SOLICITATION NOTICE
R -- Intermittent Senior Design Advisor - SOLICITATION
- Notice Date
- 11/17/2015
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 541990
— All Other Professional, Scientific, and Technical Services
- Contracting Office
- Agency for International Development, Overseas Missions, Senegal USAID-Dakar, Dept of State, Washington, District of Columbia, 20521-2050
- ZIP Code
- 20521-2050
- Solicitation Number
- SOL-685-16-000007
- Archive Date
- 12/19/2015
- Point of Contact
- Samuel Carter, Phone: +221-33-879-4870, PAPA BABACAR NIOWY SENGHOR, Phone: 00221338794970
- E-Mail Address
-
sacarter@usaid.gov, psenghor@usaid.gov
(sacarter@usaid.gov, psenghor@usaid.gov)
- Small Business Set-Aside
- N/A
- Description
- USAID/SENEGAL ECONOMIC GROWTH INTERMITTENT SENIOR DESIGN ADVISOR The U.S. A g e ncy for In t erna t i onal Development (USAID) Mi ssi o n t o Senegal i s se e kin g a S e ni or D e s i g n Advisor to a s s i s t th e Mi s s ion during a period of need. The Ec o n o mic Growth (EG) Office i s embarki n g on a n ew p r o jec t d es i g n th a t ta k es in t o c o n s i d era t i o n the g rowth of the EG portfo l i o ov e r the l a st two yea r s. Because of the inherent link bet w e e n a g r i c ultu r e / food sec urit y, nutrition, natural r es o urce m a n ag e m e n t, climate chang e, energy, a nd private se c t o r inv e s tment and trad e, a n e w E c o nom i c Growth P r o ject Activity D e s ign (PAD) will e n s ure that a ll in v e s tmen t s s imultaneou s ly address t h e EG Development Objective. The EG Office i s comm it t e d t o e n s urin g t h a t th e project design p r ocess i s informed b y e v i d ence and s up p o r t e d by ana l y t i c r i g o r (s ee Ann e x 3 ). To t h a t end, the Seni o r D e s i g n Advisor w ill be r e s p o n s ib l e for l e a di n g the assessment and analysis, d r a ft concept not e, and final d e s i g n of the n e w EG PA D, as well as contributing to the developm e nt o f certain activity program d e s c ription s/sc o p e s o f w o rk (SOW). During the d e s ign phas e, project s a re expected t o: •- Closely link up to relevant country deve l o pment strategies and priorities; •- Take mea s urem e nt and eva lu ation in t o consideration from the st a rt ; •- E s tabli s h c lear expectations f o r the imp a c t and outcomes of the p r oject; •- K e e p t he ultim a te goa l of susta inabili ty in mind ; and •- Link up development tra j e c t o r y, b e s t pr a c ti c es and t h eory of c han ge. USAID has deve l o ped s e veral key guidance and policy piece s that a r e in c o r p o r a t ed into the ADS 200 s e ri e s, i n c ludi n g revised project d e s i g n guidance.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/AID/OM/SEN/SOL-685-16-000007/listing.html)
- Place of Performance
- Address: USAID/SENEGAL, Senegal
- Record
- SN03948134-W 20151119/151117234839-1255582658c0f557378b378dd4f12113 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |