SOLICITATION NOTICE
Z -- Replace and Improve Roof Cover and Rainwater Drainage Systems, U.S. Courthouse, Asheville, NC
- Notice Date
- 2/26/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- Public Buildings Service (PBS) - Acquisition Services Division (PGQC)
- ZIP Code
- 00000
- Solicitation Number
- GS-04-P-16-EX-C-7030
- Response Due
- 3/8/2016
- Archive Date
- 4/7/2016
- Point of Contact
- William Peterson
- E-Mail Address
-
Email
(william.peterson@gsa.gov)
- Small Business Set-Aside
- N/A
- Description
- Solicitation Number GS-04P-15-EX-C-0186 This project involves the design, repair, replacement and improvement of the roof cover systems and rainwater drainage systems at the Historic U.S. Courthouse, 100 Otis Street, Asheville, NC 28801. The existing low-slope roof cover involves twelve separate roof areas totaling approximately 13,000 square feet. The low-slope roof cover consists of ballasted single-ply EPDM membrane over light weight insulating (cinder) concrete and structural concrete decks. However, the sally port roof involves rigid board insulation and metal decking, in addition to the EPDM membrane. The steep slope roof cover involves approximately 15,000 square feet of standing seam metal roof membranes over the attic and approximately 1,500 square feet of contiguous gutters. Both roof cover systems include EPDM base flashing; metal counterflashing; concrete parapet copings; internal rain leaders and conductors; and associated sealants. The Designer-Builder shall design and construct appropriate repairs, replacements and improvements of these roof cover and rainwater drainage systems. New low-slope roof membranes are limited to multi-layer atactic polyproylene (APP) or styrene butadiene styrene (SBS) modified bitumen roofing systems with highly reflective surfaces. New gutter membranes are limited to fluid-applied aliphatic polyurethane and polymethylmethacrylate (PMMA) waterproofing. Section 4 of this statement of work provides additional requirements for these new systems and components. The Designer-Builder shall also provide a web-camera surveillance system to monitor on-site work progress through project completion.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/86bb9a17cc247a7943574ab3af3c39f9)
- Record
- SN04032831-W 20160228/160226234652-86bb9a17cc247a7943574ab3af3c39f9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |