Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 04, 2016 FBO #5307
SOLICITATION NOTICE

S -- AFICA Electricity Supply to ROB/Weilerbach Area, Construction Site Army Hospital - Attachments

Notice Date
6/2/2016
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
221122 — Electric Power Distribution
 
Contracting Office
AFICA - AFICA- EUROPE
 
ZIP Code
00000
 
Solicitation Number
FA5641-16-R-5402
 
Archive Date
7/12/2016
 
Point of Contact
Caterina Henn, Phone: 004963714057852
 
E-Mail Address
caterina.henn.de@us.af.mil
(caterina.henn.de@us.af.mil)
 
Small Business Set-Aside
N/A
 
Description
Atch 4 Price Schedule Atch 3 Past Experience Atch 2 Projection & Estimated Load Profiles Atch 1A Technical Specifications German Atch 1 Technical Specifications English This is a combined synopsis/solicitation for electricity supply. This announcement constitutes the solicitation; proposals are being requested. The solicitation number is: FA5641-16-R-5402 issued as a Request for Proposal (RFP). A. REQUIREMENT 1. Electricity supply shall be provided to the following service location: Rhine Ordinance Barracks (ROB)/Weilerbach Area, Construction Site Army Hospital, Germany 2. The contractor shall provide all labor, tools, equipment, material, personnel, supervision, management and financing and shall obtain any licenses or permits required and any other items necessary for the provision of electricity supply to the aforementioned service location in accordance with the electric service specifications, enclosed as Attachment (Atch) 1 and Atch 1A, in English and German language. The contractor shall supply electricity in accordance with commercial standards, practices and local host nation laws and regulations. Electricity shall be provided free on board (FOB) Destination for the delivery point in accordance with item F. The Government will not provide logistical support. 3. The electricity delivered to the service location ROB/Weilerbach Area, Construction Site Army Hospital shall be continuous. B. FUNDING Fiscal year (FY) 16 and FY 17 planning funds are available for this contract. C. PLACE OF PERFORMANCE ROB/Weilerbach Area, Construction Site Army Hospital, Germany D. ANTICIPATED CONTRACT TYPE The US Government anticipates to award a fixed-price contract. E. PERIOD OF ELECTRICITY SUPPLY Contract Period (fixed): 1 year and 3 months separated as follows: Basic Period: 30 Sep 2016 - 31 Dec 2016 (3 months year) Follow-on year: 01 Jan 2017 - 31 Dec 2017 (1 year) F. TECHNICAL DATA/REQUIREMENTS See Atch 1/1A, Electric Service Specifications for the Supply with Electricity for ROB/Weilerbach Area, Construction Site Army Hospital. G. OTHER INFORMATION 1. See Atch 2 for the Overall Projection and Estimated Load Profiles (Oct 16 - Dec 17). 2. The following information in support of demand estimation (at peak periods) is provided: Point of Consumption Quantity Power Requirement Total (estimated) (estimated) Tower crane, 50 meters (m) 22 35 kW 770 kW Office containers* 180 4.5 kW 810 kW Sanitary containers** 50 5 kW 100 kW Storage containers 120 0.5 kW 60 kW Scaffold Elevators 14 10 kW 140 kW Crane lighting 22 1 kW 22 kW (Spots, 1 kW each) Outdoor lighting 208 1 kW 208 kW (light column, 1 kW each) Total Interior Site lighting 2700 50 W 135 kW ____________________________________________________________________________________________________________________________________________________________ Total estimated demand (at peak periods) 2,245 kW At an expected simultaneity factor between 0.6 and 0.8, the total estimated maximum demand amounts to 1,500 kW. * The office containers are about 2.5 m wide and 6 m long with the below equipment: - 1 frost monitor, 0.5 kW - Air conditioner, about 2.6 kW - Lighting, 2 x 36 W - 4 outlets about 1 kW (computer, coffee machine, etc.) - Heating with gas tanks ** The sanitary containers are about 2.5 m wide and 6 m long with the below equipment: - 2 showers - 3 lavatories - 1 frost monitor, 0.5 kW - Lighting 2 x 36 W - 2 outlets, about 0.5k W - Hot water boiler and heating with gas tanks - 1 hand dryer 3. The most current versions of the Electricity Base Ordinance (StromGVV) and Low Voltage Connection Ordinance (NAV) shall be applied throughout performance of this contract. 4. Should the legislator change the Strom GVV and/or the NAV, both parties have the right to replace the current regulation to the StromGVV and NAV by the amended provisions with written notice to the respective other contract party. H. CORRESPONDENCE IN ENGLISH: The Contractor shall submit all contract correspondence to the United States Government in English or with an English translation. I. REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS 1. The contractor shall not knowingly provide compensation to a covered DoD official within 2 years after the official leaves DoD service, without first determining that the official has sought and received, or has not received after 30 days of seeking, a written opinion from the appropriate DoD ethics counselor regarding the applicability of post-employment restrictions to the activities that the official is expected to undertake on behalf of the contractor. "Covered DoD official," as used in this clause, means an individual that- a. Participated personally and substantially in an acquisition with a value in excess of $10 million, and serves or served in an Executive Schedule, Senior Executive Service, general or flag officer (grade O-7 and above) position, or b. Serves or served in DoD in one of the following positions: program manager, deputy program manager, procuring contracting officer, administrative contracting officer, source selection authority, member of the source selection evaluation board, or chief of a financial or technical evaluation team for a contract in an amount in excess of $10 million. 2. Failure by the contractor to comply with paragraph (1) above may subject the contractor to rescission of this contract, suspension, or debarment from future business with the Government in accordance with applicable laws and regulations. J. TAXES 1. The electricity price shall be exclusive of any taxes or duties, which the US Government and the Government of the Federal Republic of Germany (FRG) have agreed, shall not be applicable to expenditures made by the US Government in the FRG, or any taxes or duties from which the contractor is exempt under the laws of the FRG. If any such taxes or duties are included in the electricity price, through error or otherwise, the electricity price shall be reduced. The appropriate amount shall be listed separately and reduced in the next month's invoice. The treatment of all tax deductions shall be in accordance with the agreements in force at the time between the FRG and the US Government. 2. If for any reason after the date of the agreement, one of the two parties is relieved in whole or in part from the payment of any taxes or dues included in the electricity price, the electricity price shall be reduced. The appropriate amount shall be listed separately and reduced in the next month's invoice. K. ACCOUNTING, PAYMENT AND INVOICES 1. The US Government will pay the amounts for deliveries in the preceding month charged by the contractor on a monthly basis no later than (NLT) 30 days after receipt of a proper invoice. 2. The invoice shall be based on the demand and the actual consumption per month. Cost for the net usage (consumption and maximum offtake for customers with demand metering), metering fee, accounting fee, license fee as well as the electricity price (consumption and demand) shall be listed separately on the invoice. In addition, the invoice shall contain the following: - Name and address of contractor - Invoice date - Contract number - Description, quantity, unit of measure, unit price and total price - Name, title, telephone number of point of contact to be notified in case of an incorrect invoice. 3. The US Government will pay by Electronic Funds Transfer (EFT). Payment will be made to: Name of bank: ____________________________ Account owner: ____________________________ Account number: ___________________________ Bank code: ____________________________ SWIFT code: ____________________________ IBAN: ___________________________ (Offeror fill-ins) 4. Payment due dates. The due date for making an invoice payment is as follows: a. The 30th day after the designated office responsible for acceptance of services receives a proper invoice from the contractor. If the office responsible for acceptance of services, fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or contractor compliance with contract requirements. b. Interest penalties that might be due the contractor for late payments. (1) Contractor is not required to separately invoice to request interest penalty amounts. (2) The Government must base the determination of an interest penalty on the actual date of a proper invoice was received. (3) The Government will compute interest penalties in accordance with the Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315. These regulations are available via the Internet at http://www.fms.treas.gov/prompt/. 5. The proof of tax exemption (Value Added Tax) shall be provided by a tax relief form ("Abwicklungsschein") attached to each invoice. 6. Invoices shall be addressed to: Base Civil Engineer 52 CES/CEIAR Frau Bastanipour Geb. 119 54529 Spangdahlem Air Base. 7. Payment will be made by: DFAS Limestone DFAS EU, ATTN: AF Kleber Kaserne, Building 3200 67657 Kaiserslautern. L. INVALIDITY OF CONTRACT TERMS 1. Should any of the terms contained in this contract be or become invalid, the validity of the other terms will not be affected thereby. Both parties agree to replace invalid terms with terms, equal as to the intended technical and economic effect. 2. Changes to this contract and additional agreements shall only be valid, if recognized in writing by both parties. This does not apply to administrative changes (e.g. address changes, appropriation data, etc.), which can be processed by the Contracting Officer unilaterally within the scope of the contract. M. TERMINATION OF CONTRACT The US Government reserves the right to terminate this contract for political or military reasons at any time, partially or in its entirety within 90 days written termination notice without any liability for the US Government. The termination notice shall be submitted in written format. The contractor shall confirm receipt of the termination notice in writing to the Contracting Officer. The US Government is released from any liability for payment once the termination becomes effective. The US Government may terminate the contract without notice due to the contractor's non-performance of contractual obligations, and will in this case be released from further contractual liability. N. LEGAL SUCCESSOR 1. The contractor may transfer rights and obligations to a legal successor with the written consent of the Contracting Officer only. This consent may be withheld only if and when the successor does not afford reliable assurance of performing this contract. a. The contractor shall submit to the Contracting Officer three signed copies of the proposed Novation Agreement and one copy each, as applicable, of the following: (1) The document describing the proposed transaction, e.g., purchase/sale agreement or memorandum of understanding. (2) A list of all affected contracts between the transferor and the Government, as of the date of sale or transfer of assets, showing for each, as of that date, the - (i) Contract number and type; (ii) Name and address of the contracting office; (iii) Total dollar value, as amended; and (iv) Approximate remaining unpaid balance. (3) Evidence of the transferee's capability to perform. (4) Any other relevant information requested by the responsible Contracting Officer. b. The contractor shall submit to the Contracting Officer one copy of each of the following documents, as applicable, as the documents become available: (1) An authenticated copy of the instrument effecting the transfer of assets; e.g., bill of sale, certificate of merger, contract, deed, agreement, or court decree. (2) A certified copy of each resolution of the corporate parties' boards of directors authorizing the transfer of assets. (3) A certified copy of the minutes of each corporate party's stockholder meeting necessary to approve the transfer of assets. (4) An authenticated copy of the transferee's certificate and articles of incorporation, if a corporation was formed for the purpose of receiving the assets involved in performing the Government contracts. (5) The opinion of legal counsel for the transferor and transferee stating that the transfer was properly effected under applicable law and the effective date of transfer. (6) Balance sheets of the transferor and transferee as of the dates immediately before and after the transfer of assets, audited by independent accountants. (7) Evidence that any security clearance requirements have been met. (8) The consent of sureties on all contracts listed under paragraph a. of this section if bonds are required, or a statement from the transferor that none are required. 2. In the event the service location, the supplied building is located at, is returned to the FRG, the FRG, reserves the right, after prior coordination with all parties concerned, to take over the rights and liabilities of the US Government of this contract. The date of transfer by the FRG, shall also be coordinated with all parties concerned. O. APPLICATION OF GERMAN LAW, PLACE OF PERFORMANCE AND JURISDICTION, LITIGATION ON BEHALF OF THE GOVERNMENT 1. This contract will be governed the laws of the Federal Republic of Germany. 2. Place of performance is ROB/Weilerbach Area, Construction Site Army Hospital. The place of jurisdiction for any litigation in the context of this contract in accordance with the German Civil Procedural Code (Zivilprozessordnung) Section 29 (1) is the place of performance. 3. In case of disputes arising from the contract, complaints shall be lodged in accordance with the NATO Status of Forces Agreement and supplementary agreements with the German courts and against the Federal Republic of Germany, which shall conduct the case in its own name in the interest of the US Government. P. DISPUTES, CLAIMS 1. Any dispute or claim an offeror or awardee intends to take to court shall be addressed to the Contracting Officer first for resolution. The Contracting Officer has 60 days to resolve and/or provide a final decision, and then the offeror or awardee may proceed to court after giving such notice of intent. 2. The US Government reserves the right to set-off/withhold payment if there is an issue with a claim against the contractor (e.g. overpayment, damages, etc.). Q. CONTRACTING OFFICE 1. Contract administration will be performed by 764th SPECIALIZED CONTRACTING SQUADRON (SCONS). 2. Postal address and location of the contracting office: 764th Specialized Contracting Squadron (764 SCONS) PKB/Utilities Kapaun Air Station, Geb. 2767 Unit 3024, APO AE 09021 67661 Kaiserslautern, Germany The envelope shall be marked "For Official Business". 3. Technical Representative of the Contracting Officer: The Director of Public Works (US Army Garrison Rheinland-Pfalz (USAG R-P) is the technical representative of the Contracting Officer for accepting services and verifying invoices for the service location ROB/Weilerbach Area, Construction Site Army Hospital. R. CONTRACTOR ACCESS TO US AIR FORCE INSTALLATIONS 1. The Contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation. 2. The Contractor shall process required documentation in due time to comply with required performance periods of the contract by taking into consideration that the controlling authorities require an average of 2 to 3 weeks to issue base access permits. The contractor shall inform all assigned workers that they may be subject to search, at the discretion of the installation commander, when entering or leaving the installation. 3. a. U.S. Air Force installations. The Contractor shall obtain and complete the base access request forms from Security Forces. Contractors who employ Local Nationals shall deliver the completed forms and required documents directly to the Foreign Nationals screening booth located at the West Gate of Ramstein Air Force Base. US Contractors shall provide the completed forms and required documents to their designated security manager. Security Forces shall be responsible for approval and subsequent authentication and issuance. For each base access request the contractor shall present the following documents: (1) Certificate of Good Conduct, and (2) Completed and signed AE Form 604-1b, Simple Questionnaire for a simple Security Check. The procedure foreseen above recognizes host nation legislation on privacy of information of a personal nature and the restrictions on disclosure of such information. The Contractor shall therefore and for each base pass issued maintain on file the records listed in (1) and (2) above for the period of time at least equal to the base access permit validity period. b. Other than U.S. Air Force installations. The Contractor shall comply with documentation and information request and procedures mandated by the controlling authority Security Forces. 4. When work under this contract requires entry to controlled or restricted areas, the contractor is forewarned that work shall be performed under escort and entry/exit procedures may require up to two hours. The area entry and exit times are at no additional cost to the U.S. Government. Furthermore the Contractor shall provide Security Forces with the following information for vehicles: Make, model, year of manufacture, capacity, type, license number, and insurance policy number. 5. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office. In addition base passes shall be returned when: a. Permit holder is no longer employed by the contractor. b. Employee has subsequently been served sentence or has committed a criminal offense and is subject to proceedings. c. Contracting Officer so directs. 6. Failure to comply with these requirements may result in withholding of final payment. S. ORDER OF PRECEDENCE In the event of any inconsistencies in this contract, the following order of precedence shall prevail: 1. The wording of this contract. 2. The Attachments in the sequence as listed in this contract. T. PRICE All data and prices shall be submitted in Euro (€) currency, and for the periods addressed in item E. All prices shall be exclusive of any taxes and dues from which the US Government is exempt under the NATO Statute of Forces Agreement and/or any other agreement between the US Government and the Government of the Federal Republic of Germany (FRG). The proposal shall be submitted in accordance with the price schedule in both Excel and pdf. format set forth in Atch 4 comprising: 1. Fixed-price for the service location, comprising-- a. Energy Price, b. Net Usage Cost (fixed based on calendar year 2016 actuals published by Pfalzwerke Netz AG c. Surcharges (fixed based on calendar year 2016 actuals published by Pfalzwerke Netz AG), d. and any other costs associated which shall be considered, shall be listed separately. 