MODIFICATION
H -- Cathodic Protection
- Notice Date
- 5/24/2016
- Notice Type
- Modification/Amendment
- NAICS
- 238190
— Other Foundation, Structure, and Building Exterior Contractors
- Contracting Office
- Department of the Air Force, Air Combat Command, 9 CONS, 6500 B St Ste 101, Beale AFB, California, 95903-1712
- ZIP Code
- 95903-1712
- Solicitation Number
- FA4686-16-T-0011
- Archive Date
- 6/15/2016
- Point of Contact
- Ryan Finley, Phone: 5306343370, Jessica D. Young, Phone: 5306343374
- E-Mail Address
-
ryan.finley.2@us.af.mil, jessica.young.7@us.af.mil
(ryan.finley.2@us.af.mil, jessica.young.7@us.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Please see below for answers to additional questions: 2) Are the dimensions for each tank (diameter, height) vice just the volumes available and if so, can you provide them? The estimated diameters for each tank: P4802: 86' P5750: 60' P4800: 60' P8694: 132' Bldg 11599: 19' Bldg 11598: 19' Bldg 1150: 40' Bldg 1038 #1: 26' Bldg 1038 #2: 38' 3) The SOW references UFC 3-570-06 Table 4.6. In this table, the potential measurement locations are specified - next to tank wall across from anode strings and next to tank wall in between the anode strings. Are there access holes on each tank's roof to lower a portable reference cell at each of these locations? Yes. Each Reference Cell has a hole and there are hatches as well if needed. 4) Does the USAF desire anything besides a price quote? a) Like Past Performance? Yes b) Resume(s)? No c) Reps and Certs? According to Paragraph 4.4. of the SOW: "Contractor Qualifications. All work shall be performed by or under the direct supervision of a contractor who shall submit to the CO, documentation showing that they possess current and up to date certification as a CP tester by accredited associations like the National Association of Corrosion Engineers (NACE) or Steel Tank Institute (STI)." d) A technical approach or project plan? According to Paragraph 1.1. of the SOW: "A detailed project plan will be provided to the Project Manager by the contractor at least ten (10) working days prior to the start of work. The project plan must include a step by step process of accomplishing all inspections/validations. As well as a list of proposed chemicals and equipment needed to accomplish the work. Work will not begin until the project plan has been approved by all governing authorities."
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/9CONS/FA4686-16-T-0011/listing.html)
- Place of Performance
- Address: Beale AFB, CA, Beale AFB, California, 95903, United States
- Zip Code: 95903
- Zip Code: 95903
- Record
- SN04127380-W 20160526/160524234802-17c1b1aee11649ff91c832e2b0862a8b (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |