Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 15, 2016 FBO #5166
SOURCES SOUGHT

A -- Quality Assurance Essentials and Case Studies for Accelerated Bridge Construction - Sources Sought

Notice Date
1/13/2016
 
Notice Type
Sources Sought
 
NAICS
541330 — Engineering Services
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Office of Acquisition and Grants Management, Mail Stop E62-204, 1200 New Jersey Avenue, SE, Washington, District of Columbia, 20590, United States
 
ZIP Code
20590
 
Solicitation Number
DTFH6116RI00005
 
Archive Date
2/6/2016
 
Point of Contact
Tamiko Aikens, Phone: 2023663092
 
E-Mail Address
tamiko.aikens@dot.gov
(tamiko.aikens@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
The overall objective is to determine the effectiveness of State Highway Agencies (SHA) QA practices utilized on ABC projects. A thorough literature review of states QA practices for bridge construction projects shall be included. A minimum of 5 case studies with each case study consist of an individual project with varying levels of complexities and in regional geographical areas of the United States will be documented to illustrate the effectiveness, best practices and/or issues of the existing Quality Assurance practices utilized on ABC projects. The effective practices are those in place to reduce the risk of non-specification material in and high quality proper installation and “fit up” processes for structural precast concrete elements. From the cases a QA guidance document will be produced for states to develop a more robust inspection and acceptance programs for ABC projects. In addition, to this QA guidance document a manual will be developed as a Visual ABC Inspection Manual similar to the Long Term Pavement Performance (LTPP) Pavement Distress Identification Manual. The overall objective is to determine the effectiveness of State Highway Agencies (SHA) QA practices utilized on ABC projects. A thorough literature review of states QA practices for bridge construction projects shall be included. A minimum of 5 case studies with each case study consist of an individual project with varying levels of complexities and in regional geographical areas of the United States will be documented to illustrate the effectiveness, best practices and/or issues of the existing Quality Assurance practices utilized on ABC projects. The effective practices are those in place to reduce the risk of non-specification material in and high quality proper installation and "fit up" processes for structural precast concrete elements. From the cases a QA guidance document will be produced for states to develop a more robust inspection and acceptance programs for ABC projects. In addition, to this QA guidance document a manual will be developed as a Visual ABC Inspection Manual similar to the Long Term Pavement Performance (LTPP) Pavement Distress Identification Manual.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/OAM/DTFH6116RI00005/listing.html)
 
Record
SN03990545-W 20160115/160113234830-f5db38fa734b03b3e2e875abcb696537 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.