Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 10, 2015 FBO #5069
SOURCES SOUGHT

66 -- Yb:YAG Amplifier System

Notice Date
10/8/2015
 
Notice Type
Sources Sought
 
NAICS
334516 — Analytical Laboratory Instrument Manufacturing
 
Contracting Office
Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
 
ZIP Code
94303
 
Solicitation Number
SLAC_100815-YAG(LL)
 
Archive Date
10/24/2015
 
Point of Contact
Lorenza S. Ladao, Phone: 6509263214
 
E-Mail Address
lladao@SLAC.stanford.edu
(lladao@SLAC.stanford.edu)
 
Small Business Set-Aside
N/A
 
Description
SLAC seeks vendors that can provide 1 Each of Yb: YAG Amplifier with the following minimum Specifications: a) The parameters of the high power Yb:YAG amplifier are specified below. • Pulse repetition rate frequency 0.1-1 MHz variable (nominal 0.1 MHz) • Average optical output power (400 W pre-amplifier) and >1.5 kW • Pulse duration ≈1-2 ps • Pulse energy >15 mJ at 0.1 MHz or >1.5 mJ at 1 MHz • Pulse energy stability <1% over 24 hours • Center wavelength out of laser amplifier 1030±1 nm • Spectral bandwidth with no ripples, no pedestals • Time-bandwidth product <0.5 (1 ps correspond to about 1.8 nm at FWHM) • Collimated free space output, M2 <1.3 • Polarization extinction ratio >30 dB, fixed in direction • Ellipticity >0.85 • Pulses have no pedestals, no background, satellite pulses (third order) <20% • No ASE background • Diode lifetime >1 year at 24/7 operation. b) The high power Yb:YAG amplifier is seeded with a 6 W beam from a 1030 nm fiber amplifier system. c) A 6 W uncompressed beam from the fiber amplifier system is further stretched to match the dispersion of the high power Yb:YAG amplifier compressor. d) The high power Yb:YAG amplifier includes diagnostics (CCD cameras) for optical alignment of the amplifier stages; additional motorized mirrors to remotely align the amplifier stages; a motorized re-collimation telescope for the amplified beam; a spatial filter unit to ensure M2 <1.3 at the output (if necessary, optional). e) Customer support required with a response time of <24 h. If this is not the case: proper training of SLAC personnel is required and additional critical spare parts at SLAC. f) On-site installation of laser amplifier. THIS IS NOT A REQUEST FOR QUOTE. VENDORS INTERESTED IN BEING CONSIDERED AS A POTENTIAL SOURCE SHOULD IDENTIFY THEMSELVES AS AN "INTERESTED PARTY" VIA THE FBO PORTAL. DO NOT CONTACT THE SUBCONTRACT ADMINISTRATOR.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/SLAC_100815-YAG(LL)/listing.html)
 
Place of Performance
Address: SLAC National Accelerator Laboratory, Menlo Park, California, 94025, United States
Zip Code: 94025
 
Record
SN03918257-W 20151010/151008234922-67976ca0108b7fde20cb4d7650cdaa13 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.