MODIFICATION
Z -- Devil's Elbow Irrigation Replacement
- Notice Date
- 3/24/2016
- Notice Type
- Modification/Amendment
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- BLM MT WESTERN DISTRICT OFC(MTB000) 106 N. PARKMONT BUTTE MT 59701 US
- ZIP Code
- 00000
- Solicitation Number
- L16PS00244
- Response Due
- 4/4/2016
- Archive Date
- 4/19/2016
- Point of Contact
- Schmidt, Jaclyn
- Small Business Set-Aside
- Total Small Business
- Description
- Amendment 1 A. Attach new Value Schedule ( Item 3. (Total Coliform Bacteria Analysis Test) change unit from LS (lump sum) to EA (each) B. Drawing 3 (water line detail) specified 7 nipples per assembly, a total of 8 is needed. This (8th nipple) will be placed between the shut off valve and the hose bib vacuum breaker. C. Site Tour Question as follows: What is the Contractor's responsibility if the pressure test fails because water is seeping fro the existing pipeline (water leaking from the pipeline not impacted by construction: Answer: If the pressure test fails and there is no evidence that the new pipeline, fittings, or Contractor disturbed areas are leaking, it will be the Governments' responsibility to find and repair the leak. Contractor will be permitted to continue on with the contract. The contractor will still have to perform all tests and procedures identified in the contract. Devil's Elbow Irrigation Replacement
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/BLM/MT/L16PS00244/listing.html)
- Record
- SN04061958-W 20160326/160324235140-2a51fea6aa896e0cac47ac43e542495a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |