Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 30, 2016 FBO #5241
MODIFICATION

61 -- Replace PWT Switchgear

Notice Date
3/28/2016
 
Notice Type
Modification/Amendment
 
NAICS
221121 — Electric Bulk Power Transmission and Control
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, HQ Arnold Engineering Development Complex (AEDC) - Arnold, 100 Kindel Drive, Suite A-335, Arnold AFB, Tennessee, 37389-1335, United States
 
ZIP Code
37389-1335
 
Solicitation Number
FA9101-16-R-0034
 
Point of Contact
John M. Stewart, Phone: 9314544675, Christopher M. Fanning, Phone: 9314544458
 
E-Mail Address
john.stewart.33@us.af.mil, christopher.fanning.1@us.af.mil
(john.stewart.33@us.af.mil, christopher.fanning.1@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
NOTICE OF INTENT TO AWARD SOLE SOURCE: Arnold Engineering Development Complex (AEDC) intends to solicit, negotiate, and award a sole source contract to Siemens Energy, Inc., 1345 Ridgeland Parkway Suite 116 Alpharetta, GA 30004 for the design, equipment and installation required for replacement of medium voltage switchgear and primary unit substations. The Building 780 medium voltage switchgear replacement project includes demolishing obsolete 6.9kV switchgear and controls and providing new Siemens switchgear and controls. In addition, the work includes all equipment and installation required for replacement of the MC1 and MC4 medium voltage switchgear in Building 780 and replacing with new medium voltage Gas Insulated Switchgear (GIS). AEDC has the need to procure medium voltage switchgear that is reliable and safe. Gas Insulated Switchgear (GIS) is the latest technology that provides power without requiring personnel to be equipped with arc flash personal protective equipment (PPE) while operating or maintaining the GIS equipment. Hours of industry wide research, competitive bidding, and accepted maintenance and reliability practice have resulted in the conclusion that Siemens Type 8DA10 Gas Insulated Switchgear is the only switchgear that confines each of the three phases of power in three separate compartments. This is a critical requirement from a safety standpoint and mitigates electrical fault severity to avoid costly shutdowns of the entire system. With the isolation of the phases a factory-trained Siemens employee can remove the damaged phase and replace it with the identical part from a spare cubicle, and return the cubicle to service in a short amount of time. In most cases this work can be completed with the remainder of the switchgear lineup still in service. If spares are available, a new enclosure could be installed from the spare cubicle but the entire lineup would be unavailable throughout the duration of the repair.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/AEDC/FA9101-16-R-0034/listing.html)
 
Place of Performance
Address: 100 Kindel Drive Suite A332, Arnold AFB, Tennessee, 37389, United States
Zip Code: 37389
 
Record
SN04063774-W 20160330/160328233839-1dd464e17e002fbd0df4f6367adb80e8 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.