Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 24, 2016 FBO #5175
MODIFICATION

Z -- Contaminated Soil Removal Project

Notice Date
1/22/2016
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
 
ZIP Code
94303
 
Solicitation Number
SLAC_Soil_Remediation
 
Archive Date
2/19/2016
 
Point of Contact
James S. Yturralde, Phone: 6509263860
 
E-Mail Address
jamesy@slac.stanford.edu
(jamesy@slac.stanford.edu)
 
Small Business Set-Aside
N/A
 
Description
SLAC National Accelerator Laboratory (SLAC) is seeking sources for the following project. The planned acquisition will result in the award of a subcontract to remove a total of approximately 1300 cubic yards of contaminated soil at six Miscellaneous Soil Sites (MSSs) at SLAC. The requirements call for investigation and remediation of chemical and radiologic impacts to soil and groundwater resulting from SLAC operations, including historical spills and releases, which have occurred within SLAC. Chemicals of potential concern, or COPCs in these MSSs were identified in Remedial Investigation Reports (RIs) and confirmed in Baseline Risk Assessments (BRAs). The identified COPCs for soil in the MSSs includes polychlorinated biphenyls (PCBs), polycyclic aromatic hydrocarbons (PAHs), Lead, Copper and Zinc. Responsibilities The Subcontractor shall be responsible for preparation, planning, scheduling, managing, and safely implementing the following: · a Storm Water Pollution Protection Plan (SWPPP); · a project specific health and safety plan (HSP), including traffic plan · completion of SLAC provided facility specific training · proof of OSHA-40 Hour Hazwoper and OSHA construction training (i.e., competent person) · soil excavation, transport to staging areas, and loading of SLAC-provided trucks or bins for loadout; · protection of trees during excavation activities · stockpile management, if need; · imported fill procurement, testing, delivery, and placement; · dust control; Schedule The RFP for this work will be issued in April 2016 with start of work in June 2016. This is not a Request for Proposal or solicitation. Interested suppliers are instructed to register through the Interested Vendor tab of this posting.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/SLAC_Soil_Remediation/listing.html)
 
Place of Performance
Address: 2575 Sand Hill Road, Menlo Park, California, 94025, United States
Zip Code: 94025
 
Record
SN03999054-W 20160124/160122234152-a78e64d1f4ddadda8e194caaccaca535 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.