SOURCES SOUGHT
Y -- Louisville District Corps of Engineers Soliciting Comments on the Potential Use of Project Labor Agreements (PLAs) at Robins AFB, GA.
- Notice Date
- 6/3/2016
- Notice Type
- Sources Sought
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Louisville, Attn: CELRL-CT, PO Box 59, Louisville, Kentucky, 40201-0059, United States
- ZIP Code
- 40201-0059
- Solicitation Number
- W912QR-16-PLA-ROBINSCMC
- Archive Date
- 6/30/2016
- Point of Contact
- April C. Judd,
- E-Mail Address
-
april.c.judd@usace.army.mil
(april.c.judd@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $25 million) for the following project: Construct Phase I of the Air Force Reserve Command Consolidated Mission Complex (CMC) office building which is an approximately 92,000 square foot (SF) two-story structure, houses approximately 382 military and civilian personnel, and includes both secure and non-secure spaces. The project includes all site clearing and grading. Demolition will consist of removal of all existing utilities that are in conflict with the proposed design. Pavement will include a ceremonial drive and parking areas. Service and delivery access to the building also will be provided, along with a screened mechanical yard and loading dock. The first floor consists of reinforced concrete slab on grade construction over prepared subgrade. Reinforced concrete retaining walls at the mechanical yard area will be provided. Spread footings bearing on reworked soils or structural fill will be utilized to support steel columns. The exterior walls will be supported on soil supported concrete grade beams running between spread footings. In addition to the office and meeting areas, break areas and a kitchen will be provided. The typical exterior materials include brick and cast stone masonry, metal panels, and solar responsive window glazing. The roofing membrane will be single ply mechanically fastened PVC. The mechanical systems shall include energy recovery units (ERUs), with outdoor air ducted directly to Variable Air Volume (VAV) Air Handling Units (AHUs). Cooling will be provided by a high efficiency air cooled chiller and heating will be provided by high efficiency natural gas fired boilers. The completed project shall certified to receive a United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) rating of Silver. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy: (a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects. (b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will (1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law. Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement Clause 52.222-34 Project Labor Agreement. In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions: a. Should PLAs be executed on selected large dollar contracts within the above referenced location by the Louisville District? What other factors should the Corps consider before deciding to include PLA provisions in a Louisville District contract? What type of project should or should not be considered for PLA? b. Is the use of PLAs effective in achieving economy and efficiency in Federal procurement? What is the estimated relative cost impact, or any other economies or efficiencies derived by the Federal Government, if using PLAs? Will a PLA impact the cost of submitting an offer? c. Is the use of PLAs effective in producing labor-management stability? Have labor disputes or other labor issues contributed to project delays in the local area? d. Is the use of PLAs conducive to ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other relevant matters? Are there instances where these standards have not been met on Federal contracts in the local area? Were PLAs used for those specific contracts? e. Projects will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades. Do you foresee any work on projects that may result in both the prime contractor and at least one subcontractor, or two or more subcontractors, employing the same trade? f. Are there concerns by prime contractors on the availability of skilled construction labor? Information may reference current apprenticeship statistics and workforce age demographics. g. Completion of anticipated projects will require an extensive performance periods. Will a PLA impact the completion time? What is the anticipated volatility in the labor market for the trades required for the execution of the project? Would a PLA benefit a project which contains a unique and compelling mission-critical schedule? h. Where have PLAs been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of this project? i. Will the use of PLAs impact the ability of potential Offerors and subcontractors to meet small-business utilization goals? Please provide your comments via e-mail to April.C.Judd@usace.army.mil no later than by 1:00 PM EST on 15 June 2016.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA27/W912QR-16-PLA-ROBINSCMC/listing.html)
- Record
- SN04138499-W 20160605/160603234854-2e4ab00cb72659fafadd2aec95503ca5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |