Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 30, 2016 FBO #5241
MODIFICATION

Y -- FY16 Grand Haven Inner and Outer Harbor Maintenance Dredging

Notice Date
3/28/2016
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Detroit, 477 Michigan Avenue, Detroit, Michigan, 48226, United States
 
ZIP Code
48226
 
Solicitation Number
W911XK-16-B-0010
 
Response Due
4/28/2016 2:00:00 PM
 
Archive Date
5/13/2016
 
Point of Contact
Bruce M. Walrad, Phone: 3132262134, Robert Austin,
 
E-Mail Address
bruce.m.walrad@usace.army.mil, robert.w.austin@usace.army.mil
(bruce.m.walrad@usace.army.mil, robert.w.austin@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
SOLICITATION POSTING - BID PERIOD IS OPEN - MARCH 28, 2016 SEE THE ATTACHED SOLICITIATION DOCUMENT FOR THE OFFICIAL RESPONSE DATE AND SUBMITTAL REQUIREMENTS FOR INTERESTED BIDDERS The U.S. Army Corps of Engineers, Detroit District, is soliciting bids for a maintenance dredging project in the Grand Haven Inner and Outer Harbors at Grand Haven, Michigan. Provide all equipment, materials, labor, support, supervision, and management to perform the following: 1. Mobilize dredge to Grand Haven Harbor. Excavate approximately 36,000 CY from the North Cell and transport excavated material to the placement area as shown on the drawings. 2. Dredge between the upstream and downstream limits shown on the drawings. Place the dredged materials onto the placement site as follows: A. Materials from Area 1 shall be placed in the government-furnished nearshore placement site beginning at a point 3,000 ft, north of the north breakwater, then extending 2,000 ft. northerly. Placement shall be as shown on the accompanying drawings and specifications. The lakeward and landward limits of placement shall be the most landward 12.0 ft depth contour and the most landward 8.0 ft depth contour. A clear depth of 4.0 ft from the top of the placed materials to the water surface shall be maintained. B. Materials from Areas 2, 3, and 4 shall be placed in the North Cell upland site. Materials placed in the upland site may only be placed hydraulically. 3. Demobilize when dredging work is completed.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA35/W911XK-16-B-0010/listing.html)
 
Place of Performance
Address: Near Shore Waters at Grand Haven Harbor, Grand Haven, Michigan, 49417, United States
Zip Code: 49417
 
Record
SN04064110-W 20160330/160328234150-3565280da40598fd4cfa40c3f56a2b2b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.