MODIFICATION
Y -- CA FTNP MOJA 10(1) ROADWAY SAFETY IMPROVEMENTS - Solicitation 1
- Notice Date
- 10/26/2015
- Notice Type
- Modification/Amendment
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH6815B00023
- Archive Date
- 12/15/2015
- Point of Contact
- Megan M. Mavis, Phone: 7209633369
- E-Mail Address
-
megan.mavis@dot.gov
(megan.mavis@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Invitation For Bid CA FTNP MOJA 10(1) Roadway Safety Improvements Location: Mojave National Preserve, CA County: San Bernardino PROJECT DETAILS: This project includes spot safety improvements to fix poor geometry and will require minor realignment. It also includes 100 miles of pavement preservation, 10 miles of pulverization, 3 low water crossings, and 1 mile of slope armoring. Type of Construction: Minor grading, drainage, aggregate base, asphalt paving, low water crossings, riprap slope armoring, chip seal, asphalt patching, erosion control, signing and striping, and temporary traffic control. This project consists of: Schedule A: 57 miles of pavement preservation of Kelbaker Road. Significant Items for Schedule A Include Approximately: 830,000 sqyd of chip seal; 1,530 ton of emulsified asphalt; 550 tons of fog seal; 30,000 sqyd of overlay patch; 1,050 ton of hand patch; 1,210,000 lnft of waterborne striping. Schedule B: 57 miles of pavement preservation of Kelbaker Road, spot improvements to 4 locations on Kelbaker Road, 1 spot improvement along Kelso Cima Road, and 2 low water crossings on Cedar Canyon Road. Significant Items for Schedule B include approximately: 830,000 sqyd of chip seal; 1,530 ton of emulsified asphalt; 550 tons of fog seal; 30,000 sqyd of overlay patch; 1,050 ton of hand patch; 6,000 ton of hot asphalt concrete pavement; 26,000 cuyd of roadway excavation; 12,700 ton of aggregate base; 1,215,000 lnft of waterborne striping; 2,150 flagger hours. Option W: Intersection realignment of Cima Road at Morning Star Mine Road. Significant Items for Option W include approximately: 450 ton of hot asphalt concrete pavement; 1,150 ton of aggregate base; 1,100 of roadway excavation; 300 flagger hours; 50 lnft of 30-inch pipe; 15 cuyd of class 3 riprap. Option X: Pulverization of 10 miles of Lanfair Road. Significant Items for Option X include approximately: 510 sta of 3-inch depth pulverization; 510 of centerline verification and staking; 500 flagger hours. Option Y: 500 lnft of minor grading, 1 mile of slope armoring, and 1 low water crossing on Black Canyon Road. Significant Items for Option Y include approximately: 5,700 cuyd of class 3 riprap; 470 flagger hours; 700 ton of aggregate base; 7.750 sta of linear grading. Option Z: Pavement preservation of 10 miles of Black Canyon Road, 14 miles of Essex Road, and 18 miles of Cima Road. Significant Items for Option Z include approximately: 610,000 sqyd of chip seal; 1,120 ton of emulsified asphalt; 1,800 ton of hand patch; 400 ton of fog seal; 19,000 sqyd of overlay patch; 890,000 lnft of waterborne striping. Estimated total cost for the project including options is $10,000,000.00 to $15,000,000.00.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6815B00023/listing.html)
- Place of Performance
- Address: Mojave National Preserve, San Bernardino, County, CA., California, United States
- Record
- SN03930266-W 20151028/151026234133-91d69deb1574034e794dbec38487983f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |