59 -- Maintenance and Testing of Electrical Equipment Dorn VA Medical Center, Columbia, SC - Attachment

Notice Date
1/4/2016
 
Notice Type
Attachment
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of Veterans Affairs;W.J.B. Dorn VA Medical Center;6439 Garners Ferry Road;Columbia SC 29209-1639
 
ZIP Code
29209-1639
 
Solicitation Number
VA24716R0196
 
Response Due
1/28/2016
 
Archive Date
3/28/2016
 
Point of Contact
JOSEPH LOCKE
 
E-Mail Address
6-4000,
 
Small Business Set-Aside
Total Small Business
 
Description
The Department of Veteran Affairs, Dorn VA Medical Center, 6439 Garners Ferry Road, Columbia, SC 29209 has a requirement for the maintenance and testing of electrical equipment. The Government expects to award to a single contractor a contract which shall be Firm Fixed Price with a firm quantity and no option years. This requirement is being set-aside for Small Business participation only. NAICS code for this requirement is 238210 with a small business size of $15M. Only offers from those firms regularly established in the business of providing these services will be considered. Subcontracting will not be allowed. All responsible sources may submit a proposal, which shall be considered. Any and all questions regarding this solicitation must be in writing and must include telephone number, fax number and point of contact to Attn: Joseph Locke, Contract Specialist, joseph.locke@va.gov. Please see solicitation for additional information regarding this requirement. SITE VISIT: See clause 52.237-1, Site Visit (APR 1984). Organized site visits have been scheduled for Monday, January 18, 2016 at 10:00 AM EST for the Dorn VA Medical Center, 6439 Garners Ferry Road, Columbia, SC 29209. Contractors shall report to Mr. Andrew Gross, as he will be the Point of Contact for the site visit. Mr. Gross can be reached at 803-776-4000, Ext: 4048. No questions will be asked and answered during the site visit; all questions must be sent via e-mail or FAX to the Contracting Officer, Joseph Locke at e-mail: joseph.locke@va.gov no later than January 21, 2016 at 2:00 PM EST. An amendment to the RFQ will be posted on FedBiz Ops on or about January 25, 2016 with all questions received, including all answers. All RFQ's shall be submitted and received no later than January 28, 2016 by 2:00 PM EST. Timeframe: Monday, January 4, 2016- RFP issued on FBO; Monday, January 18, 2016- Site Visit at Dorn VA Medical Center Thursday, January 21, 2016- Turn-In Questions Monday, January 25, 2016- Post Questions/ Answers on FBO (Estimated Date) Thursday, January 28, 2016- Receive RFP's Monday, February 1, 2016- Award Contract (Estimated Date) NOTE: This is the ONLY site visit scheduled for this project; individual or separate site visits will not be scheduled. This is not a mandatory site visit, but it is highly encouraged to attend before submitting a quote. If you have any questions, please contact the Contracting Officer, Joseph Locke at 803-776-4000 x7814 or e-mail at joseph.locke@va.gov. ? DEPARTMENT OF VETERANS AFFAIRS WJB DORN VA MEDICAL CENTER STATEMENT OF WORK FOR Maintenance, Inspection, and Testing of the Electrical Power Distribution System Revised: June 3, 2015 1.Introduction: A.This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all of its components at the WJB Dorn VA Medical Center. These work items are referenced as "Maintenance and Testing" in this document, hereafter. B.This SOW describes the requirements for the Qualified Electrical Contract Professionals - known as "Contractors" in this document, hereafter. Contractors who are contracted by VA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all of its components shall meet all requirements stated in Section 2 of this SOW. C.This SOW describes the requirements to establish maintenance and testing reports. 2.Qualifications of Contractors: A.Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor's business. B.Contractors shall be certified by the InterNational Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. C.Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, low voltage switchboards & switchgear; low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances. D.Contractors shall have safety trainings - either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S - Electrical, and the NFPA 70E - Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor' Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work. E.Contractors shall have ready access to the latest versions of the following references: 1)NFPA 70, National Electrical Code. 2)NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. 3)NFPA 70E, Standard for Electrical Safety for the Workplace. 4)NFPA 110, Standard for Emergency and Standby Power System. 5)OSHA Standard 29 CFR 1910, Subparts I & S. 6)InterNational Electrical Testing Association, Inc. (NETA) - Maintenance and Testing Specifications. 7)Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers. 8)VHA Directive 1028, Electrical Power Distribution Systems 9)SOP 137M 27, Lockout/Tagout Practices 10)SOP 138M 3-1, Electrical Distribution Systems Maintenance, Testing and Safety Practices E.Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate. 3.Summary of Work: A.The Contractor shall provide a proposed schedule with their bid proposal. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work period. The proposed schedule shall be reviewed by the VAMC Engineering Service; any requirements for adjusting the schedule (e.g. to minimize disruption to the VAMC) shall be incorporated by the Contractor. B.Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer and Chief of Engineering Service for immediate actions. C.Work items, definitions, and references shall comply with the latest edition of the NETA - Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. Below is a list of electrical equipment that shall be maintained and tested: 1.Switchgear and Switchboard Assemblies. (To include distribution panels and panelboards) 2.Transformers, Dry Type, Air-Cooled, Low-voltage, Small. 3.Metal-Enclosed Busways. (Building 100 Fire Pump circuits between the splice box and ATS, three sections) 4.Circuit Breakers, Air, Insulated-Case/ Molded-Case. (Branch circuit breakers shall be exercised only. Testing is not required) 5.Circuit Breakers, Air, Low-Voltage Power. 6.Grounding Systems. (For each facility listed under section 3. E.) 7.Motor Control, Motor Starters, Low-Voltage. 8.Emergency Systems, Automatic Transfer Switches. D.Attachments. Government Furnished. 1.Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. This is a detailed listing of some of the equipment listed above. 2.One-line and other informational drawings of the Electrical Power Distribution System. These drawings are not certified as-built drawings. (To be provided to the awardee) 3.Electrical Power System study information relevant to the scope of this effort, such as coordination study data, short-circuit analysis, arc-flash hazard analysis and available protective device setting information. (To be provided to the awardee) E.The following facilities are part of this statement of work: 100, 100A, 103, 103A, 106, 114, 120, 6, 7, 8, 9, 9A, 20, 22, 25, 34, 36, and 105. F.Infra-Red Scanning/Thermographic Survey shall be performed on electrical equipment. 1.Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers' specifications. 2.Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system. G.System Function Tests. Provide function test for all equipment listed in this Scope of Work. H.Test Conditions. 1.Contractor shall purchase two spare breakers of each type and size and have these breakers on hand before opening and testing molded case circuit breakers. These spares will be used in the event of a breaker failure. Any unused breakers will be turned over to the VA Contracting Officer at the completion of the project. 2.Switchgear, switchboards, panels and motor control centers listed in the government furnished inventory will include testing and maintenance on all over current protective devices within its enclosure. Each overcurrent protective device is not listed separately. 3.Majority of work will occur outside of normal business hours of M-F, 7:00 am to 5:00 pm. 4.Work will take place on de-energized equipment where possible. Follow the requirements of SOP 137M 27. Any energized work must be performed by permit only and with the approval of the Medical Facility Director. See SOP 138M 3-1. 5.All outage requests require a 30 calendar day notice. 6.Contractor will assist VA personnel in determining all areas affected by each outage. 4.Final Report: A.A complete written report of the work performed shall be provided to the VA within 21 calendar days of completion. Information shown in the report shall be as following: 1)Company's name, addresses, telephone, & FAX numbers. 2)Name and signature of contractors who perform the maintenance and testing. 3)VA Work Contract Number, name and number of VA Contracting Officer. 4)Date and Time of work. 5)Copies of contractors' valid licenses, professional and training certificates. 6)Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera. 7)Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. 8)Descriptions of work items. 9)Test data. 10)Reference materials such as equipment manufacturer's specifications, coordination study, etc. 11)Remarks on conditions of electrical equipment. List all deficiencies, if any. 12)Recommended corrective actions, if any. B.Submit one (1) hard copy of the complete written report to VA Contracting Officer within twenty-one (21) calendar days of visit. C.Submit four (4) hard copies of the complete written report, and two (2) CD-ROM or DVD of the electronic version of the report in Microsoft Word format to the Chief of Engineering Service within twenty-one (21) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods. ? Basis of Award Project: Maintenance and Testing of Electrical Equipment The lowest price technically acceptable source selection process will be used as basis of award. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for all non-cost/price factors. **ALL factors must be rated ACCEPTABLE to be considered for award. Non-Cost/Price Factors 1.Technical Approach - Technical approach to complete the project in accordance with the Statement of Work (SOW), must provide documentation to prove ALL of the following sub-factors listed below: a.Contractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor's business. b.Contractors shall be certified by the InterNational Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. c.Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, low voltage switchboards & switchgear; low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances. ? d.Contractors shall have safety trainings - either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S - Electrical, and the NFPA 70E - Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor' Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work. e.Contractors shall have ready access to the latest versions of the following references: 1)NFPA 70, National Electrical Code. 2)NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. 3)NFPA 70E, Standard for Electrical Safety for the Workplace. 4)NFPA 110, Standard for Emergency and Standby Power System. 5)OSHA Standard 29 CFR 1910, Subparts I & S. 6)InterNational Electrical Testing Association, Inc. (NETA) -Maintenance and Testing Specifications. 7)Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers. 8)VHA Directive 1028, Electrical Power Distribution Systems 9)SOP 137M 27, Lockout/Tagout Practices 10)SOP 138M 3-1, Electrical Distribution Systems Maintenance, Testing and Safety Practices f.Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate. 2.Management/Quality Control Approach - Proposal shall address your Management/Quality Control Approach to complete the project in accordance with the SOW. Offerors shall submit a list of personnel regularly employed on a full-time basis including number of years experience performing the type of work required for this contract. 3.Relevant Experience/Past Performance - The Relevant Experience/Past Performance evaluation will assess the relative risks associated with an offeror's likelihood of success in performing the solicitation's requirements as indicated by that offeror's record of Relevant Experience/Past Performance. Offerors must provide at least two (2) references and two (2) successfully completed contracts that demonstrate previous work experience in providing all labor, material, and equipment to provide the waste disposal service required in the SOW. Provide description of projects, dollar value, and Point of Contact(s) including phone/FAX numbers. Each factor will be scored as Acceptable or Unacceptable as defined below. Each proposal will be evaluated against the SOW and the stated evaluation criteria. Each proposal is evaluated using the same standards. "Lowest Price, Technically Acceptable" Evaluation Standards Acceptable ALL of the minimum acceptable criteria are clearly met by the proposal. The offeror's proposal meets the performance and technical capability requirements defined in the SOW. NOTE: Once the proposals have been determined to be "technically acceptable," award will based on cost/price only. Unacceptable Not all of the minimum acceptable criteria are met by the proposal. An unacceptable proposal contains one or more deficiencies. Proposal fails to meet specified minimum performance and technical capability requirements defined in the SOW. The following table will be used for each proposal received to score each LPTA factor as to whether it is Acceptable or Unacceptable. Non-Cost/Price FactorsOfferorTechnically acceptable Technical Approach Management/Quality Control Approach Relevant Experience/Past Performance ? Description: Inventory of Electrical Power Distribution System equipment to be maintained, inspected, and tested under this Scope of Work. This is a detailed listing of some of the equipment listed above. Attachment # 1 PANEL MCC NameTypeBus Voltage 1B100:EMCC-C2LV MCC480 2B100:EMCC-C3LV MCC480 3B100:EMCC-C4LV MCC480 4B100:EMCC-CBLV MCC480 5B100:EMCC-D5LV MCC480 6B100:EMCC-DBLV MCC480 7B100:EMCC-F1LV MCC480 8B100:EMCC-FBLV MCC480 9B100:MCC-A2LV MCC480 10B100:MCC-A3LV MCC480 11B100:MCC-A4LV MCC480 12B100:MCC-A5LV MCC480 13B100:MCC-C1LV MCC480 14B100:MCC-C2LV MCC480 15B100:MCC-C3LV MCC480 16B100:MCC-C4LV MCC480 17B100:MCC-D2LV MCC480 18B100:MCC-D3LV MCC480 19B100:MCC-D4LV MCC480 20B100:MCC-D5LV MCC480 21B100:MCC-DBLV MCC480 22B100:MCC-EB1LV MCC480 23B100:MCC-EB2LV MCC480 24B100:MCC-EB3LV MCC480 25B100:MCC-EB4LV MCC480 26B100:MCC-EB4-1LV MCC480 27B100:MCC-EB4-2LV MCC480 28B100:MCC-F1LV MCC480 29B100:MCC-FBLV MCC480 30B100:P-150A1LV Panelboard120 31B100:P-150B2LV Panelboard120 32B100:P-150C3LV Panelboard120 33B100:P-164A1LV Panelboard120 34B100:P-164B2LV Panelboard120 35B100:P-164C3LV Panelboard120 36B100:P-166A1LV Panelboard120 37B100:P-166B2LV Panelboard120 38B100:P-166C3LV Panelboard120 39B100:P-168A1LV Panelboard120 40B100:P-168BLV Panelboard120 41B100:P-168B2RLV Panelboard120 42B100:P-168C3LV Panelboard120 43B100:P-169A1LV Panelboard120 44B100:P-169B2LV Panelboard120 45B100:P-169C3LV Panelboard120 46B100:P-1C90LV Panelboard480 47B100:P-1DP1LV Panelboard480 48B100:P-1DP2LV Panelboard480 49B100:P-1DP2S1LV Panelboard480 50B100:P-1DP2S2LV Panelboard480 51B100:P-1DP2S3LV Panelboard480 52B100:P-1DP2S4LV Panelboard480 53B100:P-1DP2S5LV Panelboard480 54B100:P-1DP2S6LV Panelboard480 55B100:P-1DP2S7LV Panelboard480 56B100:P-1DP3LV Panelboard480 57B100:P-1DP4LV Panelboard480 58B100:P-1R1LV Panelboard208 59B100:P-1R10LV Panelboard208 60B100:P-1R11LV Panelboard208 61B100:P-1R12LV Panelboard208 62B100:P-1R13LV Panelboard208 63B100:P-1R14LV Panelboard208 64B100:P-1R15LV Panelboard208 65B100:P-1R15ALV Panelboard208 66B100:P-1R16LV Panelboard208 67B100:P-1R17LV Panelboard208 68B100:P-1R18LV Panelboard208 69B100:P-1R19LV Panelboard208 70B100:P-1R2LV Panelboard208 71B100:P-1R20LV Panelboard208 72B100:P-1R21LV Panelboard208 73B100:P-1R22LV Panelboard208 74B100:P-1R3LV Panelboard208 75B100:P-1R4LV Panelboard208 76B100:P-1R5LV Panelboard208 77B100:P-1R6LV Panelboard208 78B100:P-1R7LV Panelboard208 79B100:P-1R8LV Panelboard208 80B100:P-1R9LV Panelboard208 81B100:P-2DPLV Panelboard480 82B100:P-2R1LV Panelboard208 83B100:P-2R2LV Panelboard208 84B100:P-2R3LV Panelboard208 85B100:P-2R4LV Panelboard208 86B100:P-2R5LV Panelboard208 87B100:P-2R6LV Panelboard208 88B100:P-2R7LV Panelboard208 89B100:P-2R8LV Panelboard208 90B100:P-2WR1LV Panelboard208 91B100:P-2WR2LV Panelboard208 92B100:P-2WR3LV Panelboard208 93B100:P-2WRDPLV Panelboard208 94B100:P-3DPLV Panelboard480 95B100:P-3ED1LV Panelboard208 96B100:P-3R1LV Panelboard208 97B100:P-3R10LV Panelboard208 98B100:P-3R2LV Panelboard208 99B100:P-3R3LV Panelboard208 100B100:P-3R4LV Panelboard208 101B100:P-3R5LV Panelboard208 102B100:P-3R6LV Panelboard208 103B100:P-3R7LV Panelboard208 104B100:P-3R8LV Panelboard208 105B100:P-3R9LV Panelboard208 106B100:P-3WD1LV Panelboard208 107B100:P-4DPLV Panelboard480 108B100:P-4R1LV Panelboard208 109B100:P-4R2LV Panelboard208 110B100:P-4R3LV Panelboard208 111B100:P-4R4LV Panelboard208 112B100:P-4R5LV Panelboard208 113B100:P-4R6LV Panelboard208 114B100:P-4R7LV Panelboard208 115B100:P-4R8LV Panelboard208 116B100:P-4R9LV Panelboard208 117B100:P-4THDLRLV Panelboard480 118B100:P-4WDPLV Panelboard480 119B100:P-5DPLV Panelboard480 120B100:P-5R1LV Panelboard208 121B100:P-5R2LV Panelboard208 122B100:P-5R3LV Panelboard208 123B100:P-5R4LV Panelboard208 124B100:P-5R5LV Panelboard208 125B100:P-5R6LV Panelboard208 126B100:P-5R7LV Panelboard208 127B100:P-A1LV Panelboard240 128B100:P-BDP1LV Panelboard480 129B100:P-BDP10LV Panelboard480 130B100:P-BDP2LV Panelboard480 131B100:P-BDP3LV Panelboard480 132B100:P-BDP4LV Panelboard480 133B100:P-BDP5LV Panelboard480 134B100:P-BDP6LV Panelboard480 135B100:P-BDP8LV Panelboard480 136B100:P-BDPCRMLV Panelboard208 137B100:P-BMELV Panelboard208 138B100:P-BPR1LV Panelboard208 139B100:P-BR1LV Panelboard208 140B100:P-BR10LV Panelboard208 141B100:P-BR10ALV Panelboard208 142B100:P-BR13LV Panelboard208 143B100:P-BR2LV Panelboard208 144B100:P-BR3LV Panelboard208 145B100:P-BR4LV Panelboard208 146B100:P-BR5LV Panelboard208 147B100:P-BR6LV Panelboard208 148B100:P-BR7LV Panelboard208 149B100:P-BR8LV Panelboard208 150B100:P-BR9LV Panelboard208 151B100:P-BYL2LV Panelboard480 152B100:P-C1DPLV Panelboard480 153B100:P-C1L1LV Panelboard480 154B100:P-C1L1ALV Panelboard480 155B100:P-C1L2ALV Panelboard480 156B100:P-C1R1LV Panelboard208 157B100:P-C1R2LV Panelboard208 158B100:P-C1R3LV Panelboard208 159B100:P-C1R4LV Panelboard208 160B100:P-C2DPLV Panelboard480 161B100:P-C2L1LV Panelboard480 162B100:P-C2R1LV Panelboard208 163B100:P-C2R2LV Panelboard208 164B100:P-C2R3LV Panelboard208 165B100:P-C2R4LV Panelboard208 166B100:P-C2R5LV Panelboard208 167B100:P-C2W1LV Panelboard208 168B100:P-C2W2LV Panelboard208 169B100:P-C2WDPLV Panelboard480 170B100:P-C3DPLV Panelboard480 171B100:P-C3L1LV Panelboard480 172B100:P-C3R1LV Panelboard208 173B100:P-C4DPLV Panelboard480 174B100:P-C4L1LV Panelboard480 175B100:P-C4R1LV Panelboard208 176B100:P-C4R2LV Panelboard208 177B100:P-C4R3LV Panelboard208 178B100:P-C4R4LV Panelboard208 179B100:P-C5DPLV Panelboard480 180B100:P-C5L1LV Panelboard480 181B100:P-C5R1LV Panelboard208 182B100:P-C5R2LV Panelboard208 183B100:P-CBDP1LV Panelboard480 184B100:P-CBDP2LV Panelboard480 185B100:P-CCTVLV Panelboard208 186B100:P-CT1 & 2 SFLV Panelboard480 187B100:P-CT1 BASIN HTRLV Panelboard480 188B100:P-DB1LV Panelboard208 189B100:P-E1DPLV Panelboard480 190B100:P-E1DP2LV Panelboard480 191B100:P-E1DP2ALV Panelboard480 192B100:P-E1L1LV Panelboard480 193B100:P-E1R1LV Panelboard208 194B100:P-E1R16ALV Panelboard208 195B100:P-E1R2LV Panelboard208 196B100:P-E1R3LV Panelboard208 197B100:P-E1R4LV Panelboard208 198B100:P-E1R8LV Panelboard208 199B100:P-E1R8-ALV Panelboard208 200B100:P-E1RSLV Panelboard208 201B100:P-E2DPLV Panelboard480 202B100:P-E2L1LV Panelboard480 203B100:P-E2L1ALV Panelboard480 204B100:P-E2R1LV Panelboard208 205B100:P-E2R2LV Panelboard208 206B100:P-E2WD1LV Panelboard208 207B100:P-E2WDP2LV Panelboard480 208B100:P-E3DPLV Panelboard480 209B100:P-E3L1LV Panelboard480 210B100:P-E3L1ALV Panelboard480 211B100:P-E3R1LV Panelboard208 212B100:P-E3R2LV Panelboard208 213B100:P-E4DPLV Panelboard480 214B100:P-E4L1LV Panelboard480 215B100:P-E4L1ALV Panelboard480 216B100:P-E4R1LV Panelboard208 217B100:P-E4R2LV Panelboard208 218B100:P-E4WDPLV Panelboard480 219B100:P-E4WR1LV Panelboard208 220B100:P-E4WR2LV Panelboard208 221B100:P-E5DPLV Panelboard480 222B100:P-E5L1LV Panelboard480 223B100:P-E5L1ALV Panelboard480 224B100:P-E5R1LV Panelboard208 225B100:P-E5R2LV Panelboard208 226B100:P-EBDPLV Panelboard480 227B100:P-EBDP1LV Panelboard480 228B100:P-EBDP2LV Panelboard480 229B100:P-EBDP3LV Panelboard480 230B100:P-EBDP4LLV Panelboard480 231B100:P-EBDP4RLV Panelboard480 232B100:P-EBDP6LV Panelboard480 233B100:P-EBDP7ALV Switchboard208 234B100:P-EBDP9ALV Panelboard480 235B100:P-EBDP9BLV Panelboard208 236B100:P-EBL1LV Panelboard480 237B100:P-EBL1ALV Panelboard480 238B100:P-EBL2ALV Panelboard480 239B100:P-EBPR1LV Panelboard208 240B100:P-EBR1LV Panelboard208 241B100:P-EBR10LV Panelboard208 242B100:P-EBR11LV Panelboard208 243B100:P-EBR11ALV Panelboard208 244B100:P-EBR11BLV Panelboard208 245B100:P-EBR11CLV Panelboard208 246B100:P-EBR12LV Panelboard208 247B100:P-EBR2LV Panelboard208 248B100:P-ECPBTLV Panelboard480 249B100:P-EF5LV Panelboard480 250B100:P-EMDP6LV Panelboard480 251B100:P-EQBCLV Panelboard208 252B100:P-EQBHLV Panelboard480 253B100:P-LS1DPLV Panelboard480 254B100:P-LS1L1LV Panelboard480 255B100:P-LS1R1LV Panelboard208 256B100:P-LS2DPLV Panelboard480 257B100:P-LS2L1LV Panelboard480 258B100:P-LS2R1LV Panelboard208 259B100:P-LS2WL1LV Panelboard480 260B100:P-LS3DPLV Panelboard480 261B100:P-LS3L1LV Panelboard480 262B100:P-LS3R1LV Panelboard208 263B100:P-LS4DPLV Panelboard480 264B100:P-LS4L1LV Panelboard480 265B100:P-LS4R1LV Panelboard208 266B100:P-LS5DPLV Panelboard480 267B100:P-LS5L1LV Panelboard480 268B100:P-LS5R1LV Panelboard208 269B100:P-LSBDP1LV Panelboard480 270B100:P-LSBDP2LV Panelboard480 271B100:P-LSBL1LV Panelboard480 272B100:P-LSBR1LV Panelboard208 273B100:P-LSGR1LV Panelboard480 274B100:P-LSGR2LV Panelboard208 275B100:P-MSI850LV Panelboard480 276B100:P-PBLOADLV Panelboard480 277B100:P-PS4R1LV Panelboard208 278B100:P-RL1LV Panelboard240 279B100:P-RL2LV Panelboard208 280B100:P-RP1LV Panelboard208 281B100:P-RP2LV Panelboard208 282B100:P-RP3LV Panelboard208 283B100:P-RP5LV Panelboard208 284B100:P-RP6LV Panelboard208 285B100:P-TBPLV Panelboard480 286B100A:P-1DL1LV Panelboard480 287B100A:P-1DLS1LV Panelboard480 288B100A:P-1DLSR1LV Panelboard208 289B100A:P-1DR1-1LV Panelboard208 290B100A:P-1DR1-2LV Panelboard208 291B100A:P-1DR2LV Panelboard208 292B100A:P-2DCR1LV Panelboard208 293B100A:P-2DCR2LV Panelboard240 294B100A:P-2DL1LV Panelboard480 295B100A:P-2DR1LV Panelboard208 296B100A:P-2DR2LV Panelboard208 297B100A:P-2DR3LV Panelboard208 298B100A:P-2DRDPLV Panelboard208 299B100A:P-BDC1LV Panelboard480 300B100A:P-BDCR1LV Panelboard208 301B100A:P-BDDP1LV Panelboard480 302B100A:P-BDE1LV Panelboard480 303B100A:P-BDELVLV Panelboard208 304B100A:P-BDEQLV Panelboard480 305B100A:P-BDLS1LV Panelboard480 306B100A:P-BDLSR1LV Panelboard208 307B100A:P-BDR1LV Panelboard208 308B100A:P-BDR2LV Panelboard208 309B106:P-E1ALV Panelboard208 310B106:P-E1BLV Panelboard208 311B106:P-E1CLV Panelboard208 312B106:P-E1DLV Panelboard208 313B106:P-E2ALV Panelboard208 314B106:P-E2BLV Panelboard208 315B106:P-E2CLV Panelboard208 316B106:P-E2DLV Panelboard208 317B106:P-EKLLV Panelboard208 318B106:P-EMDPHLV Panelboard480 319B106:P-EMDPLLV Panelboard208 320B106:P-EPPH1LV Panelboard480 321B106:P-EPPH2LV Panelboard480 322B106:P-EVLV Panelboard208 323B106:P-KHLV Panelboard480 324B106:P-KLLV Panelboard208 325B106:P-L1ALV Panelboard208 326B106:P-L1BLV Panelboard208 327B106:P-L1CLV Panelboard208 328B106:P-L1DLV Panelboard208 329B106:P-L2ALV Panelboard208 330B106:P-L2BLV Panelboard208 331B106:P-L2CLV Panelboard208 332B106:P-L2DLV Panelboard208 333B106:P-MDPHLV Panelboard480 334B106:P-MDPLLV Panelboard208 335B106:P-OLLV Panelboard480 336B106:P-PPH1LV Panelboard480 337B106:P-PPH2LLV Panelboard480 338B106:P-PPH2-RLV Panelboard480 339B106:P-PPH2-RALV Panelboard240 340B106:P-PPL1LV Panelboard208 341B106:P-PPL2LV Panelboard208 342B106:P-R1ALV Panelboard208 343B106:P-R1BLV Panelboard208 344B106:P-R1CLV Panelboard208 345B106:P-R1DLV Panelboard208 346B106:P-R2ALV Panelboard208 347B106:P-R2BLV Panelboard208 348B106:P-R2CLV Panelboard208 349B106:P-R2DLV Panelboard208 350B106:SG-NLV Switchboard480 351B114:P-EMHLV Panelboard480 352B114:P-EMLLV Panelboard208 353B114:P-H2LV Panelboard480 354B114:P-H-MDPLV Panelboard480 355B114:P-LLV Panelboard208 356B114:P-UPSLV Panelboard480 357B103; P-N2L1LV Panelboard480 358B103;MC-NCMC1LV MCC480 359B103;MC-NMCC1LV MCC480 360B103;P-MDPLV Panelboard480 361B103;P-N1D1LV Panelboard208 362B103;P-N1L1LV Panelboard480 363B103;P-N1R1LV Panelboard208 364B103;P-N1R2LV Panelboard208 365B103;P-N1R3LV Panelboard208 366B103;P-N1R4LV Panelboard208 367B103;P-N2D1LV Panelboard208 368B103;P-N2D2LV Panelboard480 369B103;P-N2R1LV Panelboard208 370B103;P-N2R2LV Panelboard208 371B103;P-N2R3LV Panelboard208 372B103;P-N2R4LV Panelboard208 373B103;P-N2R5LVPanelboard208 374B103;P-NC1D1LV Panelboard480 375B103;P-NC1D2LV Panelboard208 376B103;P-NC1L1LV Panelboard480 377B103;P-NC1R1LV Panelboard208 378B103;P-NC1R2LV Panelboard208 379B103;P-NC1R3LV Panelboard208 380B103;P-NC2L1LV Panelboard480 381B103;P-NC2R1LV Panelboard208 382B103;P-NC2R2LV Panelboard208 383B103;P-NC2R3LV Panelboard208 384B103;P-NE1D1LV Panelboard480 385B103;P-NE1L1LV Panelboard480 386B103;P-NE1R1LV Panelboard208 387B103;P-NE2L1LV Panelboard480 388B103;P-NE2R1LV Panelboard208 389B103;P-NIG1LV Panelboard480 390B103A; P-CH1LV Panelboard480 391B103A; P-CH2LV Panelboard480 392B103A; P-CL1-1LV Panelboard208 393B103A; P-CL1-2LV Panelboard208 394B103A; P-CL2LV Panelboard208 395B103A; P-DP1LV Panelboard480 396B103A; P-H1ALV Panelboard480 397B103A; P-H2ALV Panelboard480 398B103A; P-L1A-1LV Panelboard208 399B103A; P-L1A-2LV Panelboard208 400B103A; P-L1B-1LV Panelboard208 401B103A; P-L1B-2LV Panelboard208 402B103A; P-L2A-1LV Panelboard208 403B103A; P-L2A-2LV Panelboard208 404B103A; P-LSH1LV Panelboard480 405B103A; P-LSL1LV Panelboard208 406B105;P-36HLV Panelboard480 407B105;P-36LLV Panelboard240 408B105;P-36PLV Panelboard240 409B120; P-MDPLV Panelboard208 410B120; P-L1LV Panelboard208 411B120; P-M1-1LV Panelboard208 412B120; P-M1-2LV Panelboard208 413B120; P-R1-1LV Panelboard208 414B120; P-R1-2LV Panelboard208 415B20;P-20L11LV Panelboard208 416B20;P-20L12LV Panelboard208 417B20;P-20L14LV Panelboard208 418B20;P-20L15LV Panelboard208 419B20;P-20MDPLV Panelboard480 420B20;P-E8PBJ1A1LV Panelboard208 421B20;P-E8PBJ1A2LV Panelboard208 422B20;P-P20L15LV Panelboard208 423B22;P-AC1LV Panelboard480 424B22;P-AC2LV Panelboard480 425B22;P-AC3LV Panelboard480 426B22;P-ACDLV Panelboard480 427B22;P-EHBLV Panelboard208 428B22;P-GENLV Panelboard208 429B22;P-H1LV Panelboard480 430B22;P-H12LV Panelboard480 431B22;P-H2LV Panelboard480 432B22;P-H3LV Panelboard480 433B22;P-HBLV Panelboard480 434B22;P-L1LV Panelboard208 435B22;P-L2LV Panelboard208 436B22;P-L3LV Panelboard208 437B22;P-LB1LV Panelboard208 438B22;P-LB2LV Panelboard208 439B22;P-MDPLV Panelboard480 440B6;P-6L11ALV Panelboard240 441B6;P-6L11BLV Panelboard240 442B6;P-6LDP-1ALV Panelboard240 443B6;P-6LDP1LV Panelboard240 444B6;P-6MDPLV Switchboard480 445B6;P-6P11LV Panelboard240 446B6;P-6PDP1LV Panelboard240 447B7;P-P1LV Panelboard240 448B7;P-P1ALV Panelboard240 449B7;P-PPLV Panelboard208 450B7;P-PPALV Panelboard208 451B8; P-1P-ALV Panelboard120 452B8; P-8PB2LV Panelboard208 453B8; P-8PB3LV Panelboard208 454B8; P-UPS1LV Panelboard208 455B8;P-1PALV Panelboard240 456B8;P-1PBLV Panelboard208 457B8;P-8L11LV Panelboard208 458B8;P-8L11ALV Panelboard208 459B8;P-8LB1LV Panelboard208 460B8;P-8PB1LV Panelboard240 461B8;P-8PBJLV Panelboard240 462B8;P-8PBJ-ALV Panelboard240 463B8;P-BL12LV Panelboard208 464B8;P-GRLV Panelboard208 465B8;P-GRALV Panelboard208 466B8;P-MACHSHOPLV Panelboard240 467B8;P-MHC26SLV Panelboard208 468B9;P-9EHDPLV Panelboard480 469B9;P-9EL23LV Panelboard208 470B9;P-9ELDPLV Panelboard208 471B9;P-9GDPLV Panelboard480 472B9;P-9HDPLV Panelboard480 473B9;P-9L11LV Panelboard208 474B9;P-9L21LV Panelboard208 475B9;P-9L22-1LV Panelboard208 476B9;P-9L22-2LV Panelboard208 477B9;P-9LDPLV Panelboard208 478B9;P-HDP2LV Panelboard480 479B9;SG-9MDPLV Switchboard480 480B9A;MC-MCC-9ALV MCC480 481B9A;MCB-9ADP1LV Panelboard480 482B9A;P-ALDPLV Panelboard208 483B9A;P-EDPLV Panelboard208 484B9A;P-EDP1LV Panelboard208 485B9A;P-EDP2LV Panelboard208 486B9A;P-ELPLV Panelboard480 487B9A;P-ELVPLV Panelboard208 488B9A;P-LPLV Panelboard480 489B9A;P-MDPLV Switchboard480 490B9A;P-PP1LV Panelboard208 491B9A;P-PP2LV Panelboard208 492B9A;P-PP3LV Panelboard208 493BT25;P-MSPP1LV Panelboard208 494BT25;P-MSPP2LV Panelboard208 495BT34;P-T34ALV Panelboard208 496BT34;P-T34BLV Panelboard208 497BT36;P-36P1LV Panelboard480 498BT36;P-36P2LV Panelboard208 ATTACHMENT # 1 TRANSFORMERS NameVoltage PriVoltage SecKVA 1B100:T-148024010.0 2B100:T-150A12081205.0 3B100:T-150B22081205.0 4B100:T-150C32081205.0 5B100:T-164A12081205.0 6B100:T-164B22081205.0 7B100:T-164C32081205.0 8B100:T-166A12081205.0 9B100:T-166B22081205.0 10B100:T-166C32081205.0 11B100:T-168A12081205.0 12B100:T-168B2081205.0 13B100:T-168B2R2081205.0 14B100:T-168C32081205.0 15B100:T-169A12081205.0 16B100:T-169B22081205.0 17B100:T-169C32081205.0 18B100:T-1C90480480150.0 19B100:T-1R1248020830.0 20B100:T-1R13-15A480208300.0 21B100:T-1R1-448020875.0 22B100:T-1R16,1748020845.0 23B100:T-1R18-22480208112.5 24B100:T-1R5-848020875.0 25B100:T-1R9-1148020875.0 26B100:T-2R1,2,348020830.0 27B100:T-2R4,5,648020845.0 28B100:T-2R7,848020845.0 29B100:T-2WRDP480208112.5 30B100:T-3ED148020815.0 31B100:T-3R1,2,348020845.0 32B100:T-3R4,5,648020845.0 33B100:T-3R7-1048020875.0 34B100:T-3WD148020815.0 35B100:T-4R1,2,348020845.0 36B100:T-4R4,5,648020845.0 37B100:T-4R7,8,948020875.0 38B100:T-5R1-448020845.0 39B100:T-5R5,6,748020845.0 40B100:T-BDP10A48020825.0 41B100:T-BDP10D48020825.0 42B100:T-BME48020845.0 43B100:T-BPR148020815.0 44B100:T-BR1,2,348020845.0 45B100:T-BR1048020830.0 46B100:T-BR1348020830.0 47B100:T-BR4,5,648020875.0 48B100:T-BR7,8,948020875.0 49B100:T-C1R1,248020830.0 50B100:T-C1R3,448020830.0 51B100:T-C2R1,2,3480208112.5 52B100:T-C2R4,5480208112.5 53B100:T-C2W148020845.0 54B100:T-C3R148020815.0 55B100:T-C4R1,248020875.0 56B100:T-C4R3,448020875.0 57B100:T-C5R1,248020830.0 58B100:T-CATHLAB48024025.0 59B100:T-DB148020815.0 60B100:T-E1R1,2,448020875.0 61B100:T-E1R16A48020830.0 62B100:T-E1R348020830.0 63B100:T-E1R848020830.0 64B100:T-E1RS48020830.0 65B100:T-E2R1,248020830.0 66B100:T-E2WD148020875.0 67B100:T-E3R1,248020830.0 68B100:T-E4R1,248020830.0 69B100:T-E4WR1,248020875.0 70B100:T-E5R1,248020830.0 71B100:T-EBDP7A480208300.0 72B100:T-EBDP9B48020875.0 73B100:T-EBPR148020815.0 74B100:T-EBR1,248020830.0 75B100:T-EBR1048020875.0 76B100:T-EQBC48020830.0 77B100:T-LS1R148020815.0 78B100:T-LS2R148020815.0 79B100:T-LS3R148020815.0 80B100:T-LS4R148020815.0 81B100:T-LS5R148020815.0 82B100:T-LSBR148020815.0 83B100:T-LSGR248020815.0 84B100:T-PS4R14802086.0 85B100:T-RL12082407.5 86B100:T-RL248020875.0 87B100:T-RP1,248020875.0 88B100A:T-1DLSR148020815.0 89B100A:T-1DT1480208112.5 90B100A:T-2DCR148020875.0 91B100A:T-2DCR220824015.0 92B100A:T-2DRDP480208112.5 93B100A:T-BDCR148020830.0 94B100A:T-BDELV48020815.0 95B100A:T-BDLSR148020815.0 96B100A:T-BDT148020845.0 97B100A:T-BDT2480208112.5 98B103:T-N1D1480208225.0 99B103:T-NC1D248020875.0 100B103:T-NE1R148020830.0 101B103A:T-CL148020845.0 102B103A:T-CL248020845.0 103B103A:T-L1A48020875.0 104B103A:T-L2A48020845.0 105B103A:T-LSL148020815.0 106B105:T-36L48024015.0 107B105:T-36P48024030.0 108B106:T-EMDPL48020875.0 109B106:T-EV4802089.0 110B106:T-MDPL480208500.0 111B106:T-PPH2-RA48024010.0 112B106:T-PPL14802089.0 113B106:T-PPL24802089.0 114B114:T-EML48020815.0 115B114:T-L48020875.0 116B20:T-20-1480208112.5 117B20:T-E8PBJ1A12402085.0 118B20:T-E8PBJ1A22402085.0 119B20:T-20L1548020830.0 120B22:T-LB1480208112.5 121B6:T-6LDP1480240167.0 122B6:T-6PDP1480240150.0 123B7:T-PP24020845.0 124B8:T-1P-A-12401205.0 125B8:T-8LB124020815.0 126B8:T-8PB2240208112.5 127B8:T-GR,GRA24020875.0 128B8:T-MHC265S2402089.0 129B9:T-9L2148020845.0 130B9:T-9EL2348020830.0 131B9:T-9L2248020830.0 132B9:T-9LDP480208112.5 133B9:T-T9ELDP48020845.0 134B9A:T-A-LDP480208225.0 135B9A:T-EDP48020845.0 136B9A:T-EDP148020845.0 137BT36:T-36P248020875.0 ? ATTACHMENT # 1 ATS Name 1B8;A-1 2B22;A-TS1 3B22;MTS-P1 4B103;A-C 5B103;A-E 6B103A; LSATS 7B103A; CATS 8B106:A-1 9B106:A-FP 10B100:ATS-1 11B100:ATS-2 12B100:ATS-3 13B100:ATS-4 14B100:ATS-5 15B100:ATS-6 16B100:ATS-7 17B100:ATS-8 18B100:ATS-9 19B9; 9ATS1 20B9; 9ATS2 21B9A;A-2 22B9A;A-3 END
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/CSCVAMC/WJBDDVAMC/VA24716R0196/listing.html)
 
Document(s)
Attachment
 
File Name: VA247-16-R-0196 VA247-16-R-0196_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2490075&FileName=VA247-16-R-0196-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2490075&FileName=VA247-16-R-0196-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: DORN VA MEDICAL CENTER;6439 GARNERS FERRY ROAD;COLUMBIA, SC 29209
Zip Code: 29209
 
Record
SN03982278-W 20160106/160104234226-3c831d0b93306cd9943faea00b9419de (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.