Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 09, 2016 FBO #5160
SPECIAL NOTICE

56 -- Industry Day Announcement

Notice Date
1/7/2016
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Architect of the Capitol, AOC Acquisition & Material Management Division, Acquisition and Material Management Division, Ford House Office Building, Second and D Streets, S.W., Washington, District of Columbia, 20515, United States
 
ZIP Code
20515
 
Solicitation Number
HB09037
 
Point of Contact
Falvasha Alghussain, Phone: 2022261941
 
E-Mail Address
falghuss@aoc.gov
(falghuss@aoc.gov)
 
Small Business Set-Aside
N/A
 
Description
The Architect of the Capitol (AOC) is hosting an Industry Day for the Rayburn Garage Rehabilitation Project on January 25, 2016, from 1 p.m. to 2 p.m. at the U.S. Capitol Visitors Center in the Congressional Meeting Room - South. This event is for businesses interested in working on projects with the AOC and is designed to provide information about doing business with the AOC. The Industry Day is free and open to any business and reservations are recommended by January 22, 2016 at 5PM. Please e-mail aocprocurement@aoc.gov if you would like to attend. (You do not need to be present to submit for this contract.) The AOC is responsible for the maintenance, operation, development, and preservation of 17.4 million square feet of buildings and more than 553 acres of land throughout the U.S. Capitol complex in Washington, DC. The AOC has a need to maintain and repair the buildings, building structures and grounds of the U.S. Capitol complex; conserve and repair historical objects and artwork; and support the overall functions of the AOC as a Legislative Branch agency. The work of this upcoming contract is the rehabilitation of the Rayburn House Office Building Garage which is a five story, below grade, interior garage structure with a gross area of approximately 924,300SF. The construction will be conducted in four phases, with phase one as the base-bid and phases 2, 3 and 4 as options, including the plaza level above phase 1. Construction will commence in 2016 and will be completed in 2021. The parking garage slab structure was designed to utilize electric powered hydro-demolition process to mitigate dust, extreme noise conditions. Rehabilitation will also include the replacement of electrical system, electrical lighting, sprinkler system, fire alarm system, plumbing system and mechanical ventilation system.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/AOC/AOCPD/WashingtonDC/HB09037/listing.html)
 
Place of Performance
Address: INDUSTRY DAY WILL BE HELD IN: U.S. Capitol Visitors Center in the Congressional Meeting Room - South, Washington, District of Columbia, 20515, United States
Zip Code: 20515
 
Record
SN03985313-W 20160109/160107234433-d2ee1f6ae556efa0f5acc76da9335407 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.