Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 05, 2016 FBO #5277
SOLICITATION NOTICE

Y -- Construct Concrete Pads and Place Sewage Holding Tanks - Solicitation

Notice Date
5/3/2016
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
Department of the Air Force, Pacific Air Forces, 374 CONS - Yokota, Unit 5228, Yokota AB, APO Japan, 96328-5228
 
ZIP Code
96328-5228
 
Solicitation Number
FA5209-16-R-0016
 
Archive Date
6/2/2016
 
Point of Contact
John Freeling, Phone: 011-81-42-552-6679, John Freeling, Phone: 011-81-42-552-6679
 
E-Mail Address
john.freeling@us.af.mil, pacificunitycontracting@gmail.com
(john.freeling@us.af.mil, pacificunitycontracting@gmail.com)
 
Small Business Set-Aside
N/A
 
Description
This is the Air Force Form 3000. Use this form to submit the types of materials you will use to complete the project (This document is only being provided for informational purposes at this point. Do not submit this form with your quote) This #2 of two (2) drawings documents. These will be used to complete the work. Please study them before providing your quote. This #1 of two (2) drawings documents. These will be used to complete the work. Please study them before providing your quote. This is the Statement of Work (SOW). Please read it in its entirety before submitting quotes. Feel free to ask questions via email or phone. This is the solicitation. Please read it in its entirety before submitting quotes. Feel free to ask questions via email or phone. The contractor shall provide all material, tools, equipment, transportation, supervision, management, and labor necessary to remove existing concrete rubble, construct concrete pads, footers, columns, bond beams and associated structures contained in the approved project plans in attachment #1, hereinafter referred to as "drawings". In the event of any inconsistencies, details provided in the drawings take precedence over any references within the Statement of Work (SOW). Contractor shall perform all work in accordance with this SOW and the drawings. Contractor shall coordinate all work with the Contracting Officer (CO) and is subject to the scheduling and phasing of work as stated in section 3.0 of this document. The project will consist of 3 phases. Phase 1 consists of clearing the existing concrete rubble, building up the grade to a higher elevation by 6 inches, and placing a 90ft x 25ft-4in pad, footers, columns and bond beams for the schoolhouse in accordance with the drawings. Phase 2 consists of placing a 8ft x 12ft pad, footers, columns and bond beams 15ft adjacent to the previous one for the comfort room in accordance with the drawings. Phase 3 consists of installing 1-2 horizontal holding tanks for sewage in accordance with paragraph 7 of this SOW, not the drawings. All work shall be performed at the Floridablanca Elementary School, Floridablanca, Pampanga, Philippines. All work shall be approved by the Contracting Officer prior to issuance of the Notice to Proceed (NTP) for the next phase.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/PAF/374CONS/FA5209-16-R-0016/listing.html)
 
Place of Performance
Address: Floridablanca Elementary School, Barangay, San Antonio, Floridablanca, Pampanga, Floridablanca, East District, Philippines, Floridablanca, Non-U.S., Philippines
 
Record
SN04102875-W 20160505/160503234236-0cbfd114642bbf0bcf3d28f0918bf0d0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.