SOLICITATION NOTICE
R -- AEROBICS INSTRUCTOR - SOW
- Notice Date
- 3/9/2016
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 611620
— Sports and Recreation Instruction
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, Tinker AFB - AFSC/PZIO, 7858 5th Street Ste 1, Tinker AFB, Oklahoma, 73145-9106, United States
- ZIP Code
- 73145-9106
- Solicitation Number
- F3Y0AK5344A001
- Archive Date
- 4/8/2016
- Point of Contact
- Megan Rippinger, Phone: 4057393519
- E-Mail Address
-
megan.rippinger@us.af.mil
(megan.rippinger@us.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Statement of Work for Aerobics Instructor *****THIS REQUIREMENT IS 100% SMALL BUSINESS SET-ASIDE***** Please provide a Monthly Firm Fixed Price quote that will incorporate any combination of the classes described in paragraph 2 of the SOW. The implementation plan should also include a proposed monthly schedule of classes that incorporate a combination of classes specified in the SOW, along with the number of employees that will be committed to this contract as well as all of their certifications. STATEMENT OF WORK 1.SERVICES NON-PERSONNEL: To furnish all labor, transportation, andincidentals as necessary to provide the Gerrity Sports & Fitness Center Aerobic Instructional Services in accordance with task identified herein. Period of Performance: FY 2016 2.INSTRUCTOR TERMS: Contractor shall teach classes as scheduled by theFitness Center Director from the following: low impact, mid impact, high impact, step, floor aerobic, yoga, kick boxing, Pilates, circuit training, turbo kick, cardio party, power pump, spinning, Zumba and strength, water aerobics, etc., classes. Instructor shall teach methods that provide aerobic fitness to individuals with beginner, intermediate, and moderate fitness levels. Personal assistance and corrective techniques will be provided before and during classes. Contractor shall provide preparation to include musical device setup and ensure musical device has been secured after use. Contractor shall ensure classes taught as part of AF Fitness Program meet requirements as establish by Health and Wellness Center (HAWC) and Fitness Center Director (FCD). Contractor shall provide FCD with daily attendance sheet for each class detailing number of participants and status (Active Duty Air Force or Other).. The contractor shall furnish all labor transportation, tools and incidentals as necessary to provide service. Re-performance of service shall be administered for any missed classes or contracted service as stated in the FY 16' awarded contract by vendor to customer w/in three (3) business days as stated in the QASP. 3.CERTIFICATION: Applicant shall be knowledgeable regarding current fitness and exercise techniques and have a current certification in one of the nationally recognized fitness agencies or authorized substitute. Copy of certification(s) and CPR certificate(s) shall be submitted at time of proposal. Instructors shall have current CPR certification. 4.PERFORMANCE: Contractor shall be courteous, use constructive criticism, andnever insult class participants; and shall be able to explain, demonstrate, and perform all aerobic exercises being taught. Contractor shall stay up to date on all new aerobic moves and guarantee a variety of routines, and must be proficient in and familiar with hand held exercise equipment( dumbbells, body bars, exercise balls, steps w/ risers, barbells, exercise bands, etc.). 5.QUARTERLY MEETINGS: Contractor shall meet with Fitness Center Director orhis/her representative to discuss/review the status of Aerobic Class and exchange feedback for remaining period. 6.DATE and TIMES: Classes are to be offered 15 times per week Monday - Friday as scheduled and coordinated with the Contractor by the FCD at the Gerrity Sports & Fitness Center. Instructor shall be prepared for class 10 minutes prior. Classes will not be offered on federal holidays. Contractor may be required to provide Aerobic instructions at an alternate site, located on TAFB. Sessions maybe canceled by Gov't on an individual basis 24 hours in advance of the scheduled class. Classes may be re-arranged by the request of the POC from 72 FSS/FSR during the time frames of 0700-0800, 0900-1000, 1000-1100, 1200-1300, 1300-1400, 1500-1600 and 1600-1700. 7.COST of CLASS: There will be no charge for classes. Mandatory participantswill have priority. Contractor shall submit accurate invoice within 5 working days following last day previous month to the Fitness Center Director or Fitness Director. 8.COORDINATION REQUIREMENTS: Contractor may be required to coordinateactivities with Fitness Center Director or his/her representative. Contractor may be required to work with other Aerobic Instructors or Fitness Center Director or his/her representative or Fitness Center Staff in the performance of this statement of work. 9.CLASS FORMAT: Class format will be followed and instructor shall encourageheart rate monitor use when needed. Classes designated for AF Fitness Program must meet guidelines and standards established by HAWC and Fitness Center Director. a.Aerobic Phase: Low impact aerobic activity sufficient to keep participants' heartrate within their Training Heart Rate Zone. Aerobic phase will last at least 30 minutes but not exceed 40 minutes. b.Cool Down: A gradual cool down that allows participants the ability to return totheir pre- exercise exertion levels i.e. "conversation exercise". Cool down should last 6-8 minutes followed by 7-9 minutes of stretching. Class format for AF Fitness Program classes: a.Warm-up: A gradual warm-up that allows body to prepare for the stress ofexercise by increasing blood flow, muscle temperature and must include stretching for major muscle groups. b.Cardiovascular Phase: Cardiovascular phase will be sufficient enough to ensureparticipants heart rates are within 70-85% of maximum heart rate. Instructor must prompt participants to check heart rate every 10-15 minutes. Cardiovascular phase shall be between 30-40 minutes, rhythmic in nature, continuous and involve large muscle groups. c.Strength Phase: Last 15-20 minutes, include at a minimum, 1 set of 8-12repetitions of exercises or movements that involve all major muscle groups. d.Cool Down: A gradual cool down that allows participants the ability to return topre-exercise exertion levels where "conversation exercise" is established and includes 7-9 minutes of stretching. 10.EQUIPMENT SUPPLIED BY CONTRACTOR: Aerobic music. 11.EQUIPMENT SUPPLIED BY GOVERNMENT: Sound system, steps, bands,hand weights, balls. 12.WORK SCHEDULES: Monthly work schedule will be submitted to FitnessCenter Director or his/her representative no later than the 3rd of each month for the following month. Contractor is to ensure all classes and times are covered with qualified aerobic instructors as described here within. Contractor shall always have backup instructor on call should the scheduled instructor fail to show for the class. 13.INSPECTION and ACCEPTANCE of SERVICES: Aerobics instructors will bemonitored on a daily basis for compliance with responsibilities detailed within statement of work. Such as: a.Present and on time b.Uses equipment properly c.Follows class format d.Provides point of contact e.Submits accurate invoices on time f.Certified by national or authorized organization g.Meets ALL terms of statement of work not specified above 14.SERVICE DELIVERY SUMMARY. (SDS) SDS Number SOW Paragraph Performance Objective Performance Threshold SDS #1 2 Labor transportation and incidentals 100% Compliance SDS #2 2 Instruct aerobic classes 100% Compliance SDS #3 3 Nationally certified and CPR certified instructors 100% Compliance SDS # 4 2 Daily attendance sheets with class format 100% Compliance FOR AEROBIC INSTRUCTORS (CONTRACTORS) 15.SURVEILLANCE: Items that require inspection will be periodically monitoredafter completion of work to assure that the required service has been accomplished IAW the contract. ******************************************************************************************** QUALITY ASSURANCE SURVEILLANCE PLAN FOR AEROBICS INSTRUCTOR This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate Contractor actions while implementing this Statement of Work (SOW). It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Service Delivery Summary (SDS). The QASP provides a systematic method to evaluate the services the Contractor is required to furnish and not the details of how the Contractor accomplishes the work. This QASP is based on the premise that the Government desires to maintain a quality standard in providing Aerobic Instruction. A service contract to provide this service is the best means of achieving this goal for Fitness Center Customers. The Government retains the right to inspect any item included in the contract, including tasks not shown on the SDS. These services should be inspected in the same general manner as periodic surveillance items. The results of these inspections are documented and, if necessary, provided to the Contracting Officer (CO) for action. Should a discrepancy be observed, the CO will handle each documented discrepancy on a case-by-case basis. The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. Good management and use of an adequate control plan will allow the contractor to operate within specified performance requirements. The role of the Government is quality assurance to ensure contract standards are achieved. In this contract, the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a "self-correcting" contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success. Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.SDS Number and Performance Objective SOW Paragraph Performance Threshold Remedy Method of Surveillance SDS# 1 The contractor shall furnish all labor transportation and incidentals as necessary to provide service 2 periodically Inspected Re-performance within given time listed in the statement of work Visual Inspection of all services SDS# 2 The contractor shall instruct aerobic classes (group exercises classes) 2 periodically Inspected Re-performance within given time listed in the statement of work Visual Inspection of all services SDS# 3 The contractor shall provide nationally certified (fitness agency) and cpr certified instructors 3 periodically Inspected Re-performance within given time listed in the statement of work Visual Inspection of all services SDS#4 The contractor shall provide FCD with daily attendance sheet identifying Active Duty and other 2 periodically Inspected Re-performance within given time listed in the statement of work Visual Inspection of all services Procedures The government Quality Assurance Personnel (QAP) will perform inspections to ensure contractor compliance with the appropriate paragraphs of the SOW and will record the results of inspection, noting the date and time of inspection. If inspection indicates unacceptable performance, the QAP will notify the contractor of the deficiencies for correction. The contractor shall be given a reasonable time (3 DAYS) after notification to correct the unacceptable performance if such correction is possible. The length of time allowed to correct the problem will depend upon the requirement and the deficiency. The contractor will be notified of the time allowed for correction when the deficiency is reported to the contractor. The QAP will inspect and accept contractor services at the completion of each contract payment period. The QAP will certify services actually received under this contract via DD Form 250, a letter to the C O, and or contractor's invoice. Date/time of surveillance:_____________________ SDS#(s)______________________._______________________________________________________________________ Location:_________________________________________________________________ RESULTS OF SURVEILLANCE & /OR CORRECTIVE ACTION TO BE TAKEN (IF ANY):._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________._______________________________________________________________________. __________________________ ________________________________ NAME/TITLE OF QAP (Signature). Methods of Surveillance: Periodic Inspection: Inspecting all requirements as stated in the contract on a periodic basis as determined by the Fitness Center Director to ensure services are being performed correctly and in a timely manner as stated in the FY16' SOW. ***************************************************************** THIS IS 100% SMALL BUSINESS SET ASIDE
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCBC/F3Y0AK5344A001/listing.html)
- Place of Performance
- Address: GERRITY FITNESS CENTER, TINKER AFB, Oklahoma, 73145, United States
- Zip Code: 73145
- Zip Code: 73145
- Record
- SN04044737-W 20160311/160309235716-8c0e52d83fa152c95d103d7648ea14fd (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |