Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 11, 2015 FBO #5070
SOLICITATION NOTICE

71 -- Barracks Furniture - Package #1

Notice Date
10/9/2015
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
337122 — Nonupholstered Wood Household Furniture Manufacturing
 
Contracting Office
Department of the Navy, United States Marine Corps, MCB Camp Butler - Far East, PSC 557 Box 2000, Bldg 355 Camp Foster Okinawa Japan, FPO, 96379-2000, United States
 
ZIP Code
96379-2000
 
Solicitation Number
M67400-16-T-0003
 
Archive Date
11/7/2015
 
Point of Contact
Kazuho Tamayose, Phone: 816117458531
 
E-Mail Address
kazuho.tamayose.ja@usmc.mil
(kazuho.tamayose.ja@usmc.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Attachment #2: Bldg E and F qty Attachment #2: Bldg E and F Attachment #1: Bldg 3315 qty Attachment #1: Bldg 3315 Combined Synopsis Combined Synopsis/Solicitation-Supply This is a combined synopsis / solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This procurement is a small business set-aside. Therefore, any responsible source may submit a quote. This announcement constitutes the only solicitation. Therefore, quotes are being requested and a separate written solicitation will not be issued. Solicitation number M67400-16 -T-0003 applies and is issued as a Request for Quotation (RFQ). This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-76 and Defense Federal Acquisition Regulations Supplement Publication Notice (DPN) 20140721. The FSC code is 7105 and the NAICS code is 337122. Small Business Size Standard is 500 employees. *All quotes shall be submitted in English. * A single firm-fixed price contract will be issued and it is the Government's intent to award on an "all-or-none" basis to satisfy this requirement. SUBMISSION OF QUOTES Procurement Approach: The Contractor's quoted item descriptions shall reflect the characteristics and level of quality that will satisfy the Government's need as described in Attachment #1 (List of items and specifications) and Attachment #2 (Installation Instructions). A single firm-fixed price contract will be issued and it is the Government's intent to award on an "all-or-none" basis to satisfy this requirement. The Offeror is required to submit as its proposal the following: (X) Price Proposal (Solicitation No. M67400- 16-T-0003 ) (X) Clearly state whether the quoter can meet the required delivery timeframe. Vendors who cannot meet the delivery and installation timeframe, as stated below, will be considered Non-Responsive. (X) Offeror shall submit three separate volumes: Volume I - Technical Acceptability to the Requirement, Volume II - Price Proposal, and Volume III - Offeror's Representations and Certifications. Volume I : Technical Acceptability to the Requirement - Offerors shall submit, at a minimum, the following with their quote. Offeror shall submit "Descriptive Literature" as a part of its offer which is required to establish, for the purpose of evaluation and award, details of the product offered that are specified elsewhere in the solicitation and pertain to significant elements such as Design, Materials, Components, Performance characteristics; and, Methods of manufacture, assembly, construction, or operation. This literature shall include pictures of the items. To ensure technical acceptability: The manufacturer's name and manufacturer's complete part number of items quoted shall be submitted. A mere statement that the Quoter will meet the Government requirement is NOT sufficient. Technical Information WITH pictures: shall not contain any pricing information but shall include A picture (visual representation, illustration, depiction or photograph) with a detailed description or specification of the item being proposed to ensure adequate technical understanding and compliance of each item. EVERY SPECIFICATION, FOR EACH FURNITURE ITEM, SHALL BE ADDRESSED FOR COMPLIANCE WITH THE REQUIREMENTS LIST AND/OR STATEMENT OF WORK. FAILURE TO ADDRESS THE SPECIFICATIONS REQUESTED SHALL RESULT IN AN UNACCEPTABLE RATING. The information provided in the specifications section shall be from the manufacturer's specification sheet and shall not be a reiteration (Copy and Paste) of the information from the solicitation. Include drawings, floor layouts, product literature, pictures, commercial warranty information and description of ALL quoted items. Failure to provide floor layouts to show the items quoted fit in the rooms may result in as a "Non-Responsive" determination. Warranty terms shall be provided for all quoted items. Approximate : The Contractor's measurements shall be within 1-3 inches of approximate measurements given. Measurements that do not say approximate are exact. Volume II : P rice Proposal 1. Pricing: All quotes submitted shall be the Contractor's Best Pricing. Sample of the Floor plans have been provided as Attachment #1 and #2 for reference when preparing a quote. 2. All shipping and freight charges shall be included in the price of the item. Failure to include the shipping charge in the price of the item may result in a Non-Responsive determination. 3. Pricing terms and conditions: Offerors shall submit their best pricing terms and conditions in accordance with the Government desired pricing terms and conditions Volume III : Offeror's Representations and Certifications shall contain all information regarding Offeror's Representations and Certifications or a validation that System for Award Management (SAM) registration Online Representations and Certifications Application (ORCA) information is up to date and includes all the necessary representations and certifications. Only one (1) original copy shall be submitted for Volume III. Offeror's Representations and Certifications at FAR 52.212-3 and FAR 52.209-5 shall be completed. The following additional information MUST be provided with the quote under Volume III and on a separate page on company letterhead. Failure to provide this information may result in a Non-Responsive Determination. 1. Prompt Payment Terms: 2. Navy BPA Number & GSA Contract Number: 3. Expiration Dates: 4. Parent Name and Federal Tax I.D. No: 5. Company Federal Tax I.D. No: 6. E-Mail Address for POC: 7. Business Size: 8. Remittance Address: 9. Commercial and Government Entity Code (Cage) 10. Data Universal Numbering System (Duns) 11. Verification Of Company Registration In System for Award Management (SAMs): https://www.fsd.gov/app/sam/ 12. Delivery Time 13. U.S. Flag Vessel: (Answer must be yes or no) 14. Place of Manufacture Note to Offerors: 1) All and any communications/questions pertaining to this solicitation must be submitted in writing to the responsible Contracting Specialist, Kazuho Tamayose, no later than 16 October, 2015 @08:00 AM Japanese Standard Time (JST). If an Offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial quote, as received, without discussions. MAIL: Regional Contracting Office Attn: Ms. Kazuho Tamayose PSC 557 Box 2000 FPO AP 96373-2000 Hand Carried: Regional Contracting Office Attn: Ms. Kazuho Tamayose Bldg #355, MCIPAC Camp Smedley D. Butler, Okinawa, Japan Phone: 011-81-98-970-8531 (from U.S.) / 098-970-8531 (Local) Fax: 011-81-98-970-0969 (from U.S) / 098-970-0969 (Local) Email: kazuho.tamayose.ja@usmc.mil 2) Submission of offers: The solicitation must be returned to the address listed above at the date and time specified in combined synopsis/solicitation. Offers may be submitted by mail, email, courier, or facsimile. Facsimile offers are subject to the same rules as paper offers. The Government reserves the right to make award solely on the offers received or enter into "discussions" therefore quoters are cautioned that their initial quotes should contain their best terms from a technical and price standpoint. Offerors bear the burden of ensuring that offers (and any authorized modifications) reach the designated office on time and should allow a reasonable time for facsimile or email transmissions to be completed. 3) Offers may be submitted electronically (emailed); however, due to government computer firewall security, please be advised that it is the Offeror's responsibility to ensure that the Contracting Office receives all required documents. 4) All pages of the offer must reach the office before the deadline specified on the solicitation. Pages of a facsimile transmission that arrive in the office after the specified deadline will be marked as late. The Offeror bears the risk of non-receipt of facsimile transmissions and should confirm by telephone that any facsimile was received. Any facsimile transmission must clearly state the solicitation number and the name of the Contract Specialist on the first page, to ensure proper receipt. 5) Contract Authority: This solicitation is being conducted under FAR subpart 12 and 13.5. 6) System for Award Management (SAM) Additional Information. All DoD Contractors are now required to be registered within the SAM database prior to award, during performance and throughout final payment of any contract resulting from this request for quotation. Offerors may obtain information on registration and annual confirmation requirements by calling 1-312-463-3376 or via the Internet at: https://www.sam.gov. Registration on line will normally take 5 business days vice the standard 30 days processing time required through other methods. 7) Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. 8) Offered prices shall not include the Consumption Tax in accordance with paragraph c. FAR Clause 52.229-6 entitled, "Taxes - Foreign Fixed - Price Contracts". 9) Offerors shall ensure that all correspondence that is addressed to the United States Government is submitted in English or with an English translation. NOTE: Offeror's expenses incurred as a result of proposal preparation shall not be reimbursed by the U.S. Government. Door-to-Door Shipping: The items in this order will be shipped to the following address: For CLIN 0001AA: Camp Schwab, Bldg# 3315 Henoko, Nago City, Okinawa, Japan 905-2171 For CLIN 0002AA: Camp Schwab, Bldg# E and F Henoko, Nago City, Okinawa, Japan 905-2171 Upon shipment, please provide the carrier-provided tracking number to the Regional Contracting Office. Please fax to 011-81-611-745-0963. Delivery: The Government requires delivery no later than 31 Mar 2016. A pre-installation meeting(s) shall be conducted with Government representatives no less than twenty-four hours before the installation begins. Government point of contact and phone number will be provided at time of contract award. Installation: The installation will be coordinated with the Contractor no less than two weeks prior to actual required installation date, once this date is known. Installation should be completed within 30 days of arrival. Location: All furniture and furnishings will be delivered and installed at: Camp Schwab, Okinawa, Japan Evaluation: Award will be made to the Lowest Price Technically Acceptable quote. The Government intends to make a single Firm Fixed Price Award to satisfy this requirement. Award will be based on the initial evaluation of quotes received in response to the solicitation. Therefore, vendors are cautioned that their initial quotes should contain their best terms from a technical and price standpoint. Quotes shall be received by 08:00 AM JST, 23 Oct 2015 to be considered for award. The Government reserves the right to make award solely on the quotes received or request clarifications. Vendors bear the burden of ensuring that quotes (and any authorized modifications) reach the designated office before the deadline. All pages of the quote must reach the office before the deadline specified. Late quotes will not be accepted or evaluated. Quotes may be submitted electronically (emailed); however, due to government computer firewall security, please be advised that it is the Vendor's responsibility to ensure that the Contracting Office receives all required documents. NOTE: Vendor's expenses incurred as a result of proposal preparation shall not be reimbursed by the U.S. Government. Period for acceptance of quotes. The Quoter agrees to hold the prices in its quote firm for 9 0 calendar days from the date specified for receipt of quotes, unless another time period is specified in an addendum to the solicitation. Attachments: •1. Barracks Furniture Camp Schwab, Bldg# 3315: Required Items and Specifications / Floor Plans & Layouts •2. BEQ E and F Furniture Camp Schwab: Required Items and Specifications / Floor Plans & Layouts CLIN structure CLIN 0001 CLIN 0001AA: Barracks Furniture Camp Schwab, Bldg# 3315 Please see Attachment #1 for required items and specifications Price shall include all cost associated with shipping items to Camp Schwab, Okinawa, Japan. FOB: Destination CLIN 0001AB: Installation for Barracks Furniture Camp Schwab, Bldg# 3315 CLIN 0002 CLIN 0002AA: BEQ E and F Furniture Camp Schwab Please see Attachment #2 for required items and specifications Price shall include all cost associated with shipping items to Camp Schwab, Okinawa, Japan. FOB: Destination CLIN 0002AB: Installation for BEQ E and F Furniture Camp Schwab, Bldg# E and F 52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999) EVALUATION FOR AWARD The Government shall utilize the source selection criteria as outlined below and evaluate in accordance with the FAR, 13.5 utilizing at its discretion 15.101-2 Lowest Price Technically Acceptable Source Selection Process. a) The basis of award will be determined by means of an integrated assessment of each proposal in terms of Technical Acceptability to the Requirement and Price Information. Award will be made in accordance with the FAR Lowest Price Technically Acceptable source selection process (LPTA), to the responsive Offeror whose offer is the lowest price meeting or exceeding the acceptability standards in accordance with the technical specifications in the solicitation. The offer must be determined to be technically acceptable before being considered further. The following factors shall be used to evaluate offers: 1. Evaluation of Non-Cost/Price (Technical) Technical Acceptability to the Requirement Product information Offeror shall submit "Descriptive Literature" as a part of its offer which is required to establish, for the purpose of evaluation and award, details of the product offered that are specified elsewhere in the solicitation and pertain to significant elements such as Design, Materials, Components, Performance characteristics; and, Methods of manufacture, assembly, construction, or operation. This literature shall include pictures of the items. Adjectival Ratings for Non-Cost/Price (Technical): The Offeror's Technical Acceptability to the Requirement will be evaluated to determine if it is acceptable or unacceptable, using the ratings and descriptions outlined in the Table below. Technical Acceptable/Unacceptable Ratings Rating Description Acceptable Proposal clearly meets the minimum requirements of the solicitation. Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation. 2. Evaluation of Price The Government will evaluate the Offeror's price of each priced Contract Line Item Number (CLIN). An Offeror's proposal shall represent the Offeror's best efforts to respond to the solicitation. The evaluated price will be the price of each priced Contract Line Item Number (CLIN). Award shall be made to the lowest evaluated price of proposals meeting or exceeding the acceptability standards in accordance with the technical specifications in the solicitation. The price of all CLINs will be evaluated by the Contract Team for price reasonableness using price analysis techniques. 3. Best-Value Decision and Documentation a. The Government shall select the source whose proposal offers the best value to the Government in accordance with established criteria in the solicitation provision. b. The Government shall ensure the proposals are evaluated for acceptability but not ranked using the non-cost/price factors. b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful Offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. The following clauses apply to this acquisition: FAR 52.203-3 Gratuities (Apr 1984) FAR 52.203-12 Limitation on Payment to Influence Certain Federal Transactions (Oct 2010) FAR 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (Apr 2014) FAR 52.204-2 Security Requirements (Aug 1996) FAR 52.204-4 Printed or Copied Double-Sides on Postconsumer Fiber Content Paper (May 2011) FAR 52.204-13 System for Award Management Maintenance (Jul 2013) FAR 52.204-16 Commercial and Government Code Reporting (Jul 2015) FAR 52.204-17 Ownership or Control of Offeror (Nov 2014) FAR 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2015) FAR 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) FAR 52.212-4 Contract Terms and Conditions -- Commercial Items (Sep 2013) FAR 52.219-6 Notice of Total Small Business Set-Aside (Nov 2011) FAR 52.222-19 Child Labor-Cooperation with Authorities and Remedies (Jan 2014) FAR 52.225-14 Inconsistency between English Version and Translation of Contract(Feb 2000) FAR 52.225-17 Evaluation of Foreign Currency Offers(Feb 2000) FAR 52.232-23 Assignment of Claims (Jan 1986) FAR 52.232-33 Payment by Electronic Funds Transfer -System for Award Management (Jul 2013) FAR 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) DFARS 252.203-7000: Requirements Relating to Compensation of Former DoD Officials (Sep 2011) DFARS 252.203-7002: Requirement to Inform Employees of Whistleblower Rights (Sep 2013) DFARS 252.204-7003: Control of Government Personnel Work Product (Apr 1992) DFARS 252.204-7012 Safeguarding of Unclassified Controlled Technical Information (Nov 2013) DFARS 252.211-7003 Item Identification and Valuation (Dec 2013) DFARS 252.211-7006: Passive Radio Frequency Identification (Sep 2011) DFARS 252.225-7043 Antiterrorism/Force Protection for Defense Contractors Outside the United States (Jun 2015) DFARS 252.227-7015 Technical Data-Commercial Item (Feb 2014) DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (Jun 2012) DFARS 252.232-7006 Wide Area WorkFlow Payment Instructions (May 2013) DFARS 252.232-7008 Assignment of Claims (Overseas) (Jun 1997) DFARS 252.232-7010 Levies on Contract Payments (Dec 2006) DFARS 252.233-7001 Choice of Law (Overseas) (Jun 1997) DFARS 252.243-7001 Pricing of Contract Modifications (Dec 2012) DFARS 252.246-7006: Warranty Tracking of Serialized Items.(Jun 2011) DFARS 252.247-7023 Transportation of Supplies by Sea (Apr 2014) Responsible quoters must be active in the System Award for Management in accordance with DFARS 252.204-7004 Alternate A (Feb 2014), and DFARS 252.232-7006 (JUN 2012) Wide Area Work Flow Payment Instructions The following Provisions apply to this RFQ: FAR 52.204-7 System Award for Management FAR 52.209-7 Information Regarding Responsibility Matters (Jul 2013) FAR 52.212-1 Instructions to Offerors -- Commercial Items (Jul 2013), FAR 52.212-3 Offeror Representations and Certifications -- Commercial Items (Nov 2013), FAR 52.233-3 Protest After Award (Aug 1996). DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials (Nov 2011) DFARS 252.247-7022 Representation of Extent of Transportation by Sea (Aug 1992) 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2015) (a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014) (2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553). (3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)). (b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.) _X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) ( 41 U.S.C. 4704 and 10 U.S.C. 2402). _ ___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509). ____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.) _X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note). ___ (5) [Reserved] ___ (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C). ___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C). _X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug, 2013) (31 U.S.C. 6101 note). _X_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313). ____ (10) [Reserved] ____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a). _ ____ (ii) Alternate I (NOV 2011) of 52.219-3. ____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a). ____ (ii) Alternate I (JAN 2011) of 52.219-4. ____ (13) [Reserved] _X_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644). ____ (ii) Alternate I (NOV 2011). ____ (iii) Alternate II (NOV 2011). ____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644). ____ (ii) Alternate I (Oct 1995) of 52.219-7. ____ (iii) Alternate II (Mar 2004) of 52.219-7. ____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)). _X_ (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C. 637(d)(4)). ____ (ii) Alternate I (Oct 2001) of 52.219-9. ____ (iii) Alternate II (Oct 2001) of 52.219-9. ____ (iv) Alternate III (OCT 2014) of 52.219-9. ____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)). ____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)). ____ (20) 52.219-16, Liquidated Damages-Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)). ____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f). ____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)). ____ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (July 2013) (15 U.S.C. 637(m)). ____ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (July 2013) (15 U.S.C. 637(m)). ____ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755). ____ (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2014) (E.O. 3126). ____ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015). ____ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246). ____ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212). ____ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793). ____ (31) 52.222-37, Employment Reports on Veterans (July 2014) (38 U.S.C. 4212). ____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). ____ (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627). _X_ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627). ____ (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.) ____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.) ____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.) ____ (36) (i) 52.223-13, Acquisition of EPEAT ® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514). ____ (ii) Alternate I (Jun 2014) of 52.223-13. ____ (37)(i) 52.223-14, Acquisition of EPEAT ® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514). ____ (ii) Alternate I (Jun 2014) of 52.223-14. ____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b). ____ (39)(i) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s 13423 and 13514). ____ (ii) Alternate I (Jun 2014) of 52.223-16. _X_ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513). ____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83). ____ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43. ____ (ii) Alternate I (May 2014) of 52.225-3. ____ (iii) Alternate II (May 2014) of 52.225-3. ____ (iv) Alternate III (May 2014) of 52.225-3. _X_ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note). _X_ (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury). ____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note). ____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150 ____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150). ____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)). ____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)). _X_ (50) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (July 2013) (31 U.S.C. 3332). ____ (51) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (July 2013) (31 U.S.C. 3332). ____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332). ____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a). ____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). ____ (ii) Alternate I (Apr 2003) of 52.247-64. (c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.) _____ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). _____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67). _____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67). _____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67). _____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67). _____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67). _____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67). _____ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658). ' _____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792). _____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)). (d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clauseat 52.215-2, Audit and Records--Negotiation. (1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract. (2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved. (3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law. (e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause- (i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509). (ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities. (iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17. (iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015). (v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246). (vi) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212). (vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793). (viii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212). (ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40. (x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67). (xi) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627). _____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627). (xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.) (xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67) (xiv) 52.222-54, Employment Eligibility Verification (Aug 2013). (xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658). (xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note). (xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6. (xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64. (2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations. (End of clause) Note: Full text of each FAR and DFARS clause and provision may be accessed electronically at http://farsite.hill.af.mil/ Payment shall be made electronically by DFAS. Quoters shall submit their response to this RFQ via email to kazuho.tamayose.ja@usmc.mil or via fax to 011-81-611-745-0959 by the closing date of this solicitation. However, quoters are advised it is their responsibility to ensure all information pertaining to this RFQ is received in full by the Regional Contracting Office-MCIPAC NLT the expiration of this RFQ. CONTRACTOR MOTOR VEHICLES Registration/Permits for Contractor's Motor Vehicle(s): All company-owned and privately owned motor vehicles required to be in military installations during the performance of this contract must be registered with the Provost Marshal's Office, Marine Corps Base, Camp Butler. Vehicle permits may be issued to civilian Contractors for the duration of their contract, until expiration of base pass or vehicle inspection, whichever occurs first or until termination of their employment. Included in vehicle permit requests shall be the license number, year, make, model, color, and operator's name for each vehicle. The Contractor shall hand-carry the request to the Vehicle Registration Section, Building 5638, MCB, Camp Foster (Telephone #098-970-7481). All necessary decals and/or permits shall be displayed on the vehicles in the manner directed by the Vehicle Registration Section. Proof of insurance must also be presented to the Provost Marshal upon submission of the temporary vehicle permit or vehicle decal or upon request. The minimum requirement for insurance is the Japanese Compulsory Insurance (JCI) under Japanese Motor Vehicle Damage Compensation Guarantee Law. Upon contract expiration or vehicle inspection expiration, whichever comes first, any vehicle passes received for operation under this contract shall immediately become void. Identification of Contractor's Vehicle(s): Each Contractor vehicle shall have the name of the Contractor neatly exhibited on each side of the cab. The vehicle shall be in maintained in a satisfactory mechanical condition, shall at all times, display a valid license plate and safety inspection sticker. The Contractor shall operate vehicles in compliance with base traffic regulations. ADDITIONAL REQUIRED INSURANCE FOR JAPAN (a) All vehicles must be properly inspected/Insured in accordance with Japanese Compulsory Insurance (JCI). The Contractor shall procure and maintain during the entire period of performance under this contract the following minimum insurance on each vehicle used by the Contactor at the work site: Type: Automobile Property Damage Insurance Amount: 30,000,000 (or U.S. Dollar equivalents) Bodily Injury Insurance Amount: 30,000,000 Yen (or U.S. Dollar equivalents) (b) Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the laws of the state in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer. (c) The Contractor agrees to insert the substance of this clause, including this Paragraph (c), in all subcontracts hereunder. JAPANESE ROAD LAWS The Japanese Road Law will be complied with by the Contractor while on U. S. Military installations to specifically include: (a) Article 43 The Road Law (Japan)(prohibitive acts relative to roads) (1) No person shall commit the following described acts: (2) Damaging the road, causing roads to be littered with debris, polluting the roads with debris or fall out from motor vehicles or otherwise defacing roads unreasonably or without due cause. (b) Article 43-2 (Measures to be taken to prevent cargo or things loaded on motor vehicles from falling out) (1) The agency managing a road may when there is reasonable cause for him to feel that things or cargo being carried in or on a motor vehicle may fall out and damage, pollute or otherwise deface the road in such a manner as to hinder or obstruct the traffic, order the operator of the vehicle in question to take steps or measures necessary to prevent occurrence of such hindrance by stopping the operation of the vehicle or correcting the method of loading or the method of traveling or operation of the vehicle. PHYSICAL SECURITY Contractor shall be responsible for safeguarding all government property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured, and utilities turned off or set for conservation. KEY CONTROL The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the government are not lost or misplaced, and are not used by unauthorized persons. The Contractor shall report lost keys to the COR. The Contractor shall not duplicate any keys. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor's employees to permit entrance of persons other than Contractor's employees engaged in the performance of assigned work in those areas. The Contractor shall report in the occurrences of a lost or duplicated key to the Contracting Officer via the COR. In the event keys are lost or unauthorized duplication occurs through the fault of a Contractor employee, The Government may, at its option, require the Contractor to replace keys, reimburse the government for replacement of locks, or re-key as a result of Contractor losing keys. In the event a master key is lost or duplicated, the Contractor shall replace all locks and keys for that system and the total cost will be deducted from the monthly payment PROCEDURES FOR INSTALLATION SERVICES : The following procedures shall apply to installation. •1) INITIAL COORDINATION MEETING : The Contractor's POC shall be available, in person, telephonically or other communications means, for the Initial Coordination Meeting 60 days, no less than 30 days, prior to projected installation date. The dates for the installation shall be confirmed and the Contractor's responsibilities listed in the Statement of Work shall be reviewed. •2) CONTRACTING OFFICER (CO): U.S. Government official authorized to enter into, make changes to, or terminate contracts on behalf of the US Government. Contracting Officers are responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, and safeguarding interests of the United States in its contractual relationships. •3) GOVERNMENT REPRESENTATIVE (Gov't Rep): Government liaison, which functions as the technical representative monitoring, delivery and performance of the contract. Gov't rep is not authorized to enter into any agreements, obligate the government or direct any changes to the contract. Gov't reps (alternative Gov't reps) of this contract are also responsible for escorting the contractor to the work site when needed and securing keys of the buildings during the periods of performance. •4) PRE-INSTALLATION MEETING : The Contractor's POC and the installation foreman shall be available, in person, for a Pre-Installation Meeting no less than twenty-four hours before the installation begins. During that meeting the installation process shall be discussed, rules of conduct on Base shall be reiterated, and the installation responsibility list in this Statement of Work shall be reviewed. •5) ROOM CONFIGURATION : At the beginning of the installation, all rooms within the building shall be unoccupied and free of obstacles including furniture, drapes and carpet prior to installation. •6) POST INSTALLATION INSPECTION : At the end of installation, the On Site Foreman and the Government shall conduct a joint inspection of all rooms where WRC Furniture and Related Accessories have been installed. Discrepancies shall be corrected before the Government accepts responsibility for the WRC Furniture and Related Accessories. The installation process is considered incomplete until a post installation inspection is completed by the Government and found to be acceptable. •7) CLEAN UP : The Contactor is responsible for removing all materials and other debris, accumulated from occupant premises, as a result of disassembling, loading, and unloading of the furniture. Contractor Personnel shall collect and deposit materials and other debris at location designated by the Government. •8) DISPOSAL OF PACKAGING AND OTHER REFUSE : The Contractor must make prior arrangements with the Government before disposing any refuse aboard any Government base. Nothing may be placed in any government trash container unless that Contractor has received prior authorization from the Government. •9) DELAYS : Any delay to the schedule agreed upon at the Initial Coordination Meeting shall require agreement between the Contractor and Contracting Officer or Supply Officer. The Contractor shall take every step to avoid delays. •· The Contractor shall notify the Government as soon as a delay to the schedule is anticipated. •· The Government shall notify the Contractor as soon as a delay to the schedule is anticipated. •10) HOURS OF OPERATION : The Contractor shall deliver furniture to the designated work site. The Contractor shall commence set-up and installation during the normal duty hours of 0730 - 1630, Monday and Friday. The Contractor shall contact the Government 48 hours in advance of planned installation date for coordination purposes. •11) PERFORMANCES OF SERVICES : Services will not be accepted on Saturdays, Sundays, or Federal holidays. Government representatives shall sign for inspection and acceptance of all services between 0730 and 1630, Monday through Friday, except on the U.S. Federal holiday listed below: Recognized Holidays: The contractor is not required to provide service on the following Federal Holidays*: New Year's Day **1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day **4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans' Day **11 November Thanksgiving Day Fourth Thursday in November Christmas Day **25 December Notes: * In addition to these Federal Holidays, if the President of the United States issues an executive order closing the federal government that date shall be considered a recognized federal holiday. (reference Executive Order 11582 of February 11, 1971, and 5 U.S.C. 5546 and 6103(b) and other similar statues insofar as they relate to the pay and leave of employees of the United States. **If a holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on a Sunday, it will be observed on the following Monday. •12) CONTRACTOR MANAGER : The Contractor shall provide a Contract Manager as the Primary Point of Contact (POC) who shall be responsible for the performance of work under this Award. This person shall be reachable by both telephone and electronic message, through which all communication shall flow between the Government and the Contractor. This POC must be able to answer question pertaining to all aspects of the order quickly and accurately. •13) ON-SITE FOREMAN : The Contractor shall designate an on-site foreman that shall be present during the entire installation for each requirement. That on-site foreman shall be responsible for the conduct of the entire installation crew, and compliance with this Procedure for Installation Services. •14) CONTRACTOR EMPLOYEES : The Contractor's employees shall present a neat appearance and be easily recognized as Contractor employees. This may be accomplished by wearing distinctive clothing bearing the company name and the employee's name. •15) CONTRACTOR ACCESS TO GOVERNMENT INSTALLATIONS : All access to Government installations shall be coordinated with the Government or Quality Assurance Representative. The identity of this individual will be available to the Contractor during the initial coordination meeting. •16) DAMAGE TO GOVERNMENT PROPERTY AND FACILITIES : In instances where Government Property or Facilities have been damaged by the Contractor, a full report of the facts and extent of damages shall be submitted to the COR within 24 hours following the incident. The COR shall forward the report to the Contracting Officer within 24 hours of receipt. If the Contractor is found to be negligent, the Contractor shall be held responsible for all expenses related to reimburse of all damages to the Government. •17) STORAGE : The Government will not perform final inspection and acceptance of arriving furniture and related accessories, or containers, until the installation is complete or unless the Government causes a delay at no fault of the Contractor. •18) SHORTAGES AND MISSING FURNITURE AND ACCESSORIES, OR COMPONENTS OF FURNITURE AND ACCESSORIES : Missing end items or components (hinges, screws, drawers, etc.) must be DELIVERED within a period NOT TO EXCEED fifteen (15) days of the identification of the shortage. All missing items shall be procured and delivered by the Contractor, and such expenses shall be without cost to the Government. •19) EXCESS FURNITURE AND ACCESSORIES, OR EXCESS COMPONENTS OF FURNITURE AND ACCESSORIES : The Contractor shall be responsible for the removal or disposal of excess end items or components, at no cost to the Government. •20) INCIDENTAL DAMAGE TO FURNITURE AND ACCESSORIES : Damage to furniture and related accessories caused by Contractor Employees shall be replaced at the Contractors Expense as if it were missing. All repairs and replacements must be completed in a timely fashion to ensure the Contractor meets the delivery schedule. •21) FURNITURE BARCODE LABELING PLACEMENT : The Government shall provide the Contractor the labeling materials prior to the installation of the furniture. The placement of barcode labeling shall be consistent and uniformed in order to provide access for the ease of scanning. The Contractor shall use the following guidelines and the attached presentation: "Guide for Bachelor Housing Furniture Barcode Labeling Placement" for all furnishings assigned to the Bachelor Housing facilities. Deviations to barcode labeling placement due to style of furniture must be approved by the Government. Bed (with headboard) - bottom right of headboard facing front. Nightstand (with drawer) - rear, upper top left corner. Desk carrel - left side, top left. Desk - left side, top left. TV stand - left side, top left. Bookshelf - left side, top left. Dresser chest - left side, top left. Chair (desk, activity, dining) - under seat, inside beam. Chair (no underside beam) - flat surface under seat. Sofa (one, two, three seater) - center of crossbeam under chair. Recliner - under leg rest, brace facing forward. Table (dining, pub, coffee, activity, end) - flat surface under table, inside beam for non-wood surface. Mirror (wall) - if width permits, right side underneath frame. If width does not permit, bottom right corner front of frame. Lamp (table, floor) - bottom of lamp base. Microwave - left side of appliance, top left corner. Refrigerator - left side of appliance, top left corner. •22) TYPHOON READINESS: The Contractor shall depart military bases when Tropical Condition of Readiness 1C (TCCOR 1C or TC-1C) is declared by Military Weather Station authorities. The contractor shall depart military bases and monitor radio/television until it changes to TCCOR SW. When Tropical Cyclone Condition of Readiness "STORM WATCH" (TCCOR SW or TC-SW) is declared by Military Weather Station authorities, the contractor shall restart the service within 2 hours. In this case, services will begin the next normal workday at 7:30am. •23) SAFETY: The contractor shall be responsible for ensuring the safety of their personnel along with any other personnel who should enter the worksite. Requirements for safety will be strictly adhered to as they pertain to contractor operations and as required by Industrial Safety and Health Law and Related Legislation of Japan (ref: (a)), and Marine Corps Order P5100.8F series Ground Occupational Safety and Health Program. •24) SAFETY PLAN: A written safety plan must be submitted as part of the contractor's quote if the contractor intends to use overhead devices including (but not limited to): crane, cherry picker, etc., that would create an overhead hazard. If required the plan shall ensure compliance with Marine Corps Order P5100.8. Contractor shall address general safety guidelines as well as specific safety requirements, such as fall protection measures. Plan shall also address required training prior provision of required training prior to the start of work in order to perform the work safely. Training must be documented, and documentation of the training must be provided with the safety plan to include, but not to limited to, indication that proper equipment for the work will be utilized. •25) KEY PERSONNEL: There will always be a representative of the building present during the cleaning process to report any damages or problems that occur with the facilities. GOVERNMENT FURNISHED PROPERTY AND SERVICE Utilities: Contractor shall be provided the use of utilities (i.e., water and electricity) when needed to perform the job. Contractor shall use the utilities conservatively. Lights shall be used only in areas where work is actually being performed. Water faucets or valves shall be turned off when not in use. Use of Government telephones is not authorized. Police and Fire Protection: The following telephone numbers are furnished. Dial the Ext. numbers after the tone. Emergency: 098-893-7911 Provost Marshall: 098-892-5111 Ext. 637- 3500 Fire Protection: 098-892-5111 Ext. 637-3500 (End of RFQ)
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/USMC/M67400/M67400-16-T-0003/listing.html)
 
Place of Performance
Address: Camp Schwab, Okinawa, Non-U.S., United States
 
Record
SN03919714-W 20151011/151009234425-48d530caa8ec3fc55f0d5339d4a62e70 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.