SOLICITATION NOTICE
38 -- REPAIR ROOF, MULTI-FAC B355 & 1358 - Solicitation- W90VN6-16-R-0004
- Notice Date
- 3/8/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238160
— Roofing Contractors
- Contracting Office
- Department of the Army, Army Contracting Command, ECC, 411TH CSB (W90VN6) RCO OSAN, Unit #15289, APO, Non-U.S., 96205-5289, Korea, South
- ZIP Code
- 00000
- Solicitation Number
- W90VN6-16-R-0004
- Archive Date
- 4/15/2016
- Point of Contact
- Daymeion G. Brantley, Phone: 7845893
- E-Mail Address
-
daymeion.g.brantley.mil@mail.mil
(daymeion.g.brantley.mil@mail.mil)
- Small Business Set-Aside
- N/A
- Description
- Solicitation CONTRACT NUMBER: W91QVN-12-D-0077/78 PROJECT NUMBER: SMYU 16-1044 DESCRIPTION: REPAIR ROOFS, MULTI-FAC B355, B1358 RA POC: 51st CES (CHOE, HANG SOK 784-5706) STATEMENT OF WORK DATED: 10 SEP 15 1. GENERAL: The work to be performed for completion of this project shall be in general as described below and executed by the contractor. 1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications. 1.2 Work by In-House Forces: N/A 1.3 Work by Troop labor: N/A 2. TECHNICAL SPECIFICATIONS: Above project shall comply with specifications in awarded original contract package. 3. SCOPE OF WORKS (SOW): a. Architectural Works: BLDG 355 1. Provide double pipe scaffolding around the buildings for temporary works incl. fabricating and dismantling. 2. Remove existing asphalt shingle roofing system incl. insulation, rotten roof sheathing, flashing, fascia, soffit boards. 3. Remove existing rain gutters and downspouts. 4. Install new protected metal sheet roof system incl. protected metal sheet, roof sheathing, wooden purlins (@4'-0" O.C.) with thermal spacer blocks, batt insulations with vapor barriers, metal flashings, metal fascia/soffit panels, and drip edges. 5. Install new rain gutters and downspouts incl. concrete splash blocks. 6. Remove all construction debris originated from this project and clean up the job site. 7. Repair all damages to existing areas caused by this project and to match condition to adjacent areas. BLDG 1358 1. Provide double pipe scaffolding around the building for temporary works incl. fabricating and dismantling 2. Remove existing entire metal roof system such as roof panels, insulation, flashings, drip edges, rain gutters and downspouts. 3. Install roof sheathing, wooden purlins with thermal spacer blocks and additional metal frames (if necessary) such as rafters/purlins using welding to attach on the existing roof structures. 4. Install new protected metal roof panels, roof liner (if necessary), purlins and batt insulations on the roof frame. 5. Install new flashings, drip edges, fascia, soffit, rain gutters and 9 sets of downspout with splash blocks. 6. Remove all construction debris originated from this project and clean up the job site. 7. Repair all damages to existing areas caused by this project and to match condition to adjacent areas. 4. ATTACHED DRAWING OR SKETCH OR PICTURES: Yes 5. CONTRACT PERFORMANCE PERIOD: 120 calendar days ARO 6. OTHERS: N/A 7. ATTACHED CLIN ITEMS INCL. COST (IGCE): Yes 8. REMARKS: This is the ROK LCS funded project. So, all of the construction materials used in this project shall be local ones complying with specification in awarded original contract package since ROK LCS Funds shall not to be used to purchase off-shore end products.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/69a2f2d901d4e6a3c2cca4f46360bb17)
- Place of Performance
- Address: 411th Contracting Support BDE, Korea, RCO Osan, Unit #2039, APO, AP 96278, Osan AB, Non-U.S., 96278, Korea, South
- Record
- SN04044087-W 20160310/160309000254-69a2f2d901d4e6a3c2cca4f46360bb17 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |