FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 30, 2015 FBO #5059
AWARD

Z -- Building 277 Repair SW Corridor at Kirtland AFB, NM

Notice Date
9/28/2015
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP-15-T-0125
 
Archive Date
10/28/2015
 
Point of Contact
Glenda Kohlieber, 575-652-4135
 
E-Mail Address
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP-15-P-0127
 
Award Date
9/28/2015
 
Awardee
ALMS, LIMITED COMPANY (620117833) <br> 11 ESPEJO AVE <br> MORIARTY, NM 87035
 
Award Amount
$78,976.31
 
Line Number
0001
 
Description
This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 277 Repair SW Corridor SPECIFIC REQUIREMENTS: a.Demolition 1.Contractor shall remove existing light switch as indicated on drawings. 2.Contractor shall remove existing heat detector and salvage for relocation as indicated on drawings. 3.Contractor shall remove existing speaker and salvage for relocation as indicated on drawings. 4.Contractor shall remove existing lights, ceiling tiles and grid as indicated on drawings. 5.Contractor shall remove existing red strobe light and salvage for relocation as indicated on drawings. 6.Contractor shall remove existing camera and salvage for relocation as indicated on drawings. b.Construction 1.Contractor shall provide and install new gyp. bd. as indicated on drawings. 2.Contractor shall provide and install new wall as indicated on drawings. 3.Contractor shall sound seal around all penetrations in ceiling as indicated on drawings. 4.Contractor shall provide and install new gyp. bd. on existing studs as indicated on drawings. 5.Contractor shall provide and install new light switch as indicated on drawings. 6.Contractor shall provide and install new led lighting as indicated on drawings. 7.Contractor shall provide and install new hard lid ceiling as indicated on drawings. 8.Contractor shall provide and install new BMS alarm system as indicated on drawings. 9.Contractor shall provide and install new access panel as indicated on drawings. 10.Contractor shall provide and install new rough-ins as indicated on drawings. 11.Contractor shall provide and install new chain link fence as indicated on drawings. c.Option 1 1.Contractor shall demo remove existing concrete and prep to receive new concrete as indicated on drawings. 2.Contactor shall provide and install new concrete sidewalk as indicated on drawings. 3.Contractor shall provide drainage under new concrete sidewalk as indicated on drawings. 3.REQUIRED SUBMITTALS: a.Submittals required for all items listed below: i.Lighting ii.Access Panel with Pull Down Ladder iii.As-Builts iv.Accident Prevention Plan v.O&M Manuals vi.Waste Summary Checklist if applicable
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0127.html)
 
Record
SN03906578-W 20150930/150928235546-3c9fe5d1f17e6d7890742dff54cb8974 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.