FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 27, 2015 FBO #5056
AWARD

Z -- REVITALIZE ELECTRICAL SYSTEMS FOR THE CENTRAL CHILLER FACILITY AT BUILDING4473

Notice Date
9/25/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
NASA/George C. Marshall Space Flight Center, Procurement Office, Marshall SpaceFlight Center, AL 35812
 
ZIP Code
35812
 
Solicitation Number
NNM15551081E
 
Response Due
9/2/2015
 
Archive Date
6/12/2016
 
Point of Contact
Brian A. Speer, Contract Specialist, Phone 256-544-3038, Fax 256-544-6062, Email Brian.A.Speer@nasa.gov - Harry B. Craig, Contracting Officer, Phone 256-544-0515, Fax 256-544-8993, Email harry.b.craig@nasa.gov
 
E-Mail Address
Brian A. Speer
(Brian.A.Speer@nasa.gov)
 
Small Business Set-Aside
Total Small Business
 
Award Number
NNM15AA20C
 
Award Date
9/24/2015
 
Awardee
A. West Enterprise, LLC 705 Canal Street Albany, GA 31707
 
Award Amount
4769500
 
Description
The work to be performed under this project consists of providing the labor, equipment, and materials necessary to perform the upgrade, replacement, addition or removal of most of the electrical distribution equipment for Building 4473. Work will include, but is not limited to: The replacement of primary and secondary cabling, transformers, and utility switches as shown on construction drawings; Installation of primary cabling to the existing switchgear locations inside the facility; Installation of secondary cabling to the existing and new switchgear inside the facility; Installation of a new section of switchboard to the existing switchboard to facilitate easy switchover from the old system to the new system during electrical outages; Removal or replacement of multiple 480, 4160, and 12,470 volt main service entrances; Installation of a new dual transformer, 46KV to 12,470 volt substation to handle the six primary service to the existing facility; Installation of primary metering to the new substation; Replacement of exterior, oil-type transformers. The work performed under this project will primarily be electrical work with work in the Mechanical, Structural and Civil as needed to support the installation of the new electrical equipment.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/NASA/GMSFC/POVA/NNM15551081E/listing.html)
 
Record
SN03904978-W 20150927/150926000229-4b8286735edff5d713d8c2b98950563f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.