Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 28, 2016 FBO #5210
SOLICITATION NOTICE

Z -- Replace and Improve Roof Cover and Rainwater Drainage Systems, U.S. Courthouse, Asheville, NC

Notice Date
2/26/2016
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238160 — Roofing Contractors
 
Contracting Office
Public Buildings Service (PBS) - Acquisition Services Division (PGQC)
 
ZIP Code
00000
 
Solicitation Number
GS-04-P-16-EX-C-7030
 
Response Due
3/8/2016
 
Archive Date
4/7/2016
 
Point of Contact
William Peterson
 
E-Mail Address
Email
(william.peterson@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
Solicitation Number GS-04P-15-EX-C-0186 This project involves the design, repair, replacement and improvement of the roof cover systems and rainwater drainage systems at the Historic U.S. Courthouse, 100 Otis Street, Asheville, NC 28801. The existing low-slope roof cover involves twelve separate roof areas totaling approximately 13,000 square feet. The low-slope roof cover consists of ballasted single-ply EPDM membrane over light weight insulating (cinder) concrete and structural concrete decks. However, the sally port roof involves rigid board insulation and metal decking, in addition to the EPDM membrane. The steep slope roof cover involves approximately 15,000 square feet of standing seam metal roof membranes over the attic and approximately 1,500 square feet of contiguous gutters. Both roof cover systems include EPDM base flashing; metal counterflashing; concrete parapet copings; internal rain leaders and conductors; and associated sealants. The Designer-Builder shall design and construct appropriate repairs, replacements and improvements of these roof cover and rainwater drainage systems. New low-slope roof membranes are limited to multi-layer atactic polyproylene (APP) or styrene butadiene styrene (SBS) modified bitumen roofing systems with highly reflective surfaces. New gutter membranes are limited to fluid-applied aliphatic polyurethane and polymethylmethacrylate (PMMA) waterproofing. Section 4 of this statement of work provides additional requirements for these new systems and components. The Designer-Builder shall also provide a web-camera surveillance system to monitor on-site work progress through project completion.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/86bb9a17cc247a7943574ab3af3c39f9)
 
Record
SN04032831-W 20160228/160226234652-86bb9a17cc247a7943574ab3af3c39f9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.