Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 14, 2015 FBO #5104
MODIFICATION

C -- Cutter Lateral Water Treatment Plant -- Industry Day

Notice Date
11/12/2015
 
Notice Type
Modification/Amendment
 
NAICS
541330 — Engineering Services
 
Contracting Office
Bureau of Reclamation Upper Colorado Region Regional Office 125 South State Street, Room 8100 Salt Lake City UT 84138 US
 
ZIP Code
00000
 
Solicitation Number
R16PS00051
 
Archive Date
11/20/2015
 
Point of Contact
Corpening, Leslie
 
Small Business Set-Aside
N/A
 
Description
Cutteral Lateral Water Treatment Plant -- Industry Day The Bureau of Reclamation (Reclamation), a water management agency within the Department of the Interior (Interior), announces an Industry Day for any entity or entities interested in designing and building a water treatment plant for the Cutter Lateral portion of the Navajo Gallup Water Supply Project (NGWSP) located in Northern New Mexico approximately 30 miles Southeast of Bloomfield. The Industry Day is scheduled for November 18-19, 2015, at the DOI University, US Department of the Interior, National Indian Programs Training Center located at 1011 Indian School Road NW, Suite 254, Albuquerque, New Mexico. The purpose of this Industry Day is to gather information from interested parties and is deemed essential as part of our collaborative, deliberate planning process for Reclamation in identifying and evaluating alternatives for designing and building the CLWTP. INDUSTRY DAY SCHEDULE Wednesday, November 18, 2015 8:00 a.m. ¿ 9:00 a.m.Registration 9:00 ¿ 11:30 a.m.Plenary Session 11:30 a.m. ¿ 12:30 p.m.Break 12:30 p.m. ¿ 2:30 p.m.Questions & Answers 2:30 p.m. ¿ 3:30 p.m.Wrap Up / Conclusion Thursday, November 19, 2015 8:30 a.m. ¿ 11:30 a.m.Individual Meetings* *To schedule an individual meeting, call Ms. Leslie Corpening at (801) 524-3738 or e-mail at lcorpening@usbr.gov. Each meeting will be 30 minutes in duration. DESCRIPTION The Omnibus Public Land Management Act of 2009, Title X Part III (Public Law 111-11) signed on March 30, 2009, provided the authorization to construct this important project as a major component of the Navajo Nation San Juan River Basin Water Rights Settlement in New Mexico. An RFI (R15PS01052) was announced on May 22, 2015 which requested the following information. 1.Questions for Design-Build Teams: a.Does your company have the capacity to permit, design, and build the CLWTP considering the information provided in this RFI and assuming there are no significant deviations from this information once more data is provided? b.Company point of contact, address, telephone number, and status of the company; (i.e., small business, HUBZone business, etc.) c.Provide your company ¿s portfolio as it relates to: 1.Design-build in general. 2.Specific application to water treatment facilities. 3.Similar size/type of WTP needed for this project that you have designed and/or built. 4.Highlight any innovative treatment (design or construction) techniques you have used to reduce cost and/or maintenance time. d.Describe your company ¿s experience in designing water treatment plants for natural organic matter reduction, including but not limited to biofiltration and other treatment processes. e.Describe company ¿s experience with water treatment operation under a ¿design-build-operate ¿ scenario. 2.Questions for Equipment Manufacturers, Representatives and Process Engineers: a.Suggested treatment processes with pertinent technical data sufficient to support manufacturer ¿s representations, operational requirements, costs (initial installation and operational), warranties and proprietary information. b.Market standard sizes, lay-outs, plans and specifications, space and power requirements, typical and maximum/minimum feed rates, typical replacement or service time requirements, and typical life cycle costs per 1,000 gallons for a water treatment plant of this size/capacity. c.Company information, such as socio economic status, size, market share, annual sales, length of time in business, length of time with this specific product. d.List of projects using this treatment process. DESIGN DATA A. The CLWTP will serve the Eastern portion of the NGWSP and will consist of a water treatment plant (WTP) and pumping plant. The Cutter Lateral obtains water from Cutter Reservoir, an existing regulating reservoir on the Navajo Indian Irrigation Project. B. Hydraulic Data 1.WTP The WTP will be designed and built for the 2020 demand with the capability of being expanded for the 2040 demand (Table 1). The influent /effluent difference assumes an approximate 4% required maximum loss through the WTP. Table 1: Year 2020 and 2040 water demands UnitsDemand20202040 InfluentEffluentInfluentEffluent MGDMaximum Day4.03.85.65.4 Average Day3.13.04.34.2 Minimum Month2.52.43.53.3 2.Pumping Plant Pumping Plant shall be designed for sufficient head (420 feet) to pump water to proposed operating storage tank elevations at the following flow rates (Table 2): Table 2: Year 2020 and 2040 pumping plant flow rates YearUnits (CFS)(GPM) 20205.92,700 20408.33,800 C. Water Quality Data 1.Raw Water Quality The source water is a reservoir with a good water quality. See the 4/6/2015 water sample highlighted water quality results (Table 3). Table 3: Highlighted water quality results (4/6/2015 sample) AnalyteValueUnits GeneralAlkalinity (Total)81mg/L DOC2.5mg/L Hardness101mg/L as CaCO3 pH8.1 TDS160mg/L TOC2.6mg/L TSS4.5mg/L Turbidity4.5NTU UV0.079cm-1 IonsArsenic0.001mg/L Bromide<0.2mg/L Chloride<10mg/L Iron0.14mg/L Manganese0.002mg/L Sodium15mg/L Sulfate45mg/L 2.Finished Water Quality a.Finished water must meet all USEPA primary and secondary drinking water standards. b.The primary finished water quality parameter of concern is natural organic matter and the resulting disinfection byproduct formation. This is due to the long distribution system length. c.The finished water DOC concentration will need to be approximately 0.5 mg/L. D. Treatment Constraints 1. ¿96% overall WTP water recovery 2.Use of chloramines is not permitted POINT OF CONTACT Leslie Corpening, Contracting Officer, Upper Colorado Regional Office, 801-524-3738; Email: lcorpening@usbr.gov Additional information on the Navajo Gallup Water Supply Project can be found at: http://www.usbr.gov/uc/rm/navajo/nav-gallup/
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/bcfece25b94187db2b8a1b8d91d645b4)
 
Record
SN03944167-W 20151114/151112234119-bcfece25b94187db2b8a1b8d91d645b4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.