Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 02, 2016 FBO #5213
DOCUMENT

J -- 60 Ton Condensing Unit - Attachment

Notice Date
2/29/2016
 
Notice Type
Attachment
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of Veterans Affairs;James J. Peters VA Medical Center;Network Contracting Office 3 (10N3NCO);130 West Kingsbridge Road;Bronx NY 10468-3904
 
ZIP Code
10468-3904
 
Solicitation Number
VA24316Q0376
 
Response Due
3/15/2016
 
Archive Date
5/14/2016
 
Point of Contact
Delfo R. Saco-mizhquiri
 
Small Business Set-Aside
Total Small Business
 
Description
STATEMENT OF WORK (SOW) A.GENERAL INFORMATION 1.Title of Project: 60 Ton Carrier Condensing unit 2.Scope of Work: a.Contractor must be responsible for supply, delivery and placement of one (1) 60 Ton Carrier condensing unit. The condensing unit must be brand name or equal to model 38AH-064 460v/3ph/60hz. This is a one for one replacement. b.Rigging: "Crane and rigging services are required to remove existing condensing unit and lift and place the new one (1) 60 Ton Carrier condensing unit onto the existing platform located outside of Building 200. "Site management to be performed by contractor to ensure all any OSHA, VA and local safety guidelines are followed. "Disposal of old condensing unit. c.Warranty: One year warranty on the new 60 Ton Carrier Condensing unit and, at a minimum, a 5 year warranty on the unit's compressors. 3.Performance Period: Upon award of the contract, the contractor is responsible for confirming site requirements and ordering the unit within 7 business days. The delivery and placement of the new condensing unit shall be done after regular hours or during the work week. The work should not exceed one business day. 4.Place of Performance: Department of Veterans Affairs Northport VA Medical Center 79 Middleville Road, Building 200 Northport NY. 11768 B.GENERAL REQUIREMENTS 1.Upon delivery and placement of one (1) 60 Ton Carrier condensing unit, the condensing unit shall be inspected by the Mechanical Shop Supervisor, Michael Romero. 2.Report of acceptance of delivery. Copy of report shall be submitted to the Mechanical Shop Supervisor. 3.Inspections shall be coordinated with the Mechanical Shop Supervisor. 4.Vendor shall show valid ID at police check point for access to the facility's repair site. 5.All employees on the job site are required to have the proper OSHA construction certifications.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/BroVANAP/VAMD/VA24316Q0376/listing.html)
 
Document(s)
Attachment
 
File Name: VA243-16-Q-0376 VA243-16-Q-0376_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2586333&FileName=VA243-16-Q-0376-000.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=2586333&FileName=VA243-16-Q-0376-000.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Department of Veterans Affairs;Northport VA Medical Center;79 Middleville Road, Building 200;Northport NY.
Zip Code: 11768
 
Record
SN04033893-W 20160302/160229234651-211f01c51923e37eda54f7ce40f05e9f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.