Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 01, 2015 FBO #5060
SOLICITATION NOTICE

Y -- WY PRA 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2 - Project Description & Preliminary Plans with Preliminary Letter.

Notice Date
9/29/2015
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington, 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
DTFH70-15-R-00015
 
Point of Contact
Contracts G. Office, Phone: (360)619-7520
 
E-Mail Address
WFL.Contracts@dot.gov
(WFL.Contracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Preliminary Letter Preliminary Plans Project Description PROJECT: WY PRA 10(19), Grand Loop Road, Norris to Golden Gate, Phase 2, Park County, Wyoming LOCATION: This project is located within Yellowstone National Park. The Norris to Golden Gate corridor is between 6 and 14 miles north of Norris Junction along the Grand Loop Road. The Canyon Rims Overlook and Parking Areas is approximately 1 mile south of the Canyon Junction along South Rim Road and North Rim Road. WORK: Norris to Golden Gate corridor reconstruction is between 6 and 14 mile north of the Norris Junction along the Grand Loop Road. This project also includes construction of a new Stock Parking Area near Bunsen Peak parking area. Work consists of 150,000 to 200,000 CY roadway excavation (gross) grading, drainage, compaction, MSE walls, Reinforced Slope Stabilization, base, paving, pavement obliteration, and stone masonry. Three Canyon Rims Overlook and Parking Areas: The parking areas are approximately 1 mile south of the Canyon Junction along South Rim Road and North Rim Road. • Inspiration Point (Included in base bid): construction of trails and the overlook. Work consists of grading; paving, drainage; MSE, CIP and rockery walls; bench, handrail and vault toilet fixtures; and stone work. • Brink of Upper Falls: (potential Option area) construction of trails, overlooks, access road and parking lot. Work consists of grading; paving; curb and sidewalk; drainage; MSE and rockery walls; bench, handrail, and orientation pavilion fixtures; and stone work. • Uncle Tom's Point: (potential Option area) construction of trails, overlooks, and parking lot. Work consists of grading; paving; curb and sidewalk; drainage; MSE and rockery walls; bench, kiosk and vault toilet fixtures; steel boardwalk; and stone work. LENGTH: 7 miles TENTATIVE COMPLETION DATE: Fall 2018 ESTIMATED PRICE RANGE: Between Over $20,000,000 To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions. NOTICE OF SUBCONTRACTING OPPORTUNITY WY PRA YELL 10(19), Norris to Golden Gate - Phase II will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm This project is anticipated to be solicited Fall 2015/Winter 2016 Project magnitude is over $20 million. This project will include one base schedule. Three additional options are being considered for this project. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, theREQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. This paragraph announces possible financing available to small businesses. The three types of businesses that are eligible to receive a loan through this program are: (1) Firms that have received DBE certification from a state or local transportation agency; (2) Eligible small business firms; and (3) Firms that have received a disability rating by the Veteran's Administration and have certified themselves as a SDVOSB. Start-up businesses are not eligible to receive a STLP line of credit and should contact the SBA for information about other possible forms of financial assistance. (NOTE - This paragraph does not reserve this solicitation for these types of business): The Department of Transportation's (DOT) Short-Term Lending Program (STLP) offers working capital financing in the form of lines of credit to finance accounts receivable for transportation related contracts. The Maximum line of credit is $750,000. The STLP loan has a variable rate, which is connected to the prime rate. For more information see: http://www.dot.gov/osdbu/financial-assistance/short-term-lending-program.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH70-15-R-00015/listing.html)
 
Place of Performance
Address: PROJECT IS LOCATED approximately within Yellowstone National Park. The Norris to Golden Gate corridor is between 6 and 14 miles north of Norris Junction along the Grand Loop Road. The Canyon Rims Overlook and Parking Areas is approximately 1 mile south of the Canyon Junction along South Rim Road and North Rim Road., Wyoming, ., United States
 
Record
SN03907386-W 20151001/150929234856-0b740967cf05696a642a659101f898f9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.