SOURCES SOUGHT
Y -- AZ FNTP SAGU 12(1), Kinney Road
- Notice Date
- 3/28/2016
- Notice Type
- Sources Sought
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- AZ-FNTP-SAGU-12(1)
- Archive Date
- 4/19/2016
- Point of Contact
- Craig Holsopple, Phone: 720-963-3350
- E-Mail Address
-
craig.holsopple@dot.gov
(craig.holsopple@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on April 4, 2016: (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE; (3) Letter from bonding agent stating your firm's capability to bond for a single project of $3 million, and your firm's aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the Kinney Road project in which you performed ( as the prime contractor ) grading, low water crossings, culverts, headwalls, riprap, aggregate base course, paving, traffic control, public information. State whether your firm was the prime contract or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs. PROJECT DETAILS: AZ FNTP SAGU 12(1) Kinney Road The AZ FNTP SAGU 12(1) Kinney Road project is located in Pima County, Arizona. This project in includes 2.9 miles roadway reconstruction of Kinney Road with drainage improvements. Type of Construction: grading, low water crossings, culverts, headwalls, riprap, aggregate base course, paving, traffic control, public information This project consists of: Schedule A: The entire 2.74 miles of Kinney Road will be rehabilitated. The treatment will be pulverize and overlay and drainage improvements. Significant Items for Schedule A Include: 1,100 CY of roadway excavation; 550 cuyd of structure excavation; 250 cuyd of riprap; full depth reclamation 6 inch depth, 5,950 tons of hot asphalt paving; 1,150 cuyd of structural concrete; 8,400 lbs of reinforcing steel, 110 LF of pipe culvert placement; 12 miles of pavement markings; 2300 flagger hours Options W, X, Y and Z: Significant Items for Options W, X, Y, and Z Include: 5,300 sqyd full depth reclamation 6 inch depth, 900 tons of hot asphalt paving; 2000 sqyd of micro surfacing; 1200 lnft of pavement markings; 1000 flagger hours It is anticipated this project will be advertised in May, 2016 with construction beginning in June 2016 and extending through December 2016. Estimated total cost for the Schedule A is $2,000,000 to $3,000,000.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/AZ-FNTP-SAGU-12(1)/listing.html)
- Place of Performance
- Address: Saguaro National Park, Pima County, Arizona, 85748, United States
- Zip Code: 85748
- Zip Code: 85748
- Record
- SN04064246-W 20160330/160328234253-23fcb2fc5c9f4e03bd32d846c1d9c8ff (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |