Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 13, 2016 FBO #5255
SPECIAL NOTICE

Y -- Soliciting comments from construction community addressing the potential use of a Project Labor Agreement (PLA) for the large scale (exceeding $25 million) construction project in Hampton Virginia Solicitation Number: W91236-16-PLA-0008.

Notice Date
4/11/2016
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Norfolk, 803 Front Street, Norfolk, Virginia, 23510-1096, United States
 
ZIP Code
23510-1096
 
Solicitation Number
W91236-16-PLA-0008
 
Archive Date
5/10/2016
 
Point of Contact
Elandria M. Cameron, Phone: 7572017062
 
E-Mail Address
elandria.m.cameron@usace.army.mil
(elandria.m.cameron@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The Army Corps of Engineers, Norfolk District is soliciting comments from the construction community addressing the potential use of a Project Labor Agreement (PLA) for the following large scale (exceeding $25 Million) construction project: Defense Logistics Agency (JBLE) Fuel Pier Access Channel, Hampton Virginia. The scope of this project is assisting in executing of the design and construction DLA Fuel Pier and Ground Vehicle Fueling Facility located on Joint-Base Langley Eustis (Langley) in Hampton, Virginia. The project mission is to provide fuel distribution facilities to support the wide array of missions for Air Combat Command. (ACC). The project includes construction of the new fuel pier and service station, demolition of the existing fuel pier and service station, and new work dredging for the proposed fuel pier's turning basin and berthing area. Dredged material will be placed at the Norfolk Ocean Disposal Site (NODS) for ocean disposal. design and construction of a concrete fuel pier, fender piles, mooring dolphins, a ground vehicle fueling facility with above ground storage tanks, and a utility building. The combined length of the pier and dolphins are estimated to be 868 linear feet. An estimated 45,000 cubic yards of dredged material may require removal. Contract requirements are anticipated to include the construction of a concrete fuel pier, fender piles, mooring dolphins, a ground vehicle fueling facility with above ground storage tanks, and a utility building. The combined length of the pier and dolphins are estimated to be 868 linear feet. Project includes the installation of a 10-inch carbon steel pipeline, two fuel loading arms, spill containment, and storm water management systems; demolition of the existing fuel pier (estimated age 50+ years) and ground fueling station and dredging work for a turning basin in association with the fuel pier. An estimated 45,000 cubic yards of dredged material may require removal. The area has not been dredged previously. Sediment testing has been performed and the dredge material is suitable for ocean disposal at the Norfolk Ocean Disposal Site (NODS), approximately 37 miles from the project location. This requirement includes components of Gas Pipeline installation and Related Structures Construction and Dredging. Range of Magnitude: Between $25,000,000 and $100,000,000. Period of Performance: The period of performance will be 36 months from Notice to Proceed. Some of the factors that may be considered regarding PLA use are: a. The involvement of multiple contractors and/or subcontractors working in multiple crafts or trades. b. The complexity of the project. c. Shortage of skilled labor in the region. d. Completion of the project will require an extended period of time. e. The use of PLA's on other comparable projects in this geographic area. f. The promotion of the Governments long term programs interests such as training of skilled workforce for future projects. g. The possibility of labor disputes that threaten timely completion. h. Additional costs from use of PLAs may be cost prohibitive. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy: a. Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. b. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will 1. Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and 2. Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: a. Should a PLA be executed on the above described LHCC? What benefits do you believe a PLA could achieve? What other factors should the Corps consider before deciding to include PLA provisions for the LHCC project? b. Will the use of a PLA be effective in achieving economy and efficiency? If so, how? What is the estimated relative cost impact, or any other economies or efficiencies derived by the Federal Government, if using a PLA? Will a PLA impact the cost of submitting an offer? c. Are there any concerns regarding labor-management stability related to this project? Will the use of a PLA produce labor-management stability on this project? Have labor disputes or other labor issues contributed to project delays in the local area? Are you aware of examples of labor-management conflicts in the area which could impact the efficiency of this project, which a PLA could positively impact/resolve? What market share does union labor in construction trades have in the geographic area? Which existing Collective Bargaining Agreements will expire during construction of this project? d. Will use of a PLA be conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters on this project? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? e. This project will require construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on this project that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? f. Are there concerns by prime contractors on the availability of skilled construction labor? Are there large scale construction projects in the area (over $25M, within 50 miles of LHCC) which could impact availability of skilled labor for this project? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Are existing apprentice programs providing sufficient numbers of skilled workers for future requirements? g. Is the proposed schedule/completion time one which would benefit from a PLA - if so, how? Will a PLA impact the completion time? Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? h. Have comparable projects been undertaken by Federal, State, municipal, or private entities in the geographic area of this project? For each project, please indicate if a PLA was used, the initial and final cost, number of trades on the project, if the project was completed on time, and if there were any challenges such as labor shortages, labor related delays, safety issues, etc.. i. Will the use of PLAs impact the ability of potential Offerors and subcontractors to meet small-business utilization goals? Please provide your responses to these questions and any comments via e-mail to Ms. Elandria M. Cameron, Contract Specialist, at elandria.m.cameron@usace.army.mil no later than close of business on 25 April 2016.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA65/W91236-16-PLA-0008/listing.html)
 
Place of Performance
Address: Hampton, Virginia, United States
 
Record
SN04080397-W 20160413/160411234814-374444d059ccbd265fc109a2413f3a9e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.