MODIFICATION
16 -- Floorboard Assemblies Overhaul Services
- Notice Date
- 2/29/2016
- Notice Type
- Modification/Amendment
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- Department of Homeland Security, United States Coast Guard (USCG), Commanding Officer, USCG Aviation Logistics Center, MRS, SRR, MRR, LRS, ESD, IOD, ISD, or ALD, Elizabeth City, North Carolina, 27909-5001, United States
- ZIP Code
- 27909-5001
- Solicitation Number
- HSCG38-16-R-J00006
- Archive Date
- 3/18/2016
- Point of Contact
- Monique Swinson, Phone: 252-384-7144, Tony Twiddy, Phone: 252-335-6494
- E-Mail Address
-
monique.swinson@uscg.mil, Tony.R.Twiddy@uscg.mil
(monique.swinson@uscg.mil, Tony.R.Twiddy@uscg.mil)
- Small Business Set-Aside
- N/A
- Description
- Question 1 Section 5.0 Parts listed in Solicitation to be provided upon request. NSN: 2510-01-HS2-7761 PN: 70219-02119-107 PAN NSN: 4320-01-HS1-5331 PN: 975-553-89-2 PAN NSN: 1560-01-HS1-5554 PN: FDC-3100M30 TIE DOWN FITTING NSN: 5340-01-HS2-8407 PN: 70204-82016-136 PLATE NSN: U/K PN: FDC-1495-2 PAD EYE NSN: U/K PN: H165-1-051-1000 LATCH ASSY. (Are these required?) NSN: U/K PN: 70204-82004-052/-054 INSERT ASSY. (Are these required?) Answer 1: Yes, both the Latch Assy and the Insert Assy are required. These are to be replaced if corroded or damaged. Question 2: In addition to the parts listed in solicitation would the USCG consider supplying the following hardware if required? Hardware specifically made by the Coast Guard and difficult to procure hardware. Answer 2 : No. After contract award the Government may negotiate consideration for supplying additional parts. NSN: 4940-01-343-6186 PN: 70219-02555-104 PAN NSN: 1560-01-095-7340 PN: 70219-02554-042 RING ASSY. NSN: 1560-01-100-8283 PN: 70219-02554-103 STUD, CARGO NSN: 1560-01-219-6818 PN: 70214-02556-118 KEEPER NSN: 5325-01-117-7452 PN: 70219-02554-105 STUD, SEAT NSN: 1560-01-344-7766 PN: 70219-02555-135 PAN NSN: 1560-01-HS1-6287 PN: 2190226-1 INSERT TALL NSN: 1560-01-HS1-6286 PN: 2190226-2 INSERT SHORT Question 3 Factor 2: Past Performance If the contractor intends and completes 100% of the work at their facility, do they need to submit a subcontracting plan? Answer 3: Yes. However please see response to Question 4. Question 4 In FAR 19.702(b)(3) it says subcontracting plans are not required for contracts completed entirely outside the United States. Does the requirement in the solicitation override the FAR 19.702(b)(3). Answer 4: No. If the work is completed outside the US, no subcontracting plan is required. Contractor must assert an exception in their proposal. Question 5: Would it be possible for you to provide a two week extension to the due date for responses? Answer 5: No extensions will be granted.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DHS/USCG/USCGARSC/HSCG38-16-R-J00006/listing.html)
- Place of Performance
- Address: Contractor's Facility, United States
- Record
- SN04033855-W 20160302/160229234622-1314b52ac6db8e8b5576850ea75da05d (fbodaily.com)