2. The offeror shall list the amount and description of tax excluded from the electricity price. U. POINTS OF CONTACT 1. Ms. Caterina Henn/Contract Specialist Tel. +49(0)6371-405-7852 Email: caterina.henn.de@us.af.mil 2. Ms. Uschi Hoermann/Contracting Officer Tel. +49(0)631-536-8326 Email: ursula.hoermann.de@us.af.mil V. INSTRUCTIONS TO OFFERORS Offerors are advised to complete item K., paragraph 3 of this solicitation and return with their signed proposal, including the price schedule set forth in Atch 4 as referenced in item T and the Past Experience information as required in Atch 3. An offeror must submit proof of responsibility by providing (i) adequate financial resources (e.g. copy of current trade register [Handelsregisterauszug]), and (ii) be registered in SAM (System for Award Management) (e.g. copy of the SAM registration) to be eligible for award. Any questions/inquiries regarding the solicitation shall be submitted via email to all points of contact listed in item U above no later than 5 work days (NLT 16:00 hrs local CET time) after the solicitation release to properly respond prior to the closing date for receipt of proposals. The proposal shall be valid for a period of minimum one (1) working day. W. EVALUATION OF PROPOSALS The Government will award a commercial Fixed-Price contract for a 1 year and 3 months period resulting from this solicitation to the one responsible offeror whose proposal conforming to the solicitation is evaluated to have the lowest fair and reasonable price, is registered and active in SAM with acceptable Past Experience. Lowest price will be determined by adding CLINS 1-6, in Atch 4, for a total evaluated amount. Proposals will only be accepted in Euro currency. Acceptable Past Experience is demonstrated where the offeror has performed one (1) contract within the last five years of similar scope (approx. 2,000,000 kWh per annum or higher). X. CLOSING DATE FOR RECEIPT OF PROPOSALS Proposals shall be submitted electronically by email no later than 27 Jun 2016, 15:00 hrs local time to the following email addresses: caterina.henn.de@us.af.mil and ursula.hoermann.de@us.af.mil in order to be timely. Late submission will be handled as follows: 1. Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government email inbox addresses designated in the solicitation by the time and date specified above. 2. Any offer, modification, revision, or withdrawal of an offer received at the Government email inbox addresses designated in the solicitation after the exact time and date specified for receipt of offers is "late" and shall not be considered for award. 3. If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government email addresses designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. 4. Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. As the solicitation authorizes email offers, offers may be withdrawn by email received at any time before the exact time set for receipt of offers. Y. DISCUSSIONS AND AWARD 1. Discussions a. The Government intends to evaluate proposals and award a contract without discussions. Therefore, the offeror's initial proposal should contain the offeror's best terms from a price standpoint and submit all required documents. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, the Government may open discussions with the offerors consistent with the evaluation criteria in item V. above. Discussions may be opened to resolve any potential mistakes contained in the offeror's proposal, to clarify or revise pricing, or any other aspect of the proposals that may lead to a better understanding of the offeror's proposals. b. By submitting a proposal to the Government the offeror has agreed to all terms and conditions included in this solicitation. c. The offeror who receives the award shall provide a German translation of the contract upon request at no additional cost to the US Government. d. Any questions or concerns on this solicitation may be directed to Ms Caterina Henn at phone number 06371-405-7852 or Ms Uschi Hoermann at 0631-536-8326. 2. Award Award will be made to the responsible offeror whose offer conforming to this solicitation will be most advantageous to the Government, price and other factors considered. The Government will select the lowest price offeror who is registered and active in SAM with acceptable Past Experience. The following factors shall be used to evaluate offers: Price and Past Experience Step 1 - The Government will first evaluate all proposals for price, ranking the offerors from lowest to highest total evaluated price. Step 2 - The lowest price proposal will be evaluated for Past Experience. If the lowest priced offeror's Past Experience is "Unacceptable," the next low offeror's Past Experience proposal will be evaluated, continuing until an "Acceptable" Past Experience rating is determined. Step 3 - Award will be made to the offeror with the lowest fair and reasonable price with acceptable Past Experience. ____________________________________________ ______________ Signature and Name/Title of Person authorized to sign Date Company Name: Attachments Atch 1 Electric Service Specifications English Atch 1A Electric Service Specifications German Atch 2 Overall Projection & Estimated Load Profiles Atch 3 Past Experience Atch 4 Price Schedule
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/6eb39516b826cbc86dda6f30df4f9a7e)
 
Place of Performance
Address: ROB/Weilerbach Area, Construction Site Army Hospital, Germany, Germany
 
Record
SN04137360-W 20160604/160602235609-6eb39516b826cbc86dda6f30df4f9a7e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.