AWARD
Z -- Building 277 Repair SW Corridor at Kirtland AFB, NM
- Notice Date
- 9/28/2015
- Notice Type
- Award Notice
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- USACE District, Albuquerque, CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, NM 87109-3435
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP-15-T-0125
- Archive Date
- 10/28/2015
- Point of Contact
- Glenda Kohlieber, 575-652-4135
- E-Mail Address
-
USACE District, Albuquerque
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP-15-P-0127
- Award Date
- 9/28/2015
- Awardee
- ALMS, LIMITED COMPANY (620117833) <br> 11 ESPEJO AVE <br> MORIARTY, NM 87035
- Award Amount
- $78,976.31
- Line Number
- 0001
- Description
- This contract action was accomplished using other than competitive procedures because a statute exists that expressly authorizes or requires that the acquisition be made from a specific source or through another agency (FAR 6.302-5); specifically, Sole source awards under the 8(a) Program. Per FAR 6.302-5 a J&A is not required for this award. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 277 Repair SW Corridor SPECIFIC REQUIREMENTS: a.Demolition 1.Contractor shall remove existing light switch as indicated on drawings. 2.Contractor shall remove existing heat detector and salvage for relocation as indicated on drawings. 3.Contractor shall remove existing speaker and salvage for relocation as indicated on drawings. 4.Contractor shall remove existing lights, ceiling tiles and grid as indicated on drawings. 5.Contractor shall remove existing red strobe light and salvage for relocation as indicated on drawings. 6.Contractor shall remove existing camera and salvage for relocation as indicated on drawings. b.Construction 1.Contractor shall provide and install new gyp. bd. as indicated on drawings. 2.Contractor shall provide and install new wall as indicated on drawings. 3.Contractor shall sound seal around all penetrations in ceiling as indicated on drawings. 4.Contractor shall provide and install new gyp. bd. on existing studs as indicated on drawings. 5.Contractor shall provide and install new light switch as indicated on drawings. 6.Contractor shall provide and install new led lighting as indicated on drawings. 7.Contractor shall provide and install new hard lid ceiling as indicated on drawings. 8.Contractor shall provide and install new BMS alarm system as indicated on drawings. 9.Contractor shall provide and install new access panel as indicated on drawings. 10.Contractor shall provide and install new rough-ins as indicated on drawings. 11.Contractor shall provide and install new chain link fence as indicated on drawings. c.Option 1 1.Contractor shall demo remove existing concrete and prep to receive new concrete as indicated on drawings. 2.Contactor shall provide and install new concrete sidewalk as indicated on drawings. 3.Contractor shall provide drainage under new concrete sidewalk as indicated on drawings. 3.REQUIRED SUBMITTALS: a.Submittals required for all items listed below: i.Lighting ii.Access Panel with Pull Down Ladder iii.As-Builts iv.Accident Prevention Plan v.O&M Manuals vi.Waste Summary Checklist if applicable
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP-15-P-0127.html)
- Record
- SN03906578-W 20150930/150928235546-3c9fe5d1f17e6d7890742dff54cb8974 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |