Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 07, 2016 FBO #5310
SOURCES SOUGHT

S -- UESC at Fort Greely Decentralize Heating System/Convert to NG

Notice Date
6/5/2016
 
Notice Type
Sources Sought
 
NAICS
221210 — Natural Gas Distribution
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE HNC, Huntsville, P. O. Box 1600, Huntsville, Alabama, 35807-4301, United States
 
ZIP Code
35807-4301
 
Solicitation Number
W912DY-16-R-UES9
 
Archive Date
7/23/2016
 
Point of Contact
BARBARA L. OSTERKAMP, Phone: 2568951782, Jeffery D. Byrd, Phone: 2568951543
 
E-Mail Address
barbara.l.osterkamp@usace.army.mil, jeffery.d.byrd@usace.army.mil
(barbara.l.osterkamp@usace.army.mil, jeffery.d.byrd@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
S--Utility Services Utility Energy Service Contract (UESC), Energy Conservation Services Solicitation Number: W912DY16RUES9 Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: USACE HNC, Huntsville Classification Code: S -- Utilities NAICS Code: 221210 Natural Gas Distribution 221122 Electric Power Distribution 221310 Water Supply and Irrigation Systems 1. Contract Information: The U.S. Government is the nation's single largest energy consumer. Due to the magnitude of funds spent on energy in support of Government operations and the steady inflation of such costs, the Government is re-evaluating its operations and reducing its energy consumption. Executive Order 13693 of March 19, 2015, requires a reduction in agency building energy intensity measured in British thermal units per gross square foot by 2.5% annually through the end of fiscal year 2025, relative to the baseline of the agency's building energy use in fiscal year 2015, and a reduction in agency potable water consumption intensity by 36% by fiscal year 2025, through reductions of 2% annually through fiscal year 2025, relative to a baseline of the agency's water consumption in fiscal year 2007. The primary purpose of the proposed acquisition is to acquire the design, implementation, and operation of a Utility Energy Services Contract (UESC) project for US Army Garrison (USAG) Fort Greely, Alaska. 2. Background: 10 U.S.C. 2913 Energy Savings Contracts and Activities, is the overarching bill for shared energy savings contracting for the DOD. The Secretary of Defense through Defense Energy Program Policy Memorandum (DEPPM) 91-2 dated March 19, 1991, directed the Secretary of the Army to coordinate with the Secretaries of the Navy and Air Force and with the heads of Defense Agencies to develop an integrated strategy for all Components within the service territory of each utility to coordinate activity and maximize savings. DEPPM 94-1, issued December 20, 1993, established the guidelines for participation in Energy Conservation and Demand Side Management (EC/DSM) programs offered by or to be negotiated with public utilities. 42 U.S.C. § 8256(c)(3) encourages agencies to enter into contracts with electric, water and gas utilities to design cost-effective demand management and conservation incentive programs to address the unique needs of facilities. Four key elements of this section are highlighted below. - Agencies are authorized and encouraged to participate in programs to increase energy efficiency and water conservation or manage electricity demand conducted by gas, water, or electric utilities and generally available to customers of such utilities. - Each agency may accept any financial incentive, goods, or services generally available from any such utility, to increase energy efficiency or to conserve water or manage electricity demand. - Each agency is encouraged to enter into negotiations with electric, water, and gas utilities to design cost-effective demand management and conservation incentive programs to address the unique needs of facilities utilized by such agency. - If an agency satisfies the criteria that generally apply to other customers of a utility incentive program, such agency may not be denied collection of rebates or other incentives. 2. Description of the Requirement: The requirement at USAG Fort Greely AK, is for comprehensive UESC services not limited to these Energy Conservation Measures: Decentralize the heating distribution system and configure system for natural gas usage. 3. Project Information: A UESC is a contracting vehicle that allows agencies to accomplish energy savings projects for their facilities without up-front capital costs and without special Congressional appropriations to pay for the improvements. Under a UESC contract, the selected UESC utility provider (Utility) will provide their own funding, provide financed funding, or a combination of their own and financed funding, for an energy conservation project that will be repaid from utility bill savings. The Utility will conduct a comprehensive energy audit to identify improvements that will result in energy savings. With coordination and approval of the Government, the Utility will design and construct an energy savings project and provide assurance that the improvements will result in savings sufficient to pay for the project over a maximum 25 year repayment period. The Utility will also develop a savings assurance plan and arrange project financing. The project energy savings will be measured over the course of the financing period. 4. Submission Requirements: The Government does not intend to rank submittals or reply to interested companies/firms. This synopsis is for Market Research purposes only and is not a Request For Proposal (RFP) or a Request For Quote (RFQ). The Government will not reimburse respondents for any costs incurred in preparation of a response to this notice. Your firm's response is requested no later than 4:00 Central Time, Friday, July 8, 2016. Send responses by email to Jeffery.d.byrd@usace.army.mil and Barbara.l.osterkamp@usace.army.mil. Responses should be limited to a maximum of 10 pages. No hard copy or facsimile submissions will be accepted. Cover letters and extraneous materials such as brochures will not be considered. Personal visits for the purpose of discussing this announcement will not be considered or scheduled. Sources Sought Questionnaire. 1. Is your business currently an authorized utility provider to the USAG Fort Greely AK service area? 2. What is the name and address of your business? 3. Identify a responsible point of contact who can be contacted regarding your response, their phone number, and email address. 4. Is your firm a large business, small business, a certified 8(a) small business, certified HUBZone business and/or Service Disabled veteran owned concern? List all that apply. 5. Provide your company's project annual and maximum financing capability over a 25 year period in dollars that could be utilized for this contract for a project taking approximately 9-16 months to develop and award, plus an additional 12-18 months to complete construction. Assume no advance payment or financial assistance is available from the Government prior to or during the construction phase. 6. Provide no more than three (3) examples of financed energy conservation projects for which you were the prime contractor, a joint venture partner, or a first-tier subcontractor responsible for developing, financing, and/or managing the design, construction and/or post construction effort. Identify the scope of your contractual responsibilities, location, client, and size of the project in terms of construction cost and total financed amount. 7. Identify the financier and the amount financed (if any) for the above listed project(s). Provide financing source reference(s) including points of contact for telephonic confirmation of the dollar amount claimed for project financing capability. 8. Does your company have the capability to identify and obtain all permits required by Federal, state, local and installation agencies, including the capability of complying with environmental laws and regulations? 9. Does your company have the ability to work in the USAG Fort Greely AK area? 11. Does your company have experience or has partnered with a firm, in performing investment grade feasibility studies, economic analysis, such as Life Cycle Cost, Risk, and Return on Investment (ROI), which may be required in order to determine/demonstrate the financial viability of a proposed project? 12. Does your company have experience coordinating rebates, other incentives, and any potential interconnect/transmission discussions/agreements that may be necessary as part of a proposed project? 13. Is your company capable and qualified to search out energy and ancillary cost savings potentials in the USAG Fort Greely AK area? 14. Is your company capable of developing procedures, courses of action, steps, repairs, or changes in equipment which result in lower energy costs? 15. Is your company qualified and capable of providing work plans/designs? 16. Does your company have the capability to perform the construction efforts to include site security (fencing, lighting, and/or guard service) if required by the project? 17. Is your company capable of and qualified to provide maintenance and repair services for any energy related equipment including computer software systems? 18. Is your company capable of providing yearly equipment inspections to assure the equipment is being operated properly and maintenance is being performed? 19. Does your company have the capability to provide all personnel including dedicated project management, tools, equipment, transportation, materials, and supervision needed to safely and efficiently perform a UESC project? 20. Does your company have the capability to implement, maintain, and control a system for identification, preparation, reproduction, distribution, and maintenance of all documentation needed for its management of a UESC contract? 21. Does your company have the capability to provide and maintain an effective quality control program? 22. Does your company have the capability to provide, maintain, and execute an approved site safety and health plan? 23. Does your company have the capability to provide metering, monitoring, measuring, or testing equipment to verify savings? 24. Does your company have the capability to coordinate all work from all trades including subcontractors and suppliers for a UESC project? 25. Does your company have expertise and experience with decentralizing a central heating system and conversion from fuel oil to natural gas? Contracting Office Address: USACE HNC, Huntsville P. O. Box 1600 Huntsville, AL 35807-4301 Place of Performance: USACE HNC Huntsville P. O. Box 1600 Huntsville AL 35807-4301 US Points of Contact: Jeffery D. Byrd, 256-895-1543, or Barbara L. Osterkamp, 256-895-1782
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA87/W912DY-16-R-UES9/listing.html)
 
Place of Performance
Address: US Army Garrison Fort Greely, Delta Junction, Alaska, 99731, United States
Zip Code: 99731
 
Record
SN04138707-W 20160607/160605233051-fa5af35d52a7bec76bc1e2ab8e57783a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.