66Lbs • Length: 12 inches • Width: 6 7/8 inches • Height: 8 ¼ inches Statement of Work - UPS Battery Replacement 1.1Scope of Work: The Fort Leavenworth NEC Data Center "Building 136" utilizes two (2) Powerware/Eaton 9315 160 kVA Uninterruptible Power Systems providing uninterrupted power to the server floor cabinets. Each of the UPS's have two (2) strings of backup batteries containing forty (40) batteries per string, totaling eighty (80) batteries per UPS. Between the two UPS's there is a total of 160 batteries. The scope of work for this project is to replace the second string on each UPS "80 Batteries". 1.1.0 All measurements made shall use test equipment in current calibration with traceability to NIST standards. 1.1.1 The battery enclosure must be cleaned after the old batteries are removed and then before the new batteries are installed. If battery acid has leaked into the cabinet, the acid will be removed, neutralized and the enclosure metal finish will be treated. 1.1.2 The existing cable jumpers are to be resistance tested, using a micro-ohm meter prior to installation. The measurements will be taken from each terminal post to the bare cable to measure the lug connection resistance. The readings should be less than 50 micro-ohms. If the cables do not meet this reading, new jumpers are to be installed and tested again. The resistance testing of the cable connections will be documented and provided to NEC personnel. 1.1.3 Verify inter-cell connection integrity: The resistance of all inter-cell connections should be measured and recorded using a digital low-resistance ohmmeter (DLRO). The readings must be within the manufacturer's specifications. 1.1.4 Verify proper polarity connection of cells. Verify the open circuit terminal voltage of each series connected bank of batteries. This value should be +/-480V. 1.1.5 The battery connections are to be torqued to the battery manufacturer's specifications. 1.1.6 Initial commissioning is to be performed on the new batteries. 1.1.7 Each cell voltage measured, internal ohmic test performed and negative terminal temperature test performed. This testing is to be documented and provided to NEC personnel. 1.1.8 The batteries are to be load tested after the battery has been fully charged by equalizing. 1.1.9 The NEC is to witness the battery installation and testing. 1.2 Installation: Working with NEC staff, furnish and install quantity of 80 -each Werker PN: WKHR12-100C/FR or equivalent batteries. 1.3 Disposal of Old UPS Batteries: The Bidder is responsible for the removal of the old batteries and the proper disposal of the batteries. 1.4 Work Hours: Battery installation must be performed during regular business hours, Mon-Fri, 8:00 a.m. - 4:00 p.m. (excluding Holidays) by an authorized technician. 1.5 Battery Purchase: The batteries to be purchased are 80 -each Werker PN: WKHR12-100C/FR or equivalent batteries. 1.6 Battery Installation: The work performed is to be according to national electric code. Removal and disposal of existing batteries must meet all federal regulations. All work is to comply with 2012 National Electric Code.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/16cd70ad08097467296073273e8bd8f3)
 
Place of Performance
Address: BLDG 341, 101 WAREHOUSE RD, Fort Leavenworth, Kansas, 66027, United States
Zip Code: 66027
 
Record
SN03892169-W 20150919/150918000638-16cd70ad08097467296073273e8bd8f3 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.