Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 29, 2015 FBO #5088
SOLICITATION NOTICE

Y -- NV FLAP CR196(1) SILVER PEAK ROAD

Notice Date
10/27/2015
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6815B00033
 
Archive Date
12/30/2015
 
Point of Contact
Craig Holsopple, Phone: 720-963-3500, Agnes Rysz, Phone: 3039633500
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENATIVE ADVERTISEMENT DATE IS NOVEMBER 12, 2015. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT DETAILS: NV FLAP CR196(1) Silver Peak Road LOCATION: The project starts at the intersection of Silver Peak Road and US95 in Esmeralda County, Nevada and proceeds west 16.5 miles along Silver Peak Road. This project will consist of aggregate base, hot asphalt concrete pavement, grading, culverts, and concrete headwalls/wingwalls. SCHEUDLE A is approximately 6.0 miles (MP 4 to MP 10) of roadway construction including culvert installation, concrete headwalls and wingwalls, embankment, placement of new aggregate base, hot asphalt concrete paving, signing and striping. Significant items include 31 new culverts 24" to 60" in diameter, 10 each concrete headwalls/wingwalls for 48"-60" culverts, 12,600 CUYD of Roadway Aggregate Method 2, approximately 38,000 CY of embankment, 15,100 tons of hot asphalt concrete pavement, 121,200 LF of pavement markings. OPTION X is approximately 6.5 miles (MP 10 to MP 16.5) of roadway construction including culvert installation, concrete headwalls and wingwalls, embankment, placement of new aggregate base, hot asphalt concrete paving, signing and striping. Significant items include 2 new culverts 36" to 48" in diameter, 2 each concrete headwalls/wingwalls for 48" culverts, 13,200 CUYD of Roadway Aggregate Method 2, approximately 16,000 CY of embankment, 16,000 tons of hot asphalt concrete pavement, 112,800 LF of pavement markings. OPTION Y is approximately 4.0 miles (MP 0 to MP 4) of roadway construction including culvert installation, concrete headwalls and wingwalls, embankment, placement of new aggregate base, hot asphalt concrete paving, signing and striping. Significant items include 24 new culverts 24" to 60" in diameter, 14 each concrete headwalls/wingwalls for 48"-60" culverts, 8,200 CUYD of Roadway Aggregate Method 2, approximately 22,500 CY of embankment, 10,000 tons of hot asphalt concrete pavement, 77,300 LF of pavement markings. It is anticipated that this project will be advertised in November 2015, with construction occurring from January through October, 2016. The contracting range for this project is between $10 million and $15 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6815B00033/listing.html)
 
Place of Performance
Address: Silver Peak Road and US95, Esmeralda Country, NV, Goldfield, Nevada, 89013, United States
Zip Code: 89013
 
Record
SN03930763-W 20151029/151027234039-b45b928bd1de6a34beb3f95cdf58250b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.