Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 23, 2015 FBO #5052
MODIFICATION

Y -- WY FLAP 129(1), Sand Creek Road

Notice Date
9/21/2015
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6815B00011
 
Archive Date
7/31/2015
 
Point of Contact
Joseph L Wilson, Phone: 7209633500, Jeremiah B. Rogers, Phone: 7209633500
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECS ARE NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS SEPTEMBER 28, 2015. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. Project Location This project begins at the intersection of Sand Creek Road and Interstate 90, near Beulah, WY. The project proceeds south for 6.o miles. Scope of the Work Schedule A: Consists of removal and replacement of 6 bridges. The existing bridges are concrete structures supported by wood piling. The new bridges will consist of precast concrete structures supported by GRS abutments or abutments supported by micro piles. The new bridges are all single span and vary in length from 38 to 65 feet and are 28 feet in width. Four (4) bridges will be built on GRS abutments and 2 will be built on abutments supported by micro piles. Each bridge will receive new guardrail and the road approaching each bridge will be reconstructed to accommodate the new bridges. Principal work items include: Removal of 6 existing bridges. 2600CY of embankment 12000 SY of geosynthetic reinforcement (GRS) 959 CY of riprap 1760 tons of aggregate base. 2186 LF of Precast Prestressed concrete slabs 16500 LB of reinforcing steel 1060 LF Micropiles (9.0 inch dia.) Diversion Construction 685 LF Bridge rail 600 LF Transition guardrail Seeding and mulch. Traffic control Option X: Consists of 6.0 miles of aggregate surface reconditioning and placement of 4 inches of aggregate base course. Principal Work Items include: Removal and replacement of 6 cattleguards 17,250 tons of aggregate base 300 STA of aggregate surface reconditioning Traffic Control The contracting range for this project is between $3 million to $5 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6815B00011/listing.html)
 
Place of Performance
Address: Black Hills National Forest, Beulah, Wyoming, 82712, United States
Zip Code: 82712
 
Record
SN03896089-W 20150923/150921235446-12030258dc42e2065aeb8edd08d401b2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.