MODIFICATION
49 -- TF33 WORK PLATFORMS - Revised Statement of Work - Amendment 2
- Notice Date
- 5/12/2016
- Notice Type
- Modification/Amendment
- NAICS
- 333923
— Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, PK/PZ Tinker AFB, 3001 Staff Drive, Ste 1AG76A, Tinker AFB, Oklahoma, 73145-3015, United States
- ZIP Code
- 73145-3015
- Solicitation Number
- FA8132-16-R-0002
- Point of Contact
- Lakiesha R. Hawkins, Phone: 4057341145, Darrell L. Hafer, Phone: 4057395819
- E-Mail Address
-
lakiesha.hawkins@us.af.mil, darrell.hafer@us.af.mil
(lakiesha.hawkins@us.af.mil, darrell.hafer@us.af.mil)
- Small Business Set-Aside
- N/A
- Description
- This is amendment 0002 for solicitation FA8132-16-R-0002. This is the revised Statement of Work (SOW). ADDED 12-May-16 **** PLEASE SEE ATTACHED REVISED STATEMENT OF WORK**** 5352.215-9001 NOTICE OF PRE-BID/PRE-PROPOSAL CONFERENCE (MAY 1996) (a) A pre-bid/pre-proposal conference will be conducted at Bldg 9001, Tinker AFB on 24-May-16 at 1330 for the purpose of answering questions regarding this solicitation. (b) Submit the names of all attendees (not to exceed 4 ) to lakiesha.hawkins@us.af.mil prior to 20-May-16. This information must be provided in advance in order to ensure access to the military base/conference site and adequate seating for the conference attendees. (c) Bidders/Offerors are requested to submit questions to the point of contact noted above not later than 20-May-16. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. (d) A record of the conference shall be made and furnished to all prospective bidders/offerors. The record should include minutes of the meeting, including questions (on a non-attribution basis) and answers. ********************QUESTIONS/ANSWERS********************** QUESTION 1: Part I, Item (4), Section (b.). The existing units are anchored to thefloor, but are free standing as not to tie off to the existing steelstructure. Is the current requirement the same? ANDWER: The requirement is the same and clarified in the updated SOW QUESTION 2: Part I, Item (10) Please confirm that government is removing the lifts and all connecting utilities, in full. ANDWER: This is confirmed and clarified in the updated SOW. QUESTION 3: Will there be a staging area available for material during the installation? ANDWER: A staging area will be provided in building 9001.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8132-16-R-0002/listing.html)
- Record
- SN04114728-W 20160514/160512234357-6066f8559e794c73550c9e8fc2db1e9f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |