Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 25, 2016 FBO #5297
SOLICITATION NOTICE

Y -- CA FTNP/NPS YOSE 500(1) & 16(7)

Notice Date
5/23/2016
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6816B00014
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633500, Agnes Rysz, Phone: 3039633500
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 4.9 miles of roadway on the CA FTNP/NPS YOSE 500(2) & 16(7) project in Yosemite National Park, Mariposa County, California. Work is included on El Portal Road and Valley Loop Road (Northside and Southside Drives), and Sentinel Drive within Yosemite Valley. Principle work items include 22,000 tons of superpave hot asphalt concrete pavement, 24,000 tons of aggregate base, 18,000 cubic yards of roadway excavation, 7,000 cubic yards of subexcavation, 8,000 tons of surface course aggregate, and 3.8 miles of pulverizing. Work also includes realignment of 2,000 feet of Northside Drive, roundabout construction at the Village Drive intersection, reconstruction of the Camp 6 and Camp 4 parking lots, drainage improvements, asphalt and aggregate trail construction, and utility work including waterline, sewerline, and electrical system installation. Additional work items include 1,200 square yards of reinforced concrete pavement, 30,000 linear feet of concrete curb, 5,000 feet of granite curb, 2,800 linear feet of pipe culverts (CMP), and 50 stone masonry headwalls. All of the work is occurring in cultural and natural resource sensitive areas. Construction phasing and temporary traffic will be very important to minimize disruptions to park visitors throughout construction. Temporary traffic control will need to accommodate vehicles, bicycles, and pedestrians. It is anticipated this project will be advertised in June, 2016 with construction beginning in October 2016 and extending through November 2017. The estimated price range is between $ 12,000,000 and $16,000,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6816B00014/listing.html)
 
Place of Performance
Address: Yosemite National Park, El Portal, California, 95389, United States
Zip Code: 95389
 
Record
SN04125273-W 20160525/160523234121-783841ae7c1028456594ebe864f45b53 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.