Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MAY 26, 2016 FBO #5298
MODIFICATION

H -- Cathodic Protection

Notice Date
5/24/2016
 
Notice Type
Modification/Amendment
 
NAICS
238190 — Other Foundation, Structure, and Building Exterior Contractors
 
Contracting Office
Department of the Air Force, Air Combat Command, 9 CONS, 6500 B St Ste 101, Beale AFB, California, 95903-1712
 
ZIP Code
95903-1712
 
Solicitation Number
FA4686-16-T-0011
 
Archive Date
6/15/2016
 
Point of Contact
Ryan Finley, Phone: 5306343370, Jessica D. Young, Phone: 5306343374
 
E-Mail Address
ryan.finley.2@us.af.mil, jessica.young.7@us.af.mil
(ryan.finley.2@us.af.mil, jessica.young.7@us.af.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Please see below for answers to additional questions: 2) Are the dimensions for each tank (diameter, height) vice just the volumes available and if so, can you provide them? The estimated diameters for each tank: P4802: 86' P5750: 60' P4800: 60' P8694: 132' Bldg 11599: 19' Bldg 11598: 19' Bldg 1150: 40' Bldg 1038 #1: 26' Bldg 1038 #2: 38' 3) The SOW references UFC 3-570-06 Table 4.6. In this table, the potential measurement locations are specified - next to tank wall across from anode strings and next to tank wall in between the anode strings. Are there access holes on each tank's roof to lower a portable reference cell at each of these locations? Yes. Each Reference Cell has a hole and there are hatches as well if needed. 4) Does the USAF desire anything besides a price quote? a) Like Past Performance? Yes b) Resume(s)? No c) Reps and Certs? According to Paragraph 4.4. of the SOW: "Contractor Qualifications. All work shall be performed by or under the direct supervision of a contractor who shall submit to the CO, documentation showing that they possess current and up to date certification as a CP tester by accredited associations like the National Association of Corrosion Engineers (NACE) or Steel Tank Institute (STI)." d) A technical approach or project plan? According to Paragraph 1.1. of the SOW: "A detailed project plan will be provided to the Project Manager by the contractor at least ten (10) working days prior to the start of work. The project plan must include a step by step process of accomplishing all inspections/validations. As well as a list of proposed chemicals and equipment needed to accomplish the work. Work will not begin until the project plan has been approved by all governing authorities."
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/9CONS/FA4686-16-T-0011/listing.html)
 
Place of Performance
Address: Beale AFB, CA, Beale AFB, California, 95903, United States
Zip Code: 95903
 
Record
SN04127380-W 20160526/160524234802-17c1b1aee11649ff91c832e2b0862a8b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